40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 7 of 9
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
410 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
,
9
Next
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven
Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab
Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab
Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion
Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items
Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking
Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection
Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7)
6x
Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8)
8x
Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9)
7x
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)
Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking
Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR
Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding
Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding
Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!
Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake
Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10
Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake
Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake
Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending
Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending
Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check
Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A
Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting
Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting
Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika
Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL
Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan
Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs
Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement
Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement
Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched
Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect
Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier
Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools
Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired
Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed
Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
,
9
Next
ELOG V3.1.3-