Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched
|

|
Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List
|
Facility
- Work
- Replacing wooden work benches
- Replacing a cabinet at the south wall by a lockable cabinet
- Cleaning of the floor
Plug a big hole on the wall (Done)
- Plug slits on the roof of the HEPA booth - "There should be the blanking panels there."
- Install laser Safety curtain (Peter is working on this)
- Place a sticky mat
- Prepare clean supplies (Shoes/Coverall/Hats/Gloves) => go to VWR stock room
- Prepare Al foils (All foils inc, should get a certificate everytime to ensure UHV compatibility)
- Plastic boxes for storage http://www.drillspot.com/products/422140/Rubbermaid_2282-00-CLR_18GAL_Clear_Snap_Case
(Steve is helping Koji to get them)
- Design
- Test
- Note: Optical Table W96" x D48" x H27"
Mechanics
- Work
- Design
- How do we hold the PDs, QPDs, and black glass - we put 2 PDs and 2 QPDs on the PD mounting blacket.
-
-
- Test
- Things to be tested
- New suspension scheme (cup & cone design)
- Balancing the plates
- Dummy metal payload?
- => Suspending test with a suspension cage for a Faraday isolator@CIT
- Supporting block for the suspension cage (to mimic the OMC suspension)
- Things to be designed
- Wire end (cone)
- Diode holding structures
PD/QPD/PZT holding structure
- PZT alignment
- Prototyping with metal parts?
- UV glue? (heat) / gluing test
- Balance / ballast
- Solid works
Optics
- Mirrors to be delivered ~Aug
- Design down select
- Between "Single output & BS" vs "Two outputs & no BS"
- Mode design
- Finalization of scattering paths / PD angles etc
- Things to be decided / confirmed:
- How to handle optics / assemblies (Talk to the prev people)
- First contact? (Margot: applicable to a short Rc of ~2.5m)
- Gluing templates to be designed (how to handle it?)
- Things to be tested:
- R&T of each mirror
- Cavity ref/trans/finesse
- PD QE / incident angle
- What PD do we use?
- CCD beam analyzer (Zach: It is fixed.)
- PD angle measurement
- Obtain EG&G 3mm PDs
Electronics
- Electronics / CDS electronics / software
- Things to be tested
- QPD/PD pre-selections (QE/noise)
- Functionality test of QPD/PD/PZT
Shipping, storage etc
Jun/July
- Lab renovtion
- Mechanics design
- Glue training
Aug
- Mirror delivery
- Basic optics test
Sept
- Cavity test
- Suspending test
NOV~DEC
- Shipping to LLO
Open questions
Two optical designs
Procedure
Modeling
Clamp design / stencil design
gluing-installation procedure
|
Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan
|
|
|