  211   Sun Jul 20 17:19:50 2014 KojiMechanicsCharacterizationI1OMC vibration test ~ 2nd roundImproved
vibration measurement of the OMC
Improvement
 9x 
  210   Thu Jul 17 02:19:20 2014 KojiMechanicsCharacterizationI1OMC vibration testSummary
- The breadboard has a resonance
at 1.2kHz. The resonant freq may be chagned
 6x 
  209   Tue Jul 15 03:34:16 2014 KojiOpticsCharacterizationOMC backscatter measurementBackscatter
measurement ~ 2nd round


Summary
 OMC_backscatter.pdfOMC_backscatter.png 
  208   Tue Jul 15 03:00:42 2014 KojiOpticsCharacterizationOMC backscatter measurementPresence of the misaligned SRM (T=20%)
was forgotten in the previous entry.
This effectively reduces the OMC reflectivity
  
  207   Sun Jul 13 17:46:28 2014 KojiOpticsCharacterizationOMC backscatter measurementBackscattering
reflectivity of the 3rdOMC was measured.

Attached: Measurement setup
 OMC_backscatter.pdf 
  206   Fri Jul 11 00:06:33 2014 KojiOpticsCharacterizationI1OMC PDDCPD#            
DCPD1      DCPD2
Housing#         
  
  205   Thu Jul 10 23:22:28 2014 KojiOpticsCharacterizationI1OMC QPDQPD#             
QPD1      
QPD2
  
  204   Thu Jul 10 08:34:57 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  203   Thu Jul 10 01:39:38 2014 KojiElectronicsGeneralPZT wireRich came to the OMC lab. Pins for the
mighty mouse connector were crimped on the
4 PZT wires.
 P7096669.JPG 
  202   Tue Jul 8 18:54:54 2014 KojiMechanicsCharacterizationPZT characterizationEach PZT was swept with 0-150V 11Hz triangular
wave.
Time series data for 0.2sec was recorded
 PZT_Scan.pdfI1OMC_PZT_Response.pdf 
  201   Tue Jul 8 04:08:06 2014 KojiGeneralGeneralExpoxy reapplication for beam dumpsFirstly, the excess epoxy was removed using
a cleaned razor balde
  
  200   Mon Jul 7 01:36:03 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  199   Sun Jul 6 08:31:14 2014 KojiOpticsCharacterizationHOM measurement with PZT vol swept3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier
is the 32nd-order carrier mode. Very good.
 HOM_plot.pdf 
  198   Sun Jul 6 03:56:40 2014 KojiOpticsCharacterizationHOM measurement with PZT vol sweptCavity FSR/TMS measurement (2014/7/5) with
PZT voltages swept from 0V to 200V (50V step)
 Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf 
  197   Sun Jul 6 02:46:20 2014 KojiOpticsCharacterizationOMC power budget3rd OMC power budget (2014/7/2)
Input power: 34.8mW
  
  196   Sun Jul 6 02:45:56 2014 KojiOpticsGeneralFSR Measurement3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a
HWP.
 finesse_measurements_log.pdf 
  195   Thu Jul 3 17:45:18 2014 KojiGeneralGeneralBeam dump delaminationHere is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure).
 beamdump_delamination_solution.png 
  194   Wed Jul 2 18:58:42 2014 KojiGeneralGeneralBeam dump delaminationWhile the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination.
 beamdump_delamination.png 
  193   Wed Jul 2 16:41:43 2014 KojiGeneralGeneralOMC bakingOMC is back from the oven today.
To Do:
Optical tests
  
  192   Fri Jun 27 18:51:33 2014 KojiGeneralGeneralSupplyPTOUCH TAPE (12mm white) x 2
9V batteries
  
  191   Fri Jun 27 12:29:50 2014 KojiGeneralGeneralOMC bakingThe OMC went into the oven at around 2PM
on Thursday. It will be baked at 80degC for
48 hours.
 P6266536.jpg 
  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assemblyFor baking:

    Assembly Name aLIGO Output
Mode Cleaner
  
  189   Mon Jun 23 21:54:16 2014 KojiOpticsGeneralAll of the gluing completedThe bottom-side templates were removed.
The last beam dump was removed
TODO
  
  188   Fri Jun 20 18:59:12 2014 KojiOpticsGeneralAll of the invar blocks have been gluedAll of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
  
  187   Thu Jun 19 23:16:50 2014 KojiOpticsGeneralAll of the prisms have been glued- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been
glued
 P6196525.JPG 
  186   Sat May 17 07:40:14 2014 KojiOpticsCharacterizationI1OMC cavity mirrors gluedI1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m
(nominal 1.132m)
 Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf 
  185   Fri May 16 00:13:36 2014 KojiOpticsCharacterizationCavity mirror gluing part 1BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted
  
  184   Wed May 14 02:15:15 2014 KojiOpticsCharacterizationFSR/TSM adjustment of the OMC cavity 1. FSR was adjusted and measured with "the
golden arches" technique again.
FSR = 264.8412 MHz +/- 1400Hz =>
 Cav_scan_response_140503_Pitch.pdfCav_scan_response_140503_Yaw.pdf 
  183   Mon May 12 22:43:02 2014 KojiOpticsCharacterizationMeasured FSR/TSM of the OMC cavityData analysis of the FSR/TSM measruement
last week.
1. FSR was measured with "the
 Cav_scan_response_Pitch.pdfCav_scan_response_Yaw.pdf 
  182   Thu Apr 17 21:39:25 2014 KojiOpticsGeneralMore alignmentSTORY:
- The cavity mirrors have scattering
spots. The cavity alignment should have been
  
  181   Tue Mar 25 17:10:10 2014 KojiOpticsCharacterizationOMC spot position estimationSpot positions were inferred from the photos  OMC_spot.pdf 
  180   Mon Mar 3 02:46:21 2014 KojiGeneralCharacterizationSpot positions scannedSpot positions on CM1 and CM2 scanned according
to the recipes provided by the previous entry.
The best result obtained was:
  
  179   Fri Feb 28 19:50:11 2014 KojiGeneralGeneralMisalignment ABCD matrix for the aLIGO OMCRelationship between mirror misalignment
and cavity mode shift was calculated.
The technique described in T0900647
 misalignment.pdf 
  178   Tue Feb 18 18:58:38 2014 KojiGeneralGeneralLHO H1 OMC installation photosLHO OMC installation photos
  
  177   Tue Dec 10 16:41:51 2013 KojiGeneralGeneralTo BuyMasks / Wipes => done   
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignmentDCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again.
  
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  172   Wed Oct 16 19:16:29 2013 KojiOpticsCharacterizationPD alignment 
 shim 1.5mm 001/002
  
  171   Tue Oct 15 18:50:08 2013 KojiOpticsCharacterizationQPD alignment1) Deburr the bottom surfaces of the QPD
housings
2) Aligned the QPDs
  
  170   Mon Oct 14 15:50:55 2013 KojiOpticsCharacterizationH1 OMC Power budgetLHO OMC power budget

    
 OMC_power_budget.pdf 
  169   Mon Oct 14 13:40:16 2013 KojiOpticsCharacterizationH1 OMC Optical testingSince the middle of September, the optical
tests of H1 OMC were took place.
Here is summary of the progress.
  
  168   Fri Sep 13 15:09:20 2013 KojiGeneralGeneralSprinkler installation: doneA sprinkler head was installed on the HEPA
enclosure. The head is covered with a plastic
cap.
 P9134379.jpgP9134378.jpg 
  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping[Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table
 P9064377.JPG 
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluingThe Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 ->
 P8304368.JPGP8304370.JPG 
  163   Fri Aug 30 12:24:28 2013 KojiOpticsCharacterizationH1OMC Spot positionsBeam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm
 DCPD1.pngDCPD2.pngQPD1.pngQPD2.png 
  162   Fri Aug 30 12:22:56 2013 KojiOpticsGeneralH1 OMC Cavity side UV gluingH1 OMC Cavity side optics was glued
on the breadboard
  