  110   Sat Apr 13 21:06:02 2013 KojiOpticsGeneralOMC Bottom-side: cavity glued[Jeff, Zach, Lisa, Koji]
Gluing of the cavity mirrors went
 Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf 
  109   Fri Apr 12 09:25:31 2013 KojiOpticsCharacterizationAlignment of the OMC (without glue)[Zach Koji]
The first attempt not to touch the
curved mirrors did not work. (Not surprising)
  
  108   Thu Apr 11 15:10:22 2013 KojiGeneralGeneralOMC Progress[Zach, Jeff, Koji]

- Jeff configured the bottom
side template to have a nominal value
  
  107   Wed Apr 10 00:40:30 2013 ZachOpticsConfigurationfauxMC locked[Koji, Zach]
 fauxMC_labeled.jpg 
  106   Tue Apr 9 13:56:09 2013 KojiOpticsGeneralPZT assembly post gluing / pre baking pictures 
  
  105   Mon Apr 8 23:42:33 2013 KojiOpticsConfigurationFake OMC roughly alignedMode matching:
 
 beam_profile.pdfmode_matching.pdf 
  104   Mon Apr 8 21:11:14 2013 KojiOpticsGeneralPZT assembly gluing[Jeff, Zach, Koji] 
PZT assembly gluing
Glue gun -> to be returned to
  
  103   Mon Apr 8 20:56:52 2013 KojiOpticsConfigurationPZT & Curverd Mirror arrangementAssembly #1:
Mounting Prism #16
PZT #26
 PZT_assembly.pdf 
  102   Mon Apr 8 11:49:18 2013 KojiMechanicsCharacterizationPZT actuator tested at LLOTest result of the PZTs by Valera and Ryan
PZT  Length Angle
 #
  [nm/V] [urad/um]
 11  14.5   17.6
  
  101   Mon Apr 8 11:29:08 2013 KojiOpticsCharacterizationMirror/PZT Characterization links
    Mirror
List
    http://nodus.ligo.caltech.edu:8080/OMC_Lab/152
  
  100   Mon Apr 8 11:11:37 2013 KojiOpticsCharacterizationMore Mirror T measurementMore Ts of the mirrors were measured.
A mirror specification:
Request: 8300+/-800 ppm
  
  99   Fri Apr 5 18:18:36 2013 ZachOpticsConfigurationAOM probably broken

    

       
            
 Isomet_1250C_zin_4_5_13.png 
  98   Fri Apr 5 14:39:26 2013 KojiMechanicsCharacterizationCalibration of the test PZTs after the heat cureWe attached fused silica windows on the
test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought
 shadow_sensor_calib_after_bake.pdfPZTresponse.pdf 
  97   Thu Apr 4 23:44:52 2013 KojiOpticsConfigurationBeam launched into fiberWe had to move our flipper mirror to share
the beam between Peter's setup and ours as
our flipper is at the place where the ISS
  
  96   Thu Apr 4 01:43:06 2013 KojiOpticsCharacterizationMirror T measurement[Zach, Koji]
The measurement setup for the transmission
measurement has been made at the output of
  
  95   Thu Apr 4 01:35:04 2013 KojiOpticsCharacterizationMode matching to the OMC cavityThe fiber output was matched with the lenses
on a small bread board.
The detailed configuration is found
  
  94   Thu Apr 4 00:35:42 2013 ZachOpticsConfigurationMMT installed on breadboard, periscope built[Koji, Zach]
 2013-04-03_23.43.00.jpg 
  93   Wed Apr 3 18:42:45 2013 KojiOpticsGeneralEP30-2 gluing testEP30-2 gluing test
  
  92   Wed Apr 3 17:39:38 2013 KojiMechanicsCharacterizationCalibration of the test PZTs before the glue testWe want to make sure the responses of the
PZT actuator does not change after the EP30-2
gluing.
 P4033491.JPGshadow_sensor_calib.pdf 
  91   Mon Apr 1 18:17:01 2013 KojiOpticsGeneralMirror curvature center testLocations of the curvature minimum
on the OMC curved mirrors have been measured.
 6x 
  90   Mon Apr 1 10:28:03 2013 KojiMechanicsGeneralAdditional UV blast for the top surface[Koji, Lisa, Jeff, Zach]

Jeffs concern after talking with the
 P3283483.JPGP3283459.jpgP3283473.JPG 
  89   Mon Apr 1 03:23:48 2013 KojiOpticsGeneralUV power calibration[Koji Lisa Jeff Zach]
Eric G bought a UV power meter from
American Ultraviolet.
  
  88   Mon Apr 1 03:13:41 2013 KojiOpticsGeneralFailure of PZT-glass joints[Koji, Jeff, Zach, Lisa]
We glued a test PZT-mirror assembly
last week in order to make sure the heat
  
  87   Fri Mar 29 08:55:00 2013 ZachOpticsConfigurationBeam launched into fiber

    

       
            
  
  86   Thu Mar 28 03:37:07 2013 ZachOpticsConfigurationTest setup input optics progress[Lisa, Zach]
Last night (Tuesday), I finished
setting up and aligning most of the input
 OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg 
  85   Wed Mar 27 20:55:10 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 28 Thu28 March (Thu): 

    Rebuild the bottom template
in the lab
    Place the bottom
  
  84   Wed Mar 27 20:54:54 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 27 Wed27 March (Wed)
- AOM drift investigation (Lisa,
Zach)
  
  83   Wed Mar 27 20:54:45 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 26 Mon26 March (Tue):
- Curved mirror characterization
(Koji, done)
  
  82   Tue Mar 26 22:33:07 2013 KojiGeneralGeneralLoan for the OMC buildingLoan from PSL Lab
- 300mm mirror with Ultima mount
and pedestal
  
  81   Mon Mar 25 19:31:16 2013 KojiOpticsGeneralOMC Top-side gluing[Koji Jeff Zach]  
AAA
 P3253353.jpgP3253372.jpgP3253394.jpgP3253400.jpg 
  80   Mon Mar 25 18:34:25 2013 KojiGeneralGeneralOMC building plan / procedure ~ Mar 25 Mon25 March (Mon): 
Inspect the test PZT assembly

    => Give it to Bob. 
  
  79   Mon Mar 25 02:04:05 2013 KojiGeneralGeneralOMC building plan / procedure ~ WB18WB 18 March 

    Diode test
    
        Dark current
  
  78   Sat Mar 23 16:36:15 2013 KojiElectronicsCharacterizationDiode QE measurementQuantum efficiencies of the C30665GH
diodes were measured. 
- The diode was biased by the FEMTO
 P3213308.JPGP3213310.JPG 
  77   Sat Mar 23 13:34:14 2013 KojiOpticsGeneralPZT assembly prototype glued 
Prototype
PZT assembly
 P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg 
  76   Sat Mar 23 02:41:00 2013 KojiOpticsGeneralBlack glass beam dumps for the first OMCReceived black glass beam dumps from
MIT
- gluing by EP30-2 looks pretty fine.
 P3223314.JPGP3223319.jpgP3223320.jpg 
  75   Sat Mar 23 02:32:23 2013 KojiFacilityGeneralN2 cylinder deliveredPreparation for ionized N2 blow
- 99.9998% N2 cylinder delivered
(ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ
 P3233349.jpg 
  74   Wed Mar 20 09:38:02 2013 ZachOpticsCharacterization[LLO] OMC test bench modified For various reasons, I had to switch
NPROs (from the LightWave 126 to the Innolight
Prometheus).
 new_setup_traced.jpg 
  73   Sun Mar 17 21:59:47 2013 KojiElectronicsCharacterizationDiode testing ~ DCPD- For the dark noise measurement, the lid
of the die-cast case should also contact
to the box for better shielding. This made
 OMCPD_TEST_130317.pdf 
  72   Fri Mar 15 02:15:45 2013 KojiElectronicsCharacterizationDiode testingDiode testing
o Purpose of the measurement
- Test Si QPDs (C30845EH) for ISC
 QPD_GR_TEST_130316.pdf 
  71   Thu Mar 14 22:18:23 2013 KojiGeneralGeneralNew loans for the diode testALL
returned

Loan
from ATF:
  
  70   Thu Mar 14 17:06:21 2013 KojiMechanicsGeneralOMC SUS work @LLOEDIT (ZK): All photos on
Picasa. Also, I discovered that
 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg 
  69   Thu Mar 7 15:53:47 2013 KojiMechanicsGeneralOMC Transportation fixture, OMC PD/QPD mounts   P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG 
  68   Wed Mar 6 23:24:58 2013 ZachOpticsCharacterizationeLIGO OMC visibility vs. power measurement detailsI found that, in fact, I had lowered
the modulation depth since when I measured
it to be 0.45 rads --> Psb = 0.1.
 TEK00005.PNGTEK00007.PNGeOMC_visibility_3_4_13.pngeOMC_AMTF_vs_power_3_6_13.png 
  67   Tue Mar 5 19:37:00 2013 ZachOpticsCharacterizationeLIGO OMC visibility vs. power measurement detailsEDIT (ZK): Koji points out that (1 -
Ti) should really be the non-resonant reflectivity
of the aligned cavity, which is much closer
 eOMC_visibility_3_4_13.png 
  66   Fri Mar 1 23:52:18 2013 KojiOpticsCharacterizationWedge measurement with the autocollimator and the rotation stageMeasurement:

    E1:   α = 
0.672 deg, β = +0.0  arcmin (0 div up)
  
  65   Fri Mar 1 23:06:15 2013 KojiOpticsConfigurationMore perpendicularity test finalPerpendicularity of the "E" mirror
was measured.

Mounting Prisms:
  
  64   Wed Feb 27 18:18:48 2013 KojiOpticsConfigurationMore perpendicularity testMounting Prisms:
(criteria: 30arcsec = 145urad =>
0.36mm spot shift)
  
  63   Thu Feb 21 18:44:18 2013 KojiOpticsConfigurationPerpendicularity testPerpendicularity test of the mounting
prisms:
The perpendicularity of the prism
 perpendicularity_test.pdfP2203206.JPG 
  62   Thu Feb 7 23:01:45 2013 KojiOpticsCharacterizationUV epoxy gluing test [Jeff, Yuta, Koji]
Gluing test with UV-cure epoxy
Optocast 3553-LV-UTF-HM
  
  61   Thu Feb 7 21:35:46 2013 KojiGeneralGeneralDmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40mDmass
borrowed the LB1005 servo amp from the OMC
lab.
 P2053119.jpgP2053120.JPG 