324
|
Fri Apr 5 20:50:54 2019 |
Koji | Optics | Characterization | OMC(002): QPD alignment | QPD#
QPD1
QPD2 |
 |
323
|
Fri Apr 5 01:08:17 2019 |
Koji | Optics | Characterization | OMC(002): DCPD / QPD alignment | The beam height in the cavity became totally
different from the previous one and the shims
needed to be much thicker than before. This |
   |
322
|
Fri Apr 5 01:07:18 2019 |
Koji | Optics | Characterization | OMC(002): transmitted beam images | There was a concern that the transmission
from CM1 has additional fringes. The shape
of the transmitted beams from CM1, CM2, and |
  |
321
|
Thu Apr 4 20:07:39 2019 |
Koji | Supply | General | Purchase | == Office Depot ==
Really
Useful Box 9L x 6 (delivered) |
|
320
|
Thu Mar 28 16:36:52 2019 |
Koji | Mechanics | Characterization | OMC(002) PZT characterization | As
performed in the ELOG 202, the PZTs of
the OMC 002 were tested. |
 |
319
|
Tue Mar 19 17:30:25 2019 |
Koji | General | Characterization | OMC (002) Test items | OMC #002 Optical tests
FSR
measurement (done, 2019/1/8-9, 2019/4/1)
|
|
318
|
Sat Feb 2 20:35:02 2019 |
Koji | Optics | Characterization | Summary: OMC(002) HOM structure recalculation (after mirror replacement) | OMC (002) after repair
History:Mirror replacement
after the damage at H1. Measurement date |
   |
317
|
Sat Feb 2 20:28:21 2019 |
Koji | Optics | Characterization | Summary: OMC(003) HOM structure recalculation | OMC (003)
History: Measurement date
2014/7/5, Stored for I1, Installed to H1 |
   |
316
|
Sat Feb 2 20:03:19 2019 |
Koji | Optics | Characterization | Summary: OMC(002) HOM structure recalculation (before mirror replacement) | OMC (002)
History: Measurement date
2013/10/11, Installed to L1 2013/XX |
   |
315
|
Sat Feb 2 16:17:13 2019 |
Koji | Optics | Characterization | Summary: OMC(001) HOM structure recalculation | Each peak of the transfer function measurement
was fitted again with a complex function:
|
   |
314
|
Fri Feb 1 12:52:12 2019 |
Koji | Mechanics | General | PZT deformation simulation | A simple COMSOL simulation was run to see
how the PZT deforms as the voltage applied.
Use the geometry of the ring PZT |
|
313
|
Sat Jan 12 22:49:11 2019 |
Koji | Optics | Characterization | PM-SM patch cable mode cleaning effect | Mode
cleaning capability of an optical fiber was
measured. The conclusion |
|
312
|
Thu Jan 10 20:45:00 2019 |
Koji | Optics | Characterization | PZT test cable | As OMC SN002 already has the PZTs connected
to the Mighty-Mouse connector, a test cable
with a female mighty-mouse connector was |
|
311
|
Thu Jan 10 20:42:54 2019 |
Koji | Optics | Characterization | FSR / HOM Test of OMC SN002 | OMC SN002 = Former LHO OMC
which CM1 was destroyed by the lock loss
pulse in 2016. This OMC needs to be optically |
|
310
|
Thu Nov 1 19:57:32 2018 |
Aaron | Optics | General | Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror | I'm still not satisfied/done with the
solution to this, but this has gone too long
without an update and anyway probably someone |
|
309
|
Thu Sep 27 20:19:15 2018 |
Aaron | Optics | General | Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror | I started some analytic calculations of
how OMC mirror motion would add to the noise
in the BHD. I want to make some prettier |
|
308
|
Sun Sep 23 19:42:21 2018 |
Koji | Optics | General | Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror | [Koji Gautam]
With Gautam's help,
I ran a coating design code for an HR mirror |
   |
307
|
Wed Aug 29 11:06:30 2018 |
Koji | General | General | RF AM RIN and dBc conversion | 0. If you have an RF signal whose waveform
is , the amplitude is constant and 1. |
|
306
|
Thu Aug 9 11:24:29 2018 |
Koji | General | Characterization | Modulation Index Test Setup at 40m Lab | [Rich Koji]
The impedances of the new LLO EOM
were measured with the beat note setup at |
 |
305
|
Wed Aug 8 17:32:56 2018 |
Rich Abbott | General | Characterization | Modulation Index Test Setup at 40m Lab | Attached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator |
|
304
|
Tue Aug 7 15:43:12 2018 |
Koji | Electronics | Characterization | New LLO EOM stuffed | [Rich, Dean, Koji]
Stuffed all inductors for the new
LLO EOM. As the impedances were sensitive |
  |
303
|
Thu Jul 26 20:57:07 2018 |
Koji | Electronics | Characterization | 9MHz port tuned impedance | [Rich Koji]
The 9MHz port was tuned and the
impedance was measured. |
  |
302
|
Wed Jul 4 18:30:51 2018 |
Koji | Electronics | Characterization | EOM circuit models | The circuit models for the 3IFO EOM (before
mods) were made using LISO.
Then the modification plan was made |
    |
301
|
Tue Jul 3 12:07:47 2018 |
Rich Abbott | Electronics | Characterization | Notes on 3rd IFO EOM | Attached please see my notes summarizing
the models for the electrodes and inductors
within the 3rd IFO EOM |
|
300
|
Mon Jul 2 15:27:31 2018 |
Rich Abbott | Electronics | General | Work on EOM (3rd IFO unit) | Koji, Rich
We took apart the unit removed
from the 3rd IFO (Unit serial number aLIGO |
|
299
|
Mon Jul 2 12:29:01 2018 |
Koji | Electronics | Characterization | Impedances of individual components (3IFO EOM) | [Rich Koji]
The impedances of the individual
components from the 3IFO EOM (before modification) |
    |
298
|
Mon Jul 2 11:30:22 2018 |
Koji | Electronics | Characterization | 3IFO EOM impedance measurement | [Rich Koji]
3IFO EOM (before any modification)
was tested to measure the impedance of each |
 |
297
|
Wed May 30 17:44:23 2018 |
Koji | Optics | Characterization | 3IFO EOM surface check | 3IFO EOM dark microscope images courtesy
by GariLynn and Rich
Attachment1/2: Hole #1 |
    |
296
|
Wed May 30 16:40:38 2018 |
Koji | Mechanics | Characterization | EOM mount stability test | https://awiki.ligo-wa.caltech.edu/wiki/EOM_Mount_Stability |
|
295
|
Tue May 15 19:53:45 2018 |
Koji | Optics | General | EOM Q comparison | Qs' were estimated with a lorentzian
function (eye fit)
|
|
294
|
Sat May 5 22:51:04 2018 |
Koji | Optics | General | 3IFO EOM Optical test | The 3IFO EOM test performed at
the 40m. Result: 40m
ELOG 13819 |
|
293
|
Thu May 3 21:45:58 2018 |
awade | General | Loan / Lending | Borrowed toaster oven | I’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. |
|
292
|
Mon Apr 2 17:27:04 2018 |
Koji | Optics | Characterization | aLIGO EOM test | 2nd optical test http://nodus.ligo.caltech.edu:8080/40m/13725 |
|
291
|
Thu Feb 22 20:21:02 2018 |
Koji | Optics | Characterization | aLIGO EOM test | POSTED
to 40m ELOG |
|
290
|
Thu Nov 30 12:18:41 2017 |
Stephen | General | General | Preparation for Modal Testing on 4 December | Norna Robertson, Stephen Appert ||
29 Nov 2017, 2 pm to 4 pm ||
227 Downs, CIT |
|
289
|
Mon Nov 27 20:24:24 2017 |
Koji | General | General | A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm | Attachment 1: The PD was
removed from the transmission side of the
OMC #002 (former LHO OMC - the one blasted |
6x |
288
|
Fri Sep 8 15:14:05 2017 |
Koji | Facility | General | Preparation for the plumbing work | [Steve, Aaron, Koji]
We've finished the preparation
for the forthcoming plumbing work on (nominally) |
7x |
287
|
Sat Jul 29 21:42:51 2017 |
Koji | Electronics | Characterization | PDH amp | The polarities indicated in the right circuits
were opposite, obviously. |
|
286
|
Sat Jul 29 18:44:38 2017 |
rana | Electronics | Characterization | PDH amp | attachment 6: DCPD preamp looks like the
opamp is wired for positive feedback? |
|
285
|
Wed Jul 5 16:59:44 2017 |
Koji | General | General | The OMC #002 was packed | [Stephen Koji]
The OMC #002 was packed for the
transportation to Downs. |
|
284
|
Sat Jul 1 21:33:18 2017 |
Koji | General | General | Some purchase notes | - Forgot to close the cylinder valve...
v HEPA prefilter (20"x20"x1"
MERV 7) |
|
283
|
Sat Jul 1 15:29:57 2017 |
Koji | Optics | General | Black glass cleaning / Final bonding for the emergency repair for OMC #002 | [Alena, Koji]
Report of the work on June
30. |
    |
282
|
Fri Jun 23 10:55:07 2017 |
Koji | Optics | General | Dust layer on black glass beam dumps? | I wondered why the black glass beam dumps
looked not as shiny as before. It was in
fact a layer of dusts (or contaminants) accumulated |
|
281
|
Fri Jun 23 01:58:11 2017 |
Koji | Optics | General | OMC #002 Repair - CM1 gluing | [Alena, Koji]
Jun 21: Alena and Koji
worked on gluing of the CM1 mirror on the |
6x |
280
|
Tue Jun 6 22:00:36 2017 |
Koji | General | Configuration | Trans RF PD setup | - Replaced the PZT with the one used from
the beginning. This must be PZT #21. After
the replacement, the spot positions look |
|
279
|
Tue Jun 6 00:49:48 2017 |
Koji | General | Configuration | Trans RF PD setup | Last week, I further worked on the RF system
to install 20dB coupler on the agilent unit
and setup the R channel. This allowed me |
|
278
|
Fri May 26 21:53:20 2017 |
Koji | General | Configuration | Trans RF PD setup | Recent work
- DC output of the trans RF PD
was connected to the BNC patch panel. => |
|
277
|
Tue May 16 19:05:18 2017 |
Koji | Optics | Configuration | OMC SN002 fix - temporary optics | Working on the SN002 OMC fix. Checked the
inventory. I think I am using C8 mirror as
the new temporary CM1 and PZT24 as the new |
|
276
|
Tue Mar 28 21:04:27 2017 |
Koji | Electronics | Characterization | PDH amp | Attachment 1: PDH amp
RF part (before the preamp was installed)
Attachment 2: |
6x |
275
|
Thu Feb 16 17:23:12 2017 |
Koji | Supply | General | Purchase |
BNC Patch Panel
8x
Amphenol Connex 112443 / Isolated BNC FEMALE
TO FEMALE BULKHEAD ISOLATED ADAPTER - 50 |
|