Mon Aug 22 12:58:16 2016, Koji, General, General, UV bond samples -> Garilynn
| +
Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending
| +
Wed Dec 7 21:18:35 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned 
| +
Thu Dec 8 21:17:09 2016, Koji, General, General, OMC placed on the table / the beam roughly aligned
| +
Fri May 26 21:53:20 2017, Koji, General, Configuration, Trans RF PD setup
| +
Tue Jun 6 00:49:48 2017, Koji, General, Configuration, Trans RF PD setup
| +
Tue Jun 6 22:00:36 2017, Koji, General, Configuration, Trans RF PD setup
|
Sat Jul 1 21:33:18 2017, Koji, General, General, Some purchase notes
|
Wed Jul 5 16:59:44 2017, Koji, General, General, The OMC #002 was packed
|
Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm 6x
|
Thu Nov 30 12:18:41 2017, Stephen, General, General, Preparation for Modal Testing on 4 December
|
Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven
| +
Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab
| +
Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab 
|
Wed Aug 29 11:06:30 2018, Koji, General, General, RF AM RIN and dBc conversion
|
Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items
|
Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed  
| +
Wed Apr 10 19:22:24 2019, Koji, General, General, OMC(004): preparation for the PZT subassembly bonding
| +
Thu Apr 11 10:54:38 2019, Stephen, General, General, OMC(004): preparation for the PZT subassembly bonding
|
Thu Apr 11 21:22:58 2019, Koji, General, General, OMC(004): PZT sub-assembly air baking 
| +
Sun Apr 14 23:58:49 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection
| +
Mon Apr 15 00:08:32 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7) 6x
| +
Mon Apr 15 00:39:04 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8) 8x
| +
Mon Apr 15 01:07:30 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9) 7x
| +
Mon Apr 15 01:23:45 2019, Koji, General, General, OMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10)   
|
Tue Apr 16 16:40:26 2019, Koji, General, Configuration, OMC(004): A Mirror selection
|
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
|
Wed Apr 17 09:08:47 2019, Stephen, General, General, OMC(004): Unwrapping and preparing breadboard    
|
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking 
| +
Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR 
| +
Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd
| +
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
|
Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding
|
Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding
|
Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready!
|
Tue Oct 22 10:25:01 2019, Stephen, General, General, OMC PZT Assy #9 and #10 Production Cure Bake 
|
Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 
| +
Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake 
| +
Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake  
| +
Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending
| +
Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending
|
Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check
| +
Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake
| +
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
|
Thu Oct 8 19:55:22 2020, Koji, General, Characterization, Power Measurement of Mephisto 800NE 1166A
| +
Fri Oct 9 01:01:01 2020, Koji, General, General, TFT Monitor mounting    
| +
Fri Oct 16 00:53:29 2020, Koji, General, General, TFT Monitor mounting
|
Fri Oct 23 19:09:54 2020, Koji, General, General, Particle counter transfered to Radhika
|
Fri Nov 6 18:38:00 2020, Koji, General, General, Powermeter lent from OMC Lab to 2um ECDL
|
Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan
|
|