40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
OMC elog, Page 7 of 9 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Mon Jun 3 18:58:08 2013, Koji, Optics, Configuration, OMC final tests
|
Tue Jun 18 10:01:11 2013, Koji, Optics, Characterization, Cavity Finesse analysis
|
Fri Aug 16 15:31:17 2013, Koji, Optics, Configuration, Mirror list for OMC(002)
|
Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List
|
Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment
|
Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing
|
Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment 
|
Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment 
|
Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing
|
Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions   
|
Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing
|
Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget
|
Tue Oct 15 18:50:08 2013, Koji, Optics, Characterization, QPD alignment
|
Wed Oct 16 19:16:29 2013, Koji, Optics, Characterization, PD alignment
|
Tue Mar 25 17:10:10 2014, Koji, Optics, Characterization, OMC spot position estimation
|
Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment
|
Mon May 12 22:43:02 2014, Koji, Optics, Characterization, Measured FSR/TSM of the OMC cavity 
|
Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity 
|
Fri May 16 00:13:36 2014, Koji, Optics, Characterization, Cavity mirror gluing part 1
|
Sat May 17 07:40:14 2014, Koji, Optics, Characterization, I1OMC cavity mirrors glued 
|
Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued
|
Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued
|
Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed
|
Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement
|
Sun Jul 6 02:46:20 2014, Koji, Optics, Characterization, OMC power budget
|
Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept  
|
Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept
|
Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD
|
Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD
|
Sun Jul 13 17:46:28 2014, Koji, Optics, Characterization, OMC backscatter measurement
|
Tue Jul 15 03:00:42 2014, Koji, Optics, Characterization, OMC backscatter measurement
|
Tue Jul 15 03:34:16 2014, Koji, Optics, Characterization, OMC backscatter measurement 
|
Wed Aug 27 23:13:13 2014, Koji, Optics, Characterization, Collection of the power budgetting info
|
Tue Sep 8 11:18:10 2015, Koji, Optics, Characterization, PBS Transmission measurement  
|
Wed Sep 9 01:58:34 2015, Koji, Optics, Characterization, PBS Transmission measurement
|
Thu Sep 10 04:03:42 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary)   
|
Wed Sep 23 17:49:50 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary)
|
Tue Dec 15 13:42:37 2015, Koji, Optics, Characterization, Dimensions / packaging of HQE PDs   
|
Sun Mar 6 02:13:28 2016, Koji, Optics, Characterization, PD glass reflections 
|
Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison)
|
Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE 
|
Tue Aug 23 23:36:54 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 7x
|
Thu Aug 25 02:17:09 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC)
|
Fri Sep 9 19:43:32 2016, Koji, Optics, General, D1102211 OMC Diode Mount Glass Block went to Downs
|
Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
|
Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling
|
Tue May 16 19:05:18 2017, Koji, Optics, Configuration, OMC SN002 fix - temporary optics
|
Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing 6x
|
Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps?
|
Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002    
|
|