265
|
Mon Aug 22 12:58:16 2016 |
Koji | General | General | UV bond samples -> Garilynn | - FS base + Mounting Prism
- FS or SF2 1/2" piece + FS
or SF2 1/2" piece |
|
268
|
Fri Sep 9 14:34:31 2016 |
Koji | General | General | Item lending | To 40m
First Contact Kit by Calum
Class A Kapton sheets |
|
272
|
Wed Dec 7 21:18:35 2016 |
Koji | General | General | OMC placed on the table / the beam roughly aligned | The OMC mode matching sled was fixed on
the nominal part of the table. Then the OMC
was located at the nominal position marked |
 |
273
|
Thu Dec 8 21:17:09 2016 |
Koji | General | General | OMC placed on the table / the beam roughly aligned | The OMC cavity was locked. The alignment
was precisely adjusted. The mode matching
was optimized by the lens positions. The |
|
278
|
Fri May 26 21:53:20 2017 |
Koji | General | Configuration | Trans RF PD setup | Recent work
- DC output of the trans RF PD
was connected to the BNC patch panel. => |
|
279
|
Tue Jun 6 00:49:48 2017 |
Koji | General | Configuration | Trans RF PD setup | Last week, I further worked on the RF system
to install 20dB coupler on the agilent unit
and setup the R channel. This allowed me |
|
280
|
Tue Jun 6 22:00:36 2017 |
Koji | General | Configuration | Trans RF PD setup | - Replaced the PZT with the one used from
the beginning. This must be PZT #21. After
the replacement, the spot positions look |
|
284
|
Sat Jul 1 21:33:18 2017 |
Koji | General | General | Some purchase notes | - Forgot to close the cylinder valve...
v HEPA prefilter (20"x20"x1"
MERV 7) |
|
285
|
Wed Jul 5 16:59:44 2017 |
Koji | General | General | The OMC #002 was packed | [Stephen Koji]
The OMC #002 was packed for the
transportation to Downs. |
|
289
|
Mon Nov 27 20:24:24 2017 |
Koji | General | General | A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm | Attachment 1: The PD was
removed from the transmission side of the
OMC #002 (former LHO OMC - the one blasted |
6x |
290
|
Thu Nov 30 12:18:41 2017 |
Stephen | General | General | Preparation for Modal Testing on 4 December | Norna Robertson, Stephen Appert ||
29 Nov 2017, 2 pm to 4 pm ||
227 Downs, CIT |
|
293
|
Thu May 3 21:45:58 2018 |
awade | General | Loan / Lending | Borrowed toaster oven | I’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. |
|
305
|
Wed Aug 8 17:32:56 2018 |
Rich Abbott | General | Characterization | Modulation Index Test Setup at 40m Lab | Attached is a block diagram of the test
setup used in the 40m lab to measure the
modulation index of the IO modulator |
|
306
|
Thu Aug 9 11:24:29 2018 |
Koji | General | Characterization | Modulation Index Test Setup at 40m Lab | [Rich Koji]
The impedances of the new LLO EOM
were measured with the beat note setup at |
 |
307
|
Wed Aug 29 11:06:30 2018 |
Koji | General | General | RF AM RIN and dBc conversion | 0. If you have an RF signal whose waveform
is , the amplitude is constant and 1. |
|
319
|
Tue Mar 19 17:30:25 2019 |
Koji | General | Characterization | OMC (002) Test items | OMC #002 Optical tests
FSR
measurement (done, 2019/1/8-9, 2019/4/1)
|
|
325
|
Fri Apr 5 23:30:20 2019 |
Koji | General | General | OMC (002) repair completed | OMC(002)
repair completed
When the cable harness of OMC(004) |
  |
326
|
Wed Apr 10 19:22:24 2019 |
Koji | General | General | OMC(004): preparation for the PZT subassembly bonding | Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure) |
|
327
|
Thu Apr 11 10:54:38 2019 |
Stephen | General | General | OMC(004): preparation for the PZT subassembly bonding |
Quote:
|
|
330
|
Thu Apr 11 21:22:58 2019 |
Koji | General | General | OMC(004): PZT sub-assembly air baking | [Stephen Koji]
The baking of the PZT subassemblies
was more complicated than we initially thought. |
 |
331
|
Sun Apr 14 23:58:49 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection | [Koji Stephen]
(Friday afternoon) We retrieved
the PZT sub-assemblies to the clean room. |
|
332
|
Mon Apr 15 00:08:32 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) | Sub-ASSY
#7
Probably the best glued unit among |
6x |
333
|
Mon Apr 15 00:39:04 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) | Sub-ASSY
#8
Probably the best glued unit among |
8x |
334
|
Mon Apr 15 01:07:30 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) | Sub-ASSY
#9
The most fractured unit among four. |
7x |
335
|
Mon Apr 15 01:23:45 2019 |
Koji | General | General | OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10) | Sub-ASSY
#10
Attachment #1: Mounting |
   |
339
|
Tue Apr 16 16:40:26 2019 |
Koji | General | Configuration | OMC(004): A Mirror selection | We are going to use A5 and A14
for FM1 and FM2. (The role of these
two can be swapped) |
|
343
|
Tue Apr 16 23:11:43 2019 |
Koji | General | General | Borrowed items from the other labs | Apr 16, 2019
Borrowed
two laser goggles from the 40m. (Returned |
|
344
|
Wed Apr 17 09:08:47 2019 |
Stephen | General | General | OMC(004): Unwrapping and preparing breadboard | [Stephen, Philip, Koji, Joe]
Breadboard D1200105 SN06 was selected
as described in eLOG |
    |
348
|
Fri Apr 19 09:35:28 2019 |
Joe | General | | Adjusting cavity axis, re-alignment of OMC and locking | [koji,philip,
joe, liyuan,
steven] |
 |
351
|
Mon Apr 22 09:54:21 2019 |
Joe | General | | Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR | [Koji,Joe,Philip,stephen]
in units 20um per div on the micrometer
[n.b. we reailised that its 10um per div |
 |
352
|
Mon Apr 22 19:54:28 2019 |
Koji | General | | OMC(004): Spot positions at the end of Apr 22nd | |
|
362
|
Thu May 16 12:41:28 2019 |
Chub | General | General | fire pillow found on optics table | That is an expanding fire pillow, also
known as firebrick. It is used to create
a fire block where holes in fire-rated walls |
|
377
|
Wed Sep 18 23:38:52 2019 |
Stephen | General | General | Dirty ABO ready for PZT Subassembly Bonding | The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab, |
|
379
|
Tue Sep 24 12:19:20 2019 |
Stephen | General | General | Dirty ABO test run prior to PZT Subassembly Bonding | The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab |
|
380
|
Thu Sep 26 17:33:52 2019 |
Stephen | General | General | Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready! | Follow up on OMC
elog 379
I was able to obtain the following |
|
382
|
Tue Oct 22 10:25:01 2019 |
Stephen | General | General | OMC PZT Assy #9 and #10 Production Cure Bake | OMC PZT Assy Production Cure Bake (ref.
OMC
elog 381) for PZT Assy #9 and #10 started |
 |
383
|
Tue Oct 22 11:52:53 2019 |
Stephen | General | General | Epoxy Curing Timeline of OMC PZT Assy #9 and #10 | This post captures the curing timeline
followed by OMC PZT Assys #9 and #10.
Source file posted in case any |
 |
387
|
Fri Dec 13 14:59:18 2019 |
Stephen | General | General | OMC Beam Dump Production Cure Bake | [Koji, Jordan, Stephen]
The beam dumps, bonded on Fri 06
Dec 2019, were placed in the newly tuned |
 |
388
|
Wed Dec 18 21:54:53 2019 |
Koji | General | General | OMC Beam Dump Production Cure Bake | The beamdumps were taken out from the oven
and packed in bags.
The bottom of the V are completely |
  |
389
|
Thu Feb 27 14:31:13 2020 |
Koji | General | General | Item lending | Item lending as per Ian's request:
Particle Counter from OMC Lab to QIL
|
|
390
|
Mon Aug 10 15:29:54 2020 |
Koji | General | General | Item lending | The particle counter came back to the OMC
lab on Aug 10, 2020
|
|
392
|
Mon Aug 10 15:53:46 2020 |
Koji | General | General | Lab status check | Check-in to the OMC lab to see the status.
Nothing seemed changed. No bug. The HEPA
is running normal. The particle level was |
|
393
|
Mon Sep 28 16:03:13 2020 |
rana | General | General | OMC Beam Dump Production Cure Bake |
are there any measurements of the BRDF
of these things? I'm curious how much
light is backscattered into the incoming |
|
394
|
Mon Sep 28 16:13:08 2020 |
Koji | General | General | OMC Beam Dump Production Cure Bake | According to the past backscatter test
of the OMC (and the black glass beamdump:
not V type but triangular type on a hexagonal-mount), |
|
395
|
Thu Oct 8 19:55:22 2020 |
Koji | General | Characterization | Power Measurement of Mephisto 800NE 1166A | The output of Mephisto 800NE (former TNI
laser) was measured.
The output power was measured with |
|
396
|
Fri Oct 9 01:01:01 2020 |
Koji | General | General | TFT Monitor mounting | To spare some room on the optical table,
I wanted to mount the two TFT monitor units
on the HEPA enclosure frame. |
    |
397
|
Fri Oct 16 00:53:29 2020 |
Koji | General | General | TFT Monitor mounting | The image flipping of the display unit
was fixed. The vendor told me how to fix
it. |
|
398
|
Fri Oct 23 19:09:54 2020 |
Koji | General | General | Particle counter transfered to Radhika | See this entry: https://nodus.ligo.caltech.edu:8081/40m/15642 |
|
399
|
Fri Nov 6 18:38:00 2020 |
Koji | General | General | Powermeter lent from OMC Lab to 2um ECDL | Thorlabs' powermeter controler +
S401C head was lent from OMC Lab. Returned
to OMC Jul 15, 2022 KA |
|
401
|
Fri Nov 20 18:51:23 2020 |
Koji | General | General | Instrument loan | FEMTO DLPCA200 low noise preamp (brand
new)
Keithley Source Meter 2450 (brand |
|