ID Dateup Author Type Category Subject Text Attachments
  302   Wed Jul 4 18:30:51 2018 KojiElectronicsCharacterizationEOM circuit modelsThe circuit models for the 3IFO EOM (before
mods) were made using LISO.
Then the modification plan was made
 eom_models.pdfeom9.pdfeom24.pdfeom45.pdf180704_3IFO_EOM_model.zip 
  303   Thu Jul 26 20:57:07 2018 KojiElectronicsCharacterization9MHz port tuned impedance[Rich Koji]

The 9MHz port was tuned and the
impedance was measured.
 impedance_eom.pdfeom9.pdfeom_models_9MHz.pdf 
  304   Tue Aug 7 15:43:12 2018 KojiElectronicsCharacterizationNew LLO EOM stuffed[Rich, Dean, Koji]

Stuffed all inductors for the new
LLO EOM. As the impedances were sensitive
 P_20180806_154457.jpgimpedance_eom.pdfimpedance_eom_zoom.pdf 
  305   Wed Aug 8 17:32:56 2018 Rich AbbottGeneralCharacterizationModulation Index Test Setup at 40m LabAttached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator
 40mLabModIndexSetup.pdf 
  306   Thu Aug 9 11:24:29 2018 KojiGeneralCharacterizationModulation Index Test Setup at 40m Lab[Rich Koji]

The impedances of the new LLO EOM
were measured with the beat note setup at
 modulation_depth.pdfmodulation_depth_zoom.pdf 
  307   Wed Aug 29 11:06:30 2018 KojiGeneralGeneralRF AM RIN and dBc conversion0. If you have an RF signal whose waveform
is , the amplitude is constant and 1.
  
  308   Sun Sep 23 19:42:21 2018 KojiOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirror[Koji Gautam]


With Gautam's help,
I ran a coating design code for an HR mirror
 reflectivities.pngtransmission.pngphase_diff.pngphase_difference_histogram.png 
  309   Thu Sep 27 20:19:15 2018 AaronOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirrorI started some analytic calculations of
how OMC mirror motion would add to the noise
in the BHD. I want to make some prettier
  
  310   Thu Nov 1 19:57:32 2018 AaronOpticsGeneralMontecarlo simulation of the phase difference between P and S pols for a modeled HR mirrorI'm still not satisfied/done with the
solution to this, but this has gone too long
without an update and anyway probably someone
  
  311   Thu Jan 10 20:42:54 2019 KojiOpticsCharacterizationFSR / HOM Test of OMC SN002OMC SN002 = Former LHO OMC
which CM1 was destroyed by the lock loss
pulse in 2016. This OMC needs to be optically
  
  312   Thu Jan 10 20:45:00 2019 KojiOpticsCharacterizationPZT test cableAs OMC SN002 already has the PZTs connected
to the Mighty-Mouse connector, a test cable
with a female mighty-mouse connector was
 OMC_PZT_wiring.pdf 
  313   Sat Jan 12 22:49:11 2019 KojiOpticsCharacterizationPM-SM patch cable mode cleaning effectMode
cleaning capability of an optical fiber was
measured. The conclusion
 fiber_mode_cleaning.pdf 
  314   Fri Feb 1 12:52:12 2019 KojiMechanicsGeneralPZT deformation simulationA simple COMSOL simulation was run to see
how the PZT deforms as the voltage applied.

Use the geometry of the ring PZT
 pzt.png 
  315   Sat Feb 2 16:17:13 2019 KojiOpticsCharacterizationSummary: OMC(001) HOM structure recalculationEach peak of the transfer function measurement
was fitted again with a complex function:

 OMC_HOM_130531.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_HOM.pdf 
  316   Sat Feb 2 20:03:19 2019 KojiOpticsCharacterizationSummary: OMC(002) HOM structure recalculation (before mirror replacement)OMC (002)
History: Measurement date
2013/10/11, Installed to L1 2013/XX
 OMC_HOM_131011.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf 
  317   Sat Feb 2 20:28:21 2019 KojiOpticsCharacterizationSummary: OMC(003) HOM structure recalculationOMC (003)
History: Measurement date
2014/7/5, Stored for I1, Installed to H1
 OMC_HOM_140705.pdfHOM_PZTV_PZT1_0V.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT_HOM.pdf 
  318   Sat Feb 2 20:35:02 2019 KojiOpticsCharacterization Summary: OMC(002) HOM structure recalculation (after mirror replacement) OMC (002) after repair
History:Mirror replacement
after the damage at H1. Measurement date
 OMC_HOM_190110.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT.pdf 
  319   Tue Mar 19 17:30:25 2019 KojiGeneralCharacterizationOMC (002) Test itemsOMC #002 Optical tests


FSR
measurement (done, 2019/1/8-9, 2019/4/1)
  
  320   Thu Mar 28 16:36:52 2019 KojiMechanicsCharacterizationOMC(002) PZT characterization As
performed in the ELOG 202, the PZTs of
the OMC 002 were tested.
 PZT_Scan.pdfOMC_PZT_Response.pdf 
  321   Thu Apr 4 20:07:39 2019 KojiSupplyGeneralPurchase== Office Depot ==
Really
Useful Box 9L x 6 (delivered)
  
  322   Fri Apr 5 01:07:18 2019 KojiOpticsCharacterizationOMC(002): transmitted beam imagesThere was a concern that the transmission
from CM1 has additional fringes. The shape
of the transmitted beams from CM1, CM2, and
 CM1trasns.pngCM2trasns.pngFM2trans2.png 
  323   Fri Apr 5 01:08:17 2019 KojiOpticsCharacterizationOMC(002): DCPD / QPD alignmentThe beam height in the cavity became totally
different from the previous one and the shims
needed to be much thicker than before. This
 IMG_7521.JPGIMG_7529.JPGIMG_7539.JPGIMG_7541.JPG 
  324   Fri Apr 5 20:50:54 2019 KojiOpticsCharacterizationOMC(002): QPD alignmentQPD#             
QPD1      
QPD2
 P_20190405_215906.jpgP_20190405_215927.jpg 
  325   Fri Apr 5 23:30:20 2019 KojiGeneralGeneralOMC (002) repair completedOMC(002)
repair completed

When the cable harness of OMC(004)
 P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg 
  326   Wed Apr 10 19:22:24 2019 KojiGeneralGeneralOMC(004): preparation for the PZT subassembly bonding Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure)
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  328   Thu Apr 11 12:15:31 2019 KojiMechanicsConfigurationPZT sub assy mirror orientations   PZT_subassy.pngPZT_subassy.pdf 
  329   Thu Apr 11 21:22:26 2019 KojiMechanicsGeneralOMC(004): PZT sub-assembly gluing[Koji Stephen]

The four PZT sub-assemblies were
glued in the gluing fixtures. There were
 IMG_7561.jpgIMG_7567.jpg 
  330   Thu Apr 11 21:22:58 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly air baking[Stephen Koji]

The baking of the PZT subassemblies
was more complicated than we initially thought.
 temp_profile.pdfbake.xlsx 
  331   Sun Apr 14 23:58:49 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection[Koji Stephen]

(Friday afternoon) We retrieved
the PZT sub-assemblies to the clean room.
  
  332   Mon Apr 15 00:08:32 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7)Sub-ASSY
#7

Probably the best glued unit among
 6x 
  333   Mon Apr 15 00:39:04 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8)Sub-ASSY
#8

Probably the best glued unit among
 8x 
  334   Mon Apr 15 01:07:30 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9)Sub-ASSY
#9

The most fractured unit among four.
 7x 
  335   Mon Apr 15 01:23:45 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10) Sub-ASSY
#10

Attachment #1: Mounting
 IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg 
  336   Mon Apr 15 21:11:49 2019 PhilipOpticsCharacterizationOMC(004): PZT testing for spare OMC[Koji, Philip]

Today we tested the functionality
of the four remaining PZTs (11,12,13 and
  
  337   Tue Apr 16 11:36:36 2019 KojiOpticsCharacterizationOMC(004): PZT testing for spare OMCAttachment 1: Shadow sensor
setup for the PZT displacement test

Attachment 2:
 9x 
  338   Tue Apr 16 16:35:09 2019 KojiOpticsConfigurationOMC(004): Glass breadboard selectionD1200105 SN006 was selected as
the breadboard for OMC(004).
The reason is the best parallelism
 BB_selection.pdf 
  339   Tue Apr 16 16:40:26 2019 KojiGeneralConfigurationOMC(004): A Mirror selectionWe are going to use A5 and A14
for FM1 and FM2. (The role of these
two can be swapped)
 A_Mirror_selection.pdf 
  340   Tue Apr 16 16:52:36 2019 KojiOpticsConfigurationOMC(004): B Mirror selectionWe are going to use B6 for the
DCPD BS (BS2), and B1 for the QPD BS (BS3).
Their role can not
 B_Mirror_selection.pdf 
  341   Tue Apr 16 17:24:56 2019 KojiOpticsConfigurationOMC(004): E Mirror selectionWe are going to use E6, E9, E11, and E14
for BS1, SM1, SM2, and SM3. They (and E18)
are all very similar.
 E_Mirror_selection.pdf 
  342   Tue Apr 16 21:16:11 2019 KojiOpticsCharacterizationOMC(004): PZT testing for spare OMCAfter having dug into the past email, it
turned out that these wires were the ones
already replaced from the original teflonwires.
  
  343   Tue Apr 16 23:11:43 2019 KojiGeneralGeneralBorrowed items from the other labsApr 16, 2019
Borrowed
two laser goggles from the 40m. (Returned
  
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  345   Wed Apr 17 10:30:37 2019 PhilipOpticsGeneralOMC optical set-up day 1[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
  
  346   Thu Apr 18 20:47:54 2019 JoeOptics OMC initial alignment and locking[Joe, Phillip, Koji, Stephen]

*draft post, please add anymore
info if I missed something*
 IMG_7676.JPGIMG_7666.JPGIMG_7670.JPGIMG_7883.JPGIMG_7882.JPG 
  347   Fri Apr 19 09:21:07 2019 PhilipOptics Cleaning of OMC opticsach[Joe, Phillip, Koji,
Stephen]

Work from 17.04.2019
 IMG_7877.JPGIMG_7883.JPGIMG_7884.JPG 
  348   Fri Apr 19 09:35:28 2019 JoeGeneral Adjusting cavity axis, re-alignment of OMC and locking[koji,philip,
joe, liyuan,
steven]
 FSR_Scan_Fitfsrdata.pdfIMG_7679_cropped.jpg 
  349   Fri Apr 19 11:34:19 2019 KojiOptics OMC initial alignment and lockingThe spot on CM1 was found displaced by
3.4mm (horiz.) and 3.0mm (vert.)
in the upper right direction looking from
 misalignment1.pdf 
  350   Sat Apr 20 00:50:12 2019 KojiOpticsCharacterizationOMC(004): Spot positionsSimilarly to OMC
ELOG 349 the spot positions after the
replacement of CM2 were measured (Attachment
 misalignment2.pdfmisalignment3.pdf 
  351   Mon Apr 22 09:54:21 2019 JoeGeneral Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR[Koji,Joe,Philip,stephen]

in units 20um per div on the micrometer
[n.b. we reailised that its 10um per div
 CM1_IMG_7699.jpgCM2_IMG_7697.jpg 