  111   Tue Apr 16 00:40:45 2013 KojiOpticsGeneralPD/QPD path gluing ~ preparation[Jeff Koji]
- Placed the optics on the PD/QPD
path
  
  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignmentDCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again.
  
  252   Sun Mar 6 02:13:28 2016 KojiOpticsCharacterizationPD glass reflectionsOn friday, I removed a glass cover of a
G30655 with a PD can cutter.

When a beam shoots a Perkin Elmer/Excelitas
 P3048124.JPGP3048125.JPG 
  449   Tue Sep 20 08:54:33 2022 KojiGeneralGeneralPD cage arrangementUpon the LLO work, the current PD arrangement
in the cages are:
CAGE B
  
  172   Wed Oct 16 19:16:29 2013 KojiOpticsCharacterizationPD alignment 
 shim 1.5mm 001/002
  
  241   Tue Sep 8 11:18:10 2015 KojiOpticsCharacterizationPBS Transmission measurementMotivation: Characterize
the loss of the Calcite Brewster PBS.

Setup: (Attachment
 setup.JPGCaF2Prism.jpgCaF2Prism2.JPG 
  242   Wed Sep 9 01:58:34 2015 KojiOpticsCharacterizationPBS Transmission measurementCalcite Brewster PBS Continued

The
transmission loss of the Calcite brewster
  
  420   Thu Jul 21 14:55:48 2022 KojiGeneralGeneralOptics bonding for the backscatter measurementThe backscatter beam is supposed to appear
in the backpropagation path. The transmission
of the OMC has a couple of optics, it's
 IMG_1098.JPG 
  152   Fri Aug 16 16:36:19 2013 KojiOpticsGeneralOptics ListLink
to the "Mirror/PZT Characterization
links"
  
  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping[Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table
 P9064377.JPG 
  326   Wed Apr 10 19:22:24 2019 KojiGeneralGeneralOMC(004): preparation for the PZT subassembly bonding Preparation for the PZT subassembly
bonding (Section 6.2 and 7.3 of T1500060
(aLIGO OMC optical testing procedure)
  
  327   Thu Apr 11 10:54:38 2019 StephenGeneralGeneralOMC(004): preparation for the PZT subassembly bonding


Quote:


  
  344   Wed Apr 17 09:08:47 2019 StephenGeneralGeneralOMC(004): Unwrapping and preparing breadboard[Stephen, Philip, Koji, Joe]

Breadboard D1200105 SN06 was selected
as described in eLOG
 IMG_7635_packaging_of_sn06.JPGIMG_7637_engraving_of_sn06.JPGIMG_7641_particulate_before_top_gun_large_face.JPGIMG_7644_particulate_before_top_gun_small_face.JPGIMG_7646_particulate_after_top_gun.JPG 
  352   Mon Apr 22 19:54:28 2019 KojiGeneral OMC(004): Spot positions at the end of Apr 22nd   misalignment4.pdf 
  356   Wed May 1 15:40:46 2019 KojiOpticsCharacterizationOMC(004): Spot positions and the scatteringTried a few things.

1. Replaced CM1 (PZT ASSY
#10=M21+PZT#22+C12) with PZT ASSY #7 (=M1+PZT#13+C13)
 misalignment.pdf 
  357   Fri May 3 11:06:28 2019 KojiOpticsCharacterizationOMC(004): Spot positions and the scatteringExperiment on 5/1
- CM1 right knob was moved 1div (10um)
backward such that the spots were better
 misalignment.pdf 
  350   Sat Apr 20 00:50:12 2019 KojiOpticsCharacterizationOMC(004): Spot positionsSimilarly to OMC
ELOG 349 the spot positions after the
replacement of CM2 were measured (Attachment
 misalignment2.pdfmisalignment3.pdf 
  360   Thu May 9 18:10:24 2019 KojiOpticsCharacterizationOMC(004): Spot position scan / power budget(Now the CCD image is captured as a movie
and the screen capture is easier!)

Various spot positions
 190508.pngscattering_spots_CM1.png 
  336   Mon Apr 15 21:11:49 2019 PhilipOpticsCharacterizationOMC(004): PZT testing for spare OMC[Koji, Philip]

Today we tested the functionality
of the four remaining PZTs (11,12,13 and
  
  337   Tue Apr 16 11:36:36 2019 KojiOpticsCharacterizationOMC(004): PZT testing for spare OMCAttachment 1: Shadow sensor
setup for the PZT displacement test

Attachment 2:
 9x 
  342   Tue Apr 16 21:16:11 2019 KojiOpticsCharacterizationOMC(004): PZT testing for spare OMCAfter having dug into the past email, it
turned out that these wires were the ones
already replaced from the original teflonwires.
  
  334   Mon Apr 15 01:07:30 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #9)Sub-ASSY
#9

The most fractured unit among four.
 7x 
  333   Mon Apr 15 00:39:04 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #8)Sub-ASSY
#8

Probably the best glued unit among
 8x 
  332   Mon Apr 15 00:08:32 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #7)Sub-ASSY
#7

Probably the best glued unit among
 6x 
  335   Mon Apr 15 01:23:45 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection (Sub-assy #10) Sub-ASSY
#10

Attachment #1: Mounting
 IMG_7589.jpgIMG_7590.jpgIMG_7591.jpgIMG_7592.jpg 
  331   Sun Apr 14 23:58:49 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly post air-bake inspection[Koji Stephen]

(Friday afternoon) We retrieved
the PZT sub-assemblies to the clean room.
  
  378   Mon Sep 23 21:29:51 2019 KojiOpticsGeneralOMC(004): PZT sub-assembly gluing (#9/#10)[Stephen, Shruti, Koji]

We worked on the gluing of the
PZT sub-assy (#9 and #10) along with the
 IMG_8933.jpgIMG_8934.jpg 
  381   Mon Sep 30 23:16:53 2019 KojiOpticsGeneralOMC(004): PZT sub-assembly gluing (#9/#10)Friday: [Stephen, Koji]

As the oven setting has qualified,
we brought the PZT assys in the air bake
 IMG_8950.jpegIMG_8953.jpegIMG_8954.jpegIMG_8955.jpeg 
  329   Thu Apr 11 21:22:26 2019 KojiMechanicsGeneralOMC(004): PZT sub-assembly gluing[Koji Stephen]

The four PZT sub-assemblies were
glued in the gluing fixtures. There were
 IMG_7561.jpgIMG_7567.jpg 
  330   Thu Apr 11 21:22:58 2019 KojiGeneralGeneralOMC(004): PZT sub-assembly air baking[Stephen Koji]

The baking of the PZT subassemblies
was more complicated than we initially thought.
 temp_profile.pdfbake.xlsx 
  338   Tue Apr 16 16:35:09 2019 KojiOpticsConfigurationOMC(004): Glass breadboard selectionD1200105 SN006 was selected as
the breadboard for OMC(004).
The reason is the best parallelism
 BB_selection.pdf 
  341   Tue Apr 16 17:24:56 2019 KojiOpticsConfigurationOMC(004): E Mirror selectionWe are going to use E6, E9, E11, and E14
for BS1, SM1, SM2, and SM3. They (and E18)
are all very similar.
 E_Mirror_selection.pdf 
  340   Tue Apr 16 16:52:36 2019 KojiOpticsConfigurationOMC(004): B Mirror selectionWe are going to use B6 for the
DCPD BS (BS2), and B1 for the QPD BS (BS3).
Their role can not
 B_Mirror_selection.pdf 
  339   Tue Apr 16 16:40:26 2019 KojiGeneralConfigurationOMC(004): A Mirror selectionWe are going to use A5 and A14
for FM1 and FM2. (The role of these
two can be swapped)
 A_Mirror_selection.pdf 
  322   Fri Apr 5 01:07:18 2019 KojiOpticsCharacterizationOMC(002): transmitted beam imagesThere was a concern that the transmission
from CM1 has additional fringes. The shape
of the transmitted beams from CM1, CM2, and
 CM1trasns.pngCM2trasns.pngFM2trans2.png 
  324   Fri Apr 5 20:50:54 2019 KojiOpticsCharacterizationOMC(002): QPD alignmentQPD#             
QPD1      
QPD2
 P_20190405_215906.jpgP_20190405_215927.jpg 
  323   Fri Apr 5 01:08:17 2019 KojiOpticsCharacterizationOMC(002): DCPD / QPD alignmentThe beam height in the cavity became totally
different from the previous one and the shims
needed to be much thicker than before. This
 IMG_7521.JPGIMG_7529.JPGIMG_7539.JPGIMG_7541.JPG 
  320   Thu Mar 28 16:36:52 2019 KojiMechanicsCharacterizationOMC(002) PZT characterization As
performed in the ELOG 202, the PZTs of
the OMC 002 were tested.
 PZT_Scan.pdfOMC_PZT_Response.pdf 
  181   Tue Mar 25 17:10:10 2014 KojiOpticsCharacterizationOMC spot position estimationSpot positions were inferred from the photos  OMC_spot.pdf 
  354   Wed Apr 24 13:58:51 2019 JoeOpticsCharacterizationOMC power budget and UV Epoxy Bonding of BS1[koji,philip,joe,liyuan,stephen]

need to add spot positions.

Mirrors: PZT11,PZT22, A14, A5
  
  197   Sun Jul 6 02:46:20 2014 KojiOpticsCharacterizationOMC power budget3rd OMC power budget (2014/7/2)
Input power: 34.8mW
  
  272   Wed Dec 7 21:18:35 2016 KojiGeneralGeneralOMC placed on the table / the beam roughly alignedThe OMC mode matching sled was fixed on
the nominal part of the table. Then the OMC
was located at the nominal position marked
 DSC_0082.jpgDSC_0084.jpg 
  273   Thu Dec 8 21:17:09 2016 KojiGeneralGeneralOMC placed on the table / the beam roughly alignedThe OMC cavity was locked. The alignment
was precisely adjusted. The mode matching
was optimized by the lens positions. The
  
  345   Wed Apr 17 10:30:37 2019 PhilipOpticsGeneralOMC optical set-up day 1[Joe, Koji, Liyuan, Philip, Stephen]
Work done on 16.04.2019
  
  128   Mon May 20 14:59:21 2013 KojiGeneralGeneralOMC is out from the ovenThe OMC came back to the table again.
No obvious change is visible: no
crack, no delamination
  
  119   Fri May 3 21:09:08 2013 KojiGeneralGeneralOMC is backL1 OMC is back on the table for the action
next week.
  
  346   Thu Apr 18 20:47:54 2019 JoeOptics OMC initial alignment and locking[Joe, Phillip, Koji, Stephen]

*draft post, please add anymore
info if I missed something*
 IMG_7676.JPGIMG_7666.JPGIMG_7670.JPGIMG_7883.JPGIMG_7882.JPG 
  349   Fri Apr 19 11:34:19 2019 KojiOptics OMC initial alignment and lockingThe spot on CM1 was found displaced by
3.4mm (horiz.) and 3.0mm (vert.)
in the upper right direction looking from
 misalignment1.pdf 
  135   Mon Jun 3 18:58:08 2013 KojiOpticsConfigurationOMC final tests- QPD mount aligned, QPD output checked
  The spots are with 100um from
the center of the diodes. [ELOG
  
  79   Mon Mar 25 02:04:05 2013 KojiGeneralGeneralOMC building plan / procedure ~ WB18WB 18 March 

    Diode test
    
        Dark current
  
ELOG V3.1.3-