27
|
Tue Oct 16 14:50:54 2012 |
jamie, jeff | General | General | OMC breadboard/plate measurement dimensions | We have measured the dimensions and mass
of the OMC glass plates/breadboards:
|
|
80
|
Mon Mar 25 18:34:25 2013 |
Koji | General | General | OMC building plan / procedure ~ Mar 25 Mon | 25 March (Mon):
Inspect the test PZT assembly
=> Give it to Bob. |
|
83
|
Wed Mar 27 20:54:45 2013 |
Koji | General | General | OMC building plan / procedure ~ Mar 26 Mon | 26 March (Tue):
- Curved mirror characterization
(Koji, done) |
|
84
|
Wed Mar 27 20:54:54 2013 |
Koji | General | General | OMC building plan / procedure ~ Mar 27 Wed | 27 March (Wed)
- AOM drift investigation (Lisa,
Zach) |
|
85
|
Wed Mar 27 20:55:10 2013 |
Koji | General | General | OMC building plan / procedure ~ Mar 28 Thu | 28 March (Thu):
Rebuild the bottom template
in the lab
Place the bottom |
|
79
|
Mon Mar 25 02:04:05 2013 |
Koji | General | General | OMC building plan / procedure ~ WB18 | WB 18 March
Diode test
Dark current |
|
486
|
Sat Feb 4 03:30:02 2023 |
Koji | Electronics | General | OMC cables #4 arrived | The OMC cables #4 arrived on Feb 3rd. (See
Attachment)
This shipment included two DCPD |
|
493
|
Wed Feb 15 16:00:46 2023 |
Stephen | Electronics | General | OMC cables #4 inspected | Inspection
Updated ICS (Shipment-12578) and
moved those parts to Storage-9482. |
|
135
|
Mon Jun 3 18:58:08 2013 |
Koji | Optics | Configuration | OMC final tests | - QPD mount aligned, QPD output checked
The spots are with 100um from
the center of the diodes. [ELOG |
|
346
|
Thu Apr 18 20:47:54 2019 |
Joe | Optics | | OMC initial alignment and locking | [Joe, Phillip, Koji, Stephen]
*draft post, please add anymore
info if I missed something* |
    |
349
|
Fri Apr 19 11:34:19 2019 |
Koji | Optics | | OMC initial alignment and locking | The spot on CM1 was found displaced by
3.4mm (horiz.) and 3.0mm (vert.)
in the upper right direction looking from |
|
119
|
Fri May 3 21:09:08 2013 |
Koji | General | General | OMC is back | L1 OMC is back on the table for the action
next week. |
|
128
|
Mon May 20 14:59:21 2013 |
Koji | General | General | OMC is out from the oven | The OMC came back to the table again.
No obvious change is visible: no
crack, no delamination |
|
345
|
Wed Apr 17 10:30:37 2019 |
Philip | Optics | General | OMC optical set-up day 1 | [Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
|
|
272
|
Wed Dec 7 21:18:35 2016 |
Koji | General | General | OMC placed on the table / the beam roughly aligned | The OMC mode matching sled was fixed on
the nominal part of the table. Then the OMC
was located at the nominal position marked |
 |
273
|
Thu Dec 8 21:17:09 2016 |
Koji | General | General | OMC placed on the table / the beam roughly aligned | The OMC cavity was locked. The alignment
was precisely adjusted. The mode matching
was optimized by the lens positions. The |
|
197
|
Sun Jul 6 02:46:20 2014 |
Koji | Optics | Characterization | OMC power budget | 3rd OMC power budget (2014/7/2)
Input power: 34.8mW
|
|
354
|
Wed Apr 24 13:58:51 2019 |
Joe | Optics | Characterization | OMC power budget and UV Epoxy Bonding of BS1 | [koji,philip,joe,liyuan,stephen]
need to add spot positions.
Mirrors: PZT11,PZT22, A14, A5 |
|
181
|
Tue Mar 25 17:10:10 2014 |
Koji | Optics | Characterization | OMC spot position estimation | Spot positions were inferred from the photos |
|
501
|
Mon Mar 6 16:02:56 2023 |
Thejas | Optics | General | OMC test setup locking | On Feb 16, Camille and I attampted at locking
the OMC cavity. It was quick to re-align
the beam to the cavity (by using only the |
|
320
|
Thu Mar 28 16:36:52 2019 |
Koji | Mechanics | Characterization | OMC(002) PZT characterization | As
performed in the ELOG 202, the PZTs of
the OMC 002 were tested. |
 |
323
|
Fri Apr 5 01:08:17 2019 |
Koji | Optics | Characterization | OMC(002): DCPD / QPD alignment | The beam height in the cavity became totally
different from the previous one and the shims
needed to be much thicker than before. This |
   |
324
|
Fri Apr 5 20:50:54 2019 |
Koji | Optics | Characterization | OMC(002): QPD alignment | QPD#
QPD1
QPD2 |
 |
322
|
Fri Apr 5 01:07:18 2019 |
Koji | Optics | Characterization | OMC(002): transmitted beam images | There was a concern that the transmission
from CM1 has additional fringes. The shape
of the transmitted beams from CM1, CM2, and |
  |
339
|
Tue Apr 16 16:40:26 2019 |
Koji | General | Configuration | OMC(004): A Mirror selection | We are going to use A5 and A14
for FM1 and FM2. (The role of these
two can be swapped) |
|
340
|
Tue Apr 16 16:52:36 2019 |
Koji | Optics | Configuration | OMC(004): B Mirror selection | We are going to use B6 for the
DCPD BS (BS2), and B1 for the QPD BS (BS3).
Their role can not |
|
341
|
Tue Apr 16 17:24:56 2019 |
Koji | Optics | Configuration | OMC(004): E Mirror selection | We are going to use E6, E9, E11, and E14
for BS1, SM1, SM2, and SM3. They (and E18)
are all very similar. |
|
338
|
Tue Apr 16 16:35:09 2019 |
Koji | Optics | Configuration | OMC(004): Glass breadboard selection | D1200105 SN006 was selected as
the breadboard for OMC(004).
The reason is the best parallelism |
|
330
|
Thu Apr 11 21:22:58 2019 |
Koji | General | General | OMC(004): PZT sub-assembly air baking | [Stephen Koji]
The baking of the PZT subassemblies
was more complicated than we initially thought. |
 |
329
|
Thu Apr 11 21:22:26 2019 |
Koji | Mechanics | General | OMC(004): PZT sub-assembly gluing | [Koji Stephen]
The four PZT sub-assemblies were
glued in the gluing fixtures. There were |
 |
378
|
Mon Sep 23 21:29:51 2019 |
Koji | Optics | General | OMC(004): PZT sub-assembly gluing (#9/#10) | [Stephen, Shruti, Koji]
We worked on the gluing of the
PZT sub-assy (#9 and #10) along with the |
 |
381
|
Mon Sep 30 23:16:53 2019 |
Koji | Optics | General | OMC(004): PZT sub-assembly gluing (#9/#10) | Friday: [Stephen, Koji]
As the oven setting has qualified,
we brought the PZT assys in the air bake |
   |
331
|
Sun Apr 14 23:58:49 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection | [Koji Stephen]
(Friday afternoon) We retrieved
the PZT sub-assemblies to the clean room. |
|
335
|
Mon Apr 15 01:23:45 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10) | Sub-ASSY
#10
Attachment #1: Mounting |
   |
332
|
Mon Apr 15 00:08:32 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) | Sub-ASSY
#7
Probably the best glued unit among |
6x |
333
|
Mon Apr 15 00:39:04 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) | Sub-ASSY
#8
Probably the best glued unit among |
8x |
334
|
Mon Apr 15 01:07:30 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) | Sub-ASSY
#9
The most fractured unit among four. |
7x |
336
|
Mon Apr 15 21:11:49 2019 |
Philip | Optics | Characterization | OMC(004): PZT testing for spare OMC | [Koji, Philip]
Today we tested the functionality
of the four remaining PZTs (11,12,13 and |
|
337
|
Tue Apr 16 11:36:36 2019 |
Koji | Optics | Characterization | OMC(004): PZT testing for spare OMC | Attachment 1: Shadow sensor
setup for the PZT displacement test
Attachment 2: |
9x |
342
|
Tue Apr 16 21:16:11 2019 |
Koji | Optics | Characterization | OMC(004): PZT testing for spare OMC | After having dug into the past email, it
turned out that these wires were the ones
already replaced from the original teflonwires. |
|
360
|
Thu May 9 18:10:24 2019 |
Koji | Optics | Characterization | OMC(004): Spot position scan / power budget | (Now the CCD image is captured as a movie
and the screen capture is easier!)
Various spot positions |
 |
350
|
Sat Apr 20 00:50:12 2019 |
Koji | Optics | Characterization | OMC(004): Spot positions | Similarly to OMC
ELOG 349 the spot positions after the
replacement of CM2 were measured (Attachment |
 |
356
|
Wed May 1 15:40:46 2019 |
Koji | Optics | Characterization | OMC(004): Spot positions and the scattering | Tried a few things.
1. Replaced CM1 (PZT ASSY
#10=M21+PZT#22+C12) with PZT ASSY #7 (=M1+PZT#13+C13) |
|
357
|
Fri May 3 11:06:28 2019 |
Koji | Optics | Characterization | OMC(004): Spot positions and the scattering | Experiment on 5/1
- CM1 right knob was moved 1div (10um)
backward such that the spots were better |
|
352
|
Mon Apr 22 19:54:28 2019 |
Koji | General | | OMC(004): Spot positions at the end of Apr 22nd | |
|
344
|
Wed Apr 17 09:08:47 2019 |
Stephen | General | General | OMC(004): Unwrapping and preparing breadboard | [Stephen, Philip, Koji, Joe]
Breadboard D1200105 SN06 was selected
as described in eLOG |
    |
326
|
Wed Apr 10 19:22:24 2019 |
Koji | General | General | OMC(004): preparation for the PZT subassembly bonding | Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure) |
|
327
|
Thu Apr 11 10:54:38 2019 |
Stephen | General | General | OMC(004): preparation for the PZT subassembly bonding |
Quote:
|
|
167
|
Sat Sep 7 17:20:56 2013 |
Koji | General | General | OMC/PD lab optical table wrapping | [Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table |
|
152
|
Fri Aug 16 16:36:19 2013 |
Koji | Optics | General | Optics List | Link
to the "Mirror/PZT Characterization
links" |
|