146
|
Tue Jun 18 15:45:38 2013 |
Koji | General | General | [LLO] OMC installation in HAM6 | OMC installed
in HAM6! |
|
147
|
Fri Jun 28 12:20:49 2013 |
Koji | General | General | Dmass's loan of Thorlabs HV amp | http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building) |
|
148
|
Sat Jul 6 17:10:07 2013 |
Koji | Mechanics | Characterization | PZT Response analysis | Analysis of the PZT scan / TF data taken
on May 31st and Jun 1st.
[DC scan] |
 |
149
|
Fri Aug 9 10:09:56 2013 |
Koji | General | General | PZT Assembly #3/#4 | Yesterday, Jeff and I bonded the PZT assemblies
(#3/#4).
The attached is the arrangement of |
|
150
|
Mon Aug 12 20:22:19 2013 |
Koji | General | General | PZT Assembly #5/#6 | PZT Assembly #5/#6 were glued on Fri Aug
9th
They are removed from the fixture |
|
151
|
Fri Aug 16 15:31:17 2013 |
Koji | Optics | Configuration | Mirror list for OMC(002) | OMC(002)
Cavity Mirrors
FM1 (input coupler): A9 |
|
152
|
Fri Aug 16 16:36:19 2013 |
Koji | Optics | General | Optics List | Link
to the "Mirror/PZT Characterization
links" |
|
153
|
Fri Aug 16 17:21:38 2013 |
Koji | General | General | [OMC002] Build started | [Jeff Koji]
The breadboard (SN2) was loaded
on the transportation fixture. |
|
154
|
Wed Aug 21 08:31:21 2013 |
Koji | Optics | Characterization | H1 OMC cavity alignment | Alignment of the H1 OMC cavity mirrors
- The cavity mirrors as well as the
first steering mirror were aligned on the |
|
155
|
Thu Aug 22 15:34:03 2013 |
Koji | Optics | General | OMC Cavity side gluing | [Koji Jeff]
o BS1, FM1, FM2 prisms were glued
=> This fixed the unstability of |
|
156
|
Thu Aug 22 15:40:15 2013 |
Koji | Electronics | Configuration | PZT endurance test | [Koji, Jeff]
Background
In response to the failure of one |
   |
157
|
Fri Aug 23 19:24:32 2013 |
Koji | Electronics | Configuration | PZT endurance test (II) | The
PZT tests were finished with the conclusion
that the PZT won't be damaged with our expected |
|
158
|
Tue Aug 27 17:02:31 2013 |
Koji | Mechanics | Characterization | Spot position measurement on the diode mounts | After the PZT test, the curved mirrors
were aligned to the cavity again.
In order to check the height of the |
|
159
|
Thu Aug 29 02:52:50 2013 |
Koji | Optics | Characterization | H1OMC Curved Mirror Alignment | Cavity
parameter was measured with 50V bias on PZT1
(CM1) |
 |
160
|
Thu Aug 29 18:55:36 2013 |
Koji | Mechanics | General | I1 OMC top side gluing (UV) | The glass components for the I1 OMC top
side were glued by the UV glue.
Breadboard SN#4 |
|
161
|
Fri Aug 30 12:14:50 2013 |
Koji | Optics | General | H1 OMC Cavity length adjustment | Short
conclusion:
The roundtrip cavity length for |
 |
162
|
Fri Aug 30 12:22:56 2013 |
Koji | Optics | General | H1 OMC Cavity side UV gluing | H1 OMC Cavity side optics was glued
on the breadboard
|
|
163
|
Fri Aug 30 12:24:28 2013 |
Koji | Optics | Characterization | H1OMC Spot positions | Beam heights on the diodes
DCPD1: 14.459mm -> With 1.5mm |
   |
164
|
Fri Aug 30 12:25:29 2013 |
Koji | General | General | H1 OMC Invar mount gluing | The Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 -> |
 |
165
|
Tue Sep 3 17:03:25 2013 |
Koji | General | General | H1 OMC gluing completed | [Koji Jeff]
H1 OMC |
|
166
|
Wed Sep 4 22:22:54 2013 |
Koji | General | General | H1 OMC wrapped and moved to the bake lab. | [Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven |
|
167
|
Sat Sep 7 17:20:56 2013 |
Koji | General | General | OMC/PD lab optical table wrapping | [Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table |
|
168
|
Fri Sep 13 15:09:20 2013 |
Koji | General | General | Sprinkler installation: done | A sprinkler head was installed on the HEPA
enclosure. The head is covered with a plastic
cap. |
 |
169
|
Mon Oct 14 13:40:16 2013 |
Koji | Optics | Characterization | H1 OMC Optical testing | Since the middle of September, the optical
tests of H1 OMC were took place.
Here is summary of the progress. |
|
170
|
Mon Oct 14 15:50:55 2013 |
Koji | Optics | Characterization | H1 OMC Power budget | LHO OMC power budget
|
|
171
|
Tue Oct 15 18:50:08 2013 |
Koji | Optics | Characterization | QPD alignment | 1) Deburr the bottom surfaces of the QPD
housings
2) Aligned the QPDs |
|
172
|
Wed Oct 16 19:16:29 2013 |
Koji | Optics | Characterization | PD alignment |
shim 1.5mm 001/002 |
|
173
|
Tue Oct 22 17:17:59 2013 |
Koji | General | General | H1OMC cabling | [Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables. |
|
174
|
Wed Oct 23 02:45:07 2013 |
Koji | General | General | PD realignment | DCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again. |
|
175
|
Mon Nov 4 19:43:56 2013 |
Koji | General | General | H1OMC Packed | H1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC. |
|
176
|
Thu Nov 21 00:05:35 2013 |
Koji | General | General | H1OMC electronics arrangement | Checked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side) |
|
177
|
Tue Dec 10 16:41:51 2013 |
Koji | General | General | To Buy | Masks / Wipes => done |
|
178
|
Tue Feb 18 18:58:38 2014 |
Koji | General | General | LHO H1 OMC installation photos | LHO OMC installation photos
|
|
179
|
Fri Feb 28 19:50:11 2014 |
Koji | General | General | Misalignment ABCD matrix for the aLIGO OMC | Relationship between mirror misalignment
and cavity mode shift was calculated.
The technique described in T0900647 |
|
180
|
Mon Mar 3 02:46:21 2014 |
Koji | General | Characterization | Spot positions scanned | Spot positions on CM1 and CM2 scanned according
to the recipes provided by the previous entry.
The best result obtained was: |
|
181
|
Tue Mar 25 17:10:10 2014 |
Koji | Optics | Characterization | OMC spot position estimation | Spot positions were inferred from the photos |
|
182
|
Thu Apr 17 21:39:25 2014 |
Koji | Optics | General | More alignment | STORY:
- The cavity mirrors have scattering
spots. The cavity alignment should have been |
|
183
|
Mon May 12 22:43:02 2014 |
Koji | Optics | Characterization | Measured FSR/TSM of the OMC cavity | Data analysis of the FSR/TSM measruement
last week.
1. FSR was measured with "the |
 |
184
|
Wed May 14 02:15:15 2014 |
Koji | Optics | Characterization | FSR/TSM adjustment of the OMC cavity | 1. FSR was adjusted and measured with "the
golden arches" technique again.
FSR = 264.8412 MHz +/- 1400Hz => |
 |
185
|
Fri May 16 00:13:36 2014 |
Koji | Optics | Characterization | Cavity mirror gluing part 1 | BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted |
|
186
|
Sat May 17 07:40:14 2014 |
Koji | Optics | Characterization | I1OMC cavity mirrors glued | I1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m
(nominal 1.132m) |
 |
187
|
Thu Jun 19 23:16:50 2014 |
Koji | Optics | General | All of the prisms have been glued | - All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been
glued |
|
188
|
Fri Jun 20 18:59:12 2014 |
Koji | Optics | General | All of the invar blocks have been glued | All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed. |
|
189
|
Mon Jun 23 21:54:16 2014 |
Koji | Optics | General | All of the gluing completed | The bottom-side templates were removed.
The last beam dump was removed
TODO |
|
190
|
Tue Jun 24 18:43:15 2014 |
Koji | General | General | ICS entries for the OMC baking/assembly | For baking:
Assembly Name aLIGO Output
Mode Cleaner |
|
191
|
Fri Jun 27 12:29:50 2014 |
Koji | General | General | OMC baking | The OMC went into the oven at around 2PM
on Thursday. It will be baked at 80degC for
48 hours. |
|
192
|
Fri Jun 27 18:51:33 2014 |
Koji | General | General | Supply | PTOUCH TAPE (12mm white) x 2
9V batteries |
|
193
|
Wed Jul 2 16:41:43 2014 |
Koji | General | General | OMC baking | OMC is back from the oven today.
To Do:
Optical tests |
|
194
|
Wed Jul 2 18:58:42 2014 |
Koji | General | General | Beam dump delamination | While the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination. |
|
195
|
Thu Jul 3 17:45:18 2014 |
Koji | General | General | Beam dump delamination | Here is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure). |
|