  OMC elog, Page 4 of 9  Not logged in ELOG logo
Entry  Wed Dec 26 14:33:33 2012, Koji, Facility, General, Lase Interlock wired PC263073.jpgPC263074.jpgPC263075.jpg
Entry  Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier P8131960.JPG
Entry  Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule 
Entry  Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building 
Entry  Fri Dec 18 15:33:24 2015, Koji, General, Loan / Lending, Loan from Rich 
Entry  Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF 
Entry  Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow 
Entry  Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built 2013-04-03_23.43.00.jpg
Entry  Mon May 12 22:43:02 2014, Koji, Optics, Characterization, Measured FSR/TSM of the OMC cavity Cav_scan_response_Pitch.pdfCav_scan_response_Yaw.pdf
Entry  Thu Apr 4 01:43:06 2013, Koji, Optics, Characterization, Mirror T measurement 
Entry  Sat Nov 17 02:31:34 2012, Koji, Optics, Characterization, Mirror T test 
Entry  Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
Entry  Tue Apr 16 09:43:58 2013, Koji, Optics, Configuration, Mirror list for L1OMC OMC_breadboard_mirror_config.png
    Reply  Fri Aug 16 15:31:17 2013, Koji, Optics, Configuration, Mirror list for OMC(002) 
Entry  Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links 
Entry  Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC misalignment.pdf
Entry  Tue Aug 5 13:03:25 2014, Koji, General, General, Missing cable components 
Entry  Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity 
Entry  Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO 
Entry  Wed Aug 8 17:32:56 2018, Rich Abbott, General, Characterization, Modulation Index Test Setup at 40m Lab 40mLabModIndexSetup.pdf
    Reply  Thu Aug 9 11:24:29 2018, Koji, General, Characterization, Modulation Index Test Setup at 40m Lab modulation_depth.pdfmodulation_depth_zoom.pdf
Entry  Sun Sep 23 19:42:21 2018, Koji, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror reflectivities.pngtransmission.pngphase_diff.pngphase_difference_histogram.png
    Reply  Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror 
    Reply  Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror 
    Reply  Mon Apr 8 11:11:37 2013, Koji, Optics, Characterization, More Mirror T measurement 
Entry  Mon Nov 26 01:40:00 2012, Koji, Optics, Characterization, More RoC measurement RoC_measurement.pdf
Entry  Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment 
    Reply  Tue Apr 5 21:20:15 2016, Koji, Electronics, Characterization, More dark noise measurement PD_dark_current.pdf
    Reply  Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test 
    Reply  Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final 
    Reply  Thu Sep 10 04:03:42 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary) eLIGO_PBS.pdfHWP.pdfTFP.pdfGlasgow_PBS.pdf
    Reply  Wed Sep 23 17:49:50 2015, Koji, Optics, Characterization, More polarizer optics measurement (Summary) Glasgow_PBS_spotsize.pdf
Entry  Thu Nov 8 13:24:53 2012, Koji, Optics, Characterization, More wedge measurement wedge_measurement_overall.pdf
Entry  Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure 
Entry  Mon May 13 14:49:35 2013, Koji, Mechanics, Characterization, Mounting Glass Bracket still broke with tightenin stress 
Entry  Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors FSR_detuned_locking.pdfCM1_IMG_7702.JPGCM2_IMG_7704.JPG
Entry  Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered P3233349.jpg
Entry  Tue Aug 7 15:43:12 2018, Koji, Electronics, Characterization, New LLO EOM stuffed P_20180806_154457.jpgimpedance_eom.pdfimpedance_eom_zoom.pdf
Entry  Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test 
Entry  Tue Jul 3 12:07:47 2018, Rich Abbott, Electronics, Characterization, Notes on 3rd IFO EOM EOM_Analysis2.pdf
Entry  Wed Feb 18 21:51:23 2015, Koji, General, General, Notes on OMC Transportation Fixtures & Pelican 
Entry  Fri Jun 23 01:58:11 2017, Koji, Optics, General, OMC #002 Repair - CM1 gluing 6x
Entry  Tue Mar 19 17:30:25 2019, Koji, General, Characterization, OMC (002) Test items 
Entry  Fri Apr 5 23:30:20 2019, Koji, General, General, OMC (002) repair completed P_20190405_222401.jpgP_20190405_222509.jpgP_20190405_222529.jpg
Entry  Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking 
Entry  Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake IMG_6080.JPGIMG_6079.JPG
    Reply  Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake P_20191218_160650_vHDR_On.jpegP_20191218_160705_vHDR_On.jpegP_20191218_160733_003.jpeg
    Reply  Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake 
    Reply  Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake 
Entry  Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf