40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 4 of 13
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
621 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
11
,
12
,
13
Next
Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement
Thu Aug 24 12:30:58 2023, Camille Makarem, Thejas , Optics, Characterization, FSR and TMS analysis
Wed Aug 23 07:48:14 2023, Camille Makarem, Tejas, Optics, Characterization, FSR and TMS measuarement of A+ build
Fri Dec 9 13:13:13 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission
Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial
Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity
Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints
Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned
Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom
Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot
Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test
Mon Apr 3 11:06:47 2023, Thejas , Optics, Characterization, Flat mirror flatness
Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect
Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement
Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement
Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement
Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement
Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate
Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven
Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment
Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing
Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement
Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing
Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing
Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget
Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment
Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed
Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab.
Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment
Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed
Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions
Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling
Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement
Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH
Wed Apr 5 22:09:30 2023, Koji, Facility, General, HEPA Enclosure extension
Mon Mar 6 12:25:08 2023, Koji, Facility, General, HEPA Enclosure improvement
Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept
Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept
Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE
Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison)
Sat Mar 26 17:39:50 2016, Koji, Electronics, Characterization, HQEPD dark noise
Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory
Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements
Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2
Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched
Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate
Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy
Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV)
Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD
Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD
Goto page
Previous
1
,
2
,
3
, 4,
5
...
11
,
12
,
13
Next
ELOG V3.1.3-