Tue Oct 16 14:50:54 2012, jamie, jeff, General, General, OMC breadboard/plate measurement dimensions
| +
Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon
| +
Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon
| +
Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed
| +
Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu
| +
Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18
| +
Sat Feb 4 03:30:02 2023, Koji, Electronics, General, OMC cables #4 arrived
| +
Wed Feb 15 16:00:46 2023, Stephen, Electronics, General, OMC cables #4 inspected
|
Mon Jun 3 18:58:08 2013, Koji, Optics, Configuration, OMC final tests
| +
Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking    
| +
Fri Apr 19 11:34:19 2019, Koji, Optics, , OMC initial alignment and locking
|
Fri May 3 21:09:08 2013, Koji, General, General, OMC is back
|
Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven
|
Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1
| +
Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned 
| +
Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned
|
Sun Jul 6 02:46:20 2014, Koji, Optics, Characterization, OMC power budget
|
Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1
|
Tue Mar 25 17:10:10 2014, Koji, Optics, Characterization, OMC spot position estimation
|
Mon Mar 6 16:02:56 2023, Thejas , Optics, General, OMC test setup locking
|
Thu Mar 28 16:36:52 2019, Koji, Mechanics, Characterization, OMC(002) PZT characterization 
|
Fri Apr 5 01:08:17 2019, Koji, Optics, Characterization, OMC(002): DCPD / QPD alignment   
|
Fri Apr 5 20:50:54 2019, Koji, Optics, Characterization, OMC(002): QPD alignment 
|
Fri Apr 5 01:07:18 2019, Koji, Optics, Characterization, OMC(002): transmitted beam images  
|
Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection
|
Tue Apr 16 16:52:36 2019, Koji, Optics, Configuration, OMC(004): B Mirror selection
|
Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection
|
Tue Apr 16 16:35:09 2019, Koji, Optics, Configuration, OMC(004): Glass breadboard selection
|
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking 
|
Thu Apr 11 21:22:26 2019, Koji, Mechanics, General, OMC(004): PZT sub-assembly gluing 
| +
Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10) 
| +
Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10)   
| +
Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection
| +
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)   
| +
Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
| +
Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
| +
Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
| +
Mon Apr 15 21:11:49 2019, Philip, Optics, Characterization, OMC(004): PZT testing for spare OMC
| +
Tue Apr 16 11:36:36 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC 9x
| +
Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
|
Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget 
|
Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions 
| +
Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
| +
Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
| +
Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd
|
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard    
| +
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
| +
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
| +
Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping
|
Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List
|
|