OMC elog, Page 6 of 8 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started
|
Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List
| +
Fri Aug 16 15:31:17 2013, Koji, Optics, Configuration, Mirror list for OMC(002)
| +
Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6
|
Sat Jul 6 17:10:07 2013, Koji, Mechanics, Characterization, PZT Response analysis 
|
Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp
|
Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6
|
Tue Jun 18 10:01:11 2013, Koji, Optics, Characterization, Cavity Finesse analysis
|
Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status
|
Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA
|
Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed
|
Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test  
|
Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived
|
Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out 
|
Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT
|
Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram
|
Mon Jun 3 21:19:03 2013, Koji, General, General, Planning
|
Mon Jun 3 18:58:08 2013, Koji, Optics, Configuration, OMC final tests
|
Fri May 31 14:07:54 2013, Koji, Optics, Characterization, Transverse Mode Spacing measurement afte the baking 
| +
Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment  
|
Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting
|
Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount
| +
Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule
|
Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven
|
Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking
|
Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing
|
Mon May 13 14:49:35 2013, Koji, Mechanics, Characterization, Mounting Glass Bracket still broke with tightenin stress
|
Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress
| +
Wed May 8 15:08:57 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts   
|
Fri May 3 21:09:08 2013, Koji, General, General, OMC is back
|
Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing
|
Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure
|
Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued
| +
Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement
|
Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation
|
Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued 
|
Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue)
|
Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress
|
Wed Apr 10 00:40:30 2013, Zach, Optics, Configuration, fauxMC locked
| +
Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures
|
Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned 
|
Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement
|
Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO
|
Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links
| +
Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken
| +
Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure 
|
Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity
|
Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built
|
Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test
|
Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
|
|