40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 7 of 7  Not logged in ELOG logo
Entry  Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs Q3000_dark_current.pdf
Dark current measurement for InGaAs QPDs (OSI FCI-InGaAs-Q3000) has been done using Keithley 2450 and Frank's diode test kit. Frank's setup uses
various custom instruments which are no longer exist, therefore the kit was used only for switching between the segments.

The diodes were serialized as 81, 82, 83, 84, continuing the numbering for the OMC QPDs. The numbers are engraved at the side and the back of
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
To know any anomaly to the junction capacitance of the QPD segments, the RF impedances were tested with a hand-made impedance measurement.
All segments look almost identical in terms of capacitance.

Measurement setup:
       Reply  Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs Q3000_dark_noise_81.pdfQ3000_dark_noise_82.pdfQ3000_dark_noise_83.pdfQ3000_dark_noise_84.pdf
The dark noise levels of the four Q3000 QPDs were measured with FEMTO DLPCA200 low noise transimpedance amp.

The measurement has been done in the audio frequency band. The amp gain was 10^7 V/A. The reverse bias was set to be 5V and the DC output of
the amplifier was ~40mV which corresponds to the dark current of 4nA. It is consistent with the dark current measurement.
          Reply  Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs 
I see that these measurements are done out to 100 kHz - I guess there is no reason to suspect anything at 55 MHz which is where this QPD will be reading
out photocurrent given the low frequency behavior looks fine? The broad feature at ~80 kHz is the usual SR785 feature I guess, IIRC it's got to do
with the display scanning rate.
             Reply  Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs 
The amplifier BW was 400kHz at the gain of 1e7 V/A. And the max BW is 500kHz even at a lower gain. I have to setup something special to see the RF band
dark noise.
With this situation, I stated "the RF dark noise should be characterized by the actual WFS head circuit." in the 40m ELOG.
Entry  Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_8117.JPG
OMC Unit 4 Build Machined Parts are currently located in Stephen's office. See image of large blue box from office, below.

Loaned item D1100855-V1-00-OMC08Q004
to Don Griffith for work in semi-clean HDS assy.
    Reply  Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts IMG_9238.JPGIMG_9236.JPG
More explicit insights into the inventory for the Unit 4 build. Image of inventory included below.

Machined Parts:


New fabrication = Contents of Storage-11112 are consistent with
Entry  Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab) PXL_20220624_035628602.jpg
I've cleared the small optical table and wondered how to move it out of the room. Fortunately, the north side of the big table had wide enough clearance
and let the 36" wide table go through. This was easy without moving other heavy stuff.

From here to the door, a bit of work is required. A possibility is to roll the laser blocking wall to the south side of the big table. This will
Entry  Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out IMG-5203.jpg
The table width was an inch too large compared to the door width. We need to tilt the table and it seemed too much for us. Let's ask the transportation
for handling.

Photo courtesy by Juan
Entry  Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery IMG_1102.JPG
The Windows laptop for WincamD/Beam'R2 (DELL Vostro3300) was not functional. 
- Windows 7 got stuck in the starting up process (Google "startup repair loop")
- The battery can't charge and the adapter connection is flaky
Entry  Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs P_20210520_154841.jpg
Item loan: SRS LCR meter SRS720 borrowed from Downs. The unit is at the 40m right now for testing with an excelitas PD. Once it is done, the setup will
be moved to the OMC lab for testing the high QE PDs
    Reply  Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg
Attachment 1: System diagram. The reverse bias voltage is controlled by DS335. This can produce a voltage offset up to 10V. A G=+2 opamp
circuit was inserted so that a bias of up to +15V can be produced. The capacitances of the photodiodes were measured with SR720 LCR meter with a probe.
DS335 and SR720 were controlled from PC/Mac via serial connections.
       Reply  Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement highQEPD_capacitance.pdfC30665_capacitance.pdf
Measurement result:

The capacitance at no bias was 460~500pF. This goes down to below 300pF at 1.0~1.5V reverse bias. At maximum +15V, the capacitance goes down
to 200~220pF.
    Reply  Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs PXL_20220723_002330805.jpg
SRS LCR meter SRS720 was returned to Downs as before.

 
Entry  Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced 

New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter, Style - Air Filters Box, Performance Rating MERV 14, Nominal Filter Size 12x24x2

 

Previous
Entry  Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test PXL_20220716_035922673.jpgPXL_20220716_025319391.MP.jpgPXL_20220716_025334324.jpgPXL_20220716_035309066.jpgPXL_20220716_035411435.NIGHT.jpg
- The lab is chilly (18degC)

- Cleaned the lab and the optical table a bit so that the delicate work can be done. The diode test rig (borrowed from Downs - see OMC
ELOG 408 and OMC ELOG 409) was removed from the table and brought to the office (to return
    Reply  Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2 IMG_1106.JPGIMG_1107.JPGIMG_1110.JPG
More epoxy delamination check:

DCPD R (Attachment 1): Found half delaminated

DCPD T (Attachment 2): Found half delaminated
Entry  Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal 
== Initial Preparation ==


[Done] OMC #002 placement 
[Done] OMC #002 locking
Details OMC
ELOG 414


== Measurements ==
    Reply  Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning 
o Power Budget (2022/07/18)
NPRO ADJ -50 (min)
Fiber incident 62.8mW
       Reply  Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning 
o Power Budget after FirstContact cleaning (2022/07/20)
NPRO ADJ -50 (min)
Fiber incident --.-mW
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
Bond reinforcement blocks for the invar brackets:


Attachment 1: CLASS A glass prisms (the surplus of the 2016 repair)
Attachment 2: Dirty
reiforcement bars made of Aluminum
There are also many dirty prisms in the kit obtained from Stephen
    Reply  Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement IMG_1098.JPG
The backscatter beam is supposed to appear in the backpropagation path. The transmission of the OMC has a couple of optics, it's not easy to access
that beam.
To try to deflect the beam either horizontally or vertically, small optical pieces were made. (Attachment)
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
The profile of the beam incident on the fiber input

The fiber input was deflected by a 45deg mirror. The beam profile was measured with WincamD. The beam was too strong (~60mW) even at the smallest
pump power (ADJ -50) of the NPRO. So the two ND20 filters were added to the lens right before the 45 deg mirror and the camera.
    Reply  Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement OMC_backscatter.pdf
Measure the power ratio between the forward-propagating and reverse-propagating beams.


Place a small deflecting mirror at the transmission.
Place a flat mirror at the deflected transmission. When the alignment
of this mirror is adjusted to retroreflect this beam, the DC of the cavity reflection PD increases, and also the CCD shows spurious fringes.
This
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
OMC Reinforcement blocks

1. P/N D1600316; Version v4; Type 01; Qty 30; Source Chemistry Machine Shop
2. P/N D1600316; Version v4; Type 02; Qty 15; Source Chemistry Machine Shop
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
- Installed the High QE PDs to OMC #002


B1-22@Cage B1 was installed to the transmission DCPD
B1-23@Cage B1 was installed to the reflection
DCPD


Upon the installation, the legs of the PDs were cut by 3mm. Also, the tab of the PD could not be embedded in the DCPD housing.
       Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
- DLPCA-200 trans-impedance amplifier was calibrated.
  Keithley source meter 2450 was connected to the amp. Provide current and read the output voltage with the precision digital voltage meter
(Agilent/Keysight).
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
Regarding: D1200971

- 4 CLASS A wire clamp obtained from the OMC spare
- 4 more DIRTY wire clamp obtained from WB experiments (they no longer use these)
    Reply  Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint IMG_1125.JPG
The optical surfaces were coated with FirstContact to keep them clean / somewhat protected during the transportation.
The PD aperture was sealed with FirstContact "caps" (made by Kate in 2016?).
    Reply  Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1) IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG
Parts check

- D1300052-V3 SN001 is going to be used (Attachment 1)

- This is the PEEK version of the cable bracket (Attachment 2). The side thread holes have no Helicoils inserted. This
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
Connector unmounting

- (Attachment 1) The connector nut rings were removed using an angled needle nose plier. The connector shell has a tight dimension
relative to the hole on the bracket. But of course, they could be extracted.
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
Checking the spare parts 

- Conclusion for OMC#2: need PEEK cable ties
- for more OMCs: need more BHCS / PEEK cable ties / Helicoils
    Reply  Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4) PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg
[Stephen Koji]

Now we got the C&Bed parts to continue to work on the cable bracket replacement.

1) Helicoil insertion
       Reply  Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5) 
- The hole size extension is going forwared now.

- Madeline and Chub are cleaning (sonicating) a drill (29/64=0.4531")
    Reply  Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG
The cable bracket was successfully replaced.


Looking from the QPD side (North side in Attachment 1), the connectors for the DCPDs and PZT are sticking out, and the
ones for QPDs are sticking to the other side. So only two rectangular holes (for QPDs) are facing north.


Top left is DCPDT
Top
    Reply  Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed IMG_1929.JPGIMG_1930.JPG
[Stephen Koji]

New cable ties were installed on the cable pegs attached to the long sides of the cable bracket.

 
    Reply  Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) IMG_1926.JPGPXL_20220816_011346581.jpg
[Stephen Koji]

Checked the delamination status:


The Invar bar on the cable bracket (DCPD side): Almost all delaminated (Attachment 1 left)
The invar bar on the cable bracket
       Reply  Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
EP30-2 preparation


Two Al foil cups + A sheet of Al foil (for test cure)
Set a tube on the glue gun
Attach an applicator tube
Push
a couple of times, and dispense the glue for a single stroke on a waste Al cup
Pour the 6g of glue to the other cup.
Add 0.3g of
          Reply  Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
Inspection of the bonding on the suspension interface side. All look good.
    Reply  Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1) IMG_1168.JPGIMG_1169.JPGIMG_1170.JPGIMG_1171.JPGIMG_1175.JPG
Inspection of the delaminations in the optics side
       Reply  Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
Bonding
          Reply  Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
Inspection

 
    Reply  Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG
EP30-2 bonding setup
    Reply  Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg
[Stephen Koji]

The OMC #002 is ready for shipment.

Attachment 1: Work done on Sept 19, 2022
    Reply  Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG
Inspected the past LLO add-on mass configuration.

There are unknown masses at the DCPD side. It looks like a small SS mass with an estimated mass of 5g. But the DCC number is unknown.

We are going to add 10g on each corner as well as the damping aterial. We should be able to figure out the fastener / mass configuration.
       Reply  Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation balance_mass_config_LLO.pdf
Here is the balance mass info for the LLO OMC#001 analyzed from the photographs


Added masses are: 50+10g, 50+20, 10+20+5, and 20+20+10 for the mass right above FM1/CM1/FM2 and CM2, respectively.
The length
of the 1/4-20 screws seem L=3/4"~1"


If we attach the additional mass, longer 1/4-20 screws (1", 1" 1/8, 1" 1/4)
    Reply  Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg
Shipping preparation for the LLO trip

Started July 15, 2022 and finished Aug 30. So it took ~1.5 months (with a
couple weeks of break)


Class B special tools
Entry  Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement 
Upon the LLO work, the current PD arrangement in the cages are:
CAGE B
B1 OMC1 PDT (A1-23)
ELOG V3.1.3-