40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 3 of 9  Not logged in ELOG logo
Entry  Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment 
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
Entry  Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment Cav_scan_response_130828_Pitch.pdfCav_scan_response_130828_Yaw.pdf
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
Entry  Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Entry  Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH 
Entry  Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf
    Reply  Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept HOM_plot.pdf
Entry  Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE QE1.pngQE2.png
Entry  Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison) 
Entry  Sat Mar 26 17:39:50 2016, Koji, Electronics, Characterization, HQEPD dark noise PD_dark_current.pdf
Entry  Fri Jul 22 22:24:05 2016, Koji, General, General, HQEPD inventory 
Entry  Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched P6191706.jpg
Entry  Thu Nov 8 20:12:10 2012, Koji, Optics, Configuration, How many glass components we need for a plate 
Entry  Thu Nov 8 19:52:57 2012, Koji, Optics, General, How to apply UV epoxy UVepoxy.jpg
Entry  Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV) 
Entry  Fri Jul 11 00:06:33 2014, Koji, Optics, Characterization, I1OMC PD 
Entry  Thu Jul 10 23:22:28 2014, Koji, Optics, Characterization, I1OMC QPD 
Entry  Sat May 17 07:40:14 2014, Koji, Optics, Characterization, I1OMC cavity mirrors glued Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf
Entry  Thu Jul 17 02:19:20 2014, Koji, Mechanics, Characterization, I1OMC vibration test 6x
    Reply  Sun Jul 20 17:19:50 2014, Koji, Mechanics, Characterization, I1OMC vibration test ~ 2nd round 9x
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
Entry  Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test HQEPD_high_power_test.pdfpd_images.png
    Reply  Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf
Entry  Mon Jul 2 12:29:01 2018, Koji, Electronics, Characterization, Impedances of individual components (3IFO EOM) impedance_coils.pdfimpedance_xtals.pdfq_coils.pdfcomponent_models.pdfliso_models.zip
Entry  Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf
Entry  Thu May 9 16:07:18 2019, Stephen, Mechanics, General, Improvements to OMC Bonding Fixture image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG
Entry  Tue Aug 23 23:36:54 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 7x
    Reply  Thu Aug 25 02:17:09 2016, Koji, Optics, Characterization, Inspection of the damaged CM1 (prev H1OMC) 
Entry  Fri Nov 20 18:51:23 2020, Koji, General, General, Instrument loan 
Entry  Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing 
Entry  Thu Jul 31 15:07:53 2014, Koji, General, General, Item lending 
    Reply  Fri Jan 30 19:31:08 2015, Koji, General, General, Item lending 
    Reply  Tue Feb 3 18:23:49 2015, Koji, General, General, Item lending 
    Reply  Wed Feb 4 20:07:24 2015, Koji, General, General, Item lending C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG
    Reply  Tue Jul 21 20:20:12 2015, Koji, General, General, Item lending 
    Reply  Fri Sep 9 14:34:31 2016, Koji, General, General, Item lending 
    Reply  Thu Feb 27 14:31:13 2020, Koji, General, General, Item lending P_20200227_134755_vHDR_On.jpg
    Reply  Mon Aug 10 15:29:54 2020, Koji, General, General, Item lending 
Entry  Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding IMG_5216.JPGIMG_5215.JPG
Entry  Fri Jun 10 17:12:57 2016, Koji, General, Configuration, L1 OMC DCPD replacement 
Entry  Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram L1OMC_asbuilt.pdf
Entry  Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out CAM00011.jpgP6054027.JPG
Entry  Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos 
Entry  Mon Nov 21 21:19:20 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
    Reply  Wed Dec 7 19:18:10 2016, Koji, Optics, General, LWE NPRO Laser / Input Optics / Fiber Coupling 
Entry  Mon Aug 10 15:53:46 2020, Koji, General, General, Lab status check 
ELOG V3.1.3-