Wed May 8 15:36:50 2013, Koji, General, General, Latest OMC schedule
|
Mon May 13 15:00:23 2013, Koji, General, General, Current most reliable OMC schedule
|
Tue May 21 18:28:08 2013, Koji, General, General, Current most reliable OMC schedule
|
Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount
|
Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting
|
Thu May 30 15:00:28 2013, Koji, Optics, General, QPD alignment
|
Fri May 31 05:46:54 2013, Koji, Optics, General, QPD alignment  
|
Fri May 31 14:07:54 2013, Koji, Optics, Characterization, Transverse Mode Spacing measurement afte the baking 
|
Mon Jun 3 18:58:08 2013, Koji, Optics, Configuration, OMC final tests
|
Mon Jun 3 21:19:03 2013, Koji, General, General, Planning
|
Wed Jun 5 01:06:35 2013, Zach, General, Characterization, L1 OMC as-built diagram
|
Wed Jun 5 18:19:51 2013, Koji, General, General, Some recent photos from the OMC final test at CIT
|
Wed Jun 5 18:51:31 2013, Koji, General, General, L1 OMC shipped out 
|
Fri Jun 7 16:04:44 2013, Koji, General, General, [LLO] OMC arrived
|
Mon Jun 10 10:04:37 2013, Koji, General, General, [LLO] OMC Test  
|
Thu Jun 13 12:04:57 2013, Koji, General, General, [LLO] OMC Optical Test - completed
|
Thu Jun 13 12:12:20 2013, Zach, General, General, [LLO] OMC and OMCS in LVEA
|
Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status
|
Tue Jun 18 10:01:11 2013, Koji, Optics, Characterization, Cavity Finesse analysis
|
Tue Jun 18 15:45:38 2013, Koji, General, General, [LLO] OMC installation in HAM6
|
Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp
|
Sat Jul 6 17:10:07 2013, Koji, Mechanics, Characterization, PZT Response analysis 
|
Fri Aug 9 10:09:56 2013, Koji, General, General, PZT Assembly #3/#4
|
Mon Aug 12 20:22:19 2013, Koji, General, General, PZT Assembly #5/#6
|
Tue Apr 16 09:43:58 2013, Koji, Optics, Configuration, Mirror list for L1OMC
|
Fri Aug 16 15:31:17 2013, Koji, Optics, Configuration, Mirror list for OMC(002)
|
Fri Aug 16 16:36:19 2013, Koji, Optics, General, Optics List
|
Fri Aug 16 17:21:38 2013, Koji, General, General, [OMC002] Build started
|
Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment
|
Thu Aug 22 15:34:03 2013, Koji, Optics, General, OMC Cavity side gluing
|
Thu Aug 22 15:40:15 2013, Koji, Electronics, Configuration, PZT endurance test   
|
Fri Aug 23 19:24:32 2013, Koji, Electronics, Configuration, PZT endurance test (II)
|
Tue Aug 27 17:02:31 2013, Koji, Mechanics, Characterization, Spot position measurement on the diode mounts
|
Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment 
|
Thu Aug 29 18:55:36 2013, Koji, Mechanics, General, I1 OMC top side gluing (UV)
|
Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment 
|
Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing
|
Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions   
|
Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing 
|
Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed
|
Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab.
|
Sat Sep 7 17:20:56 2013, Koji, General, General, OMC/PD lab optical table wrapping
|
Fri Sep 13 15:09:20 2013, Koji, General, General, Sprinkler installation: done 
|
Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing
|
Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget
|
Tue Oct 15 18:50:08 2013, Koji, Optics, Characterization, QPD alignment
|
Wed Oct 16 19:16:29 2013, Koji, Optics, Characterization, PD alignment
|
Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling
|
Wed Oct 23 02:45:07 2013, Koji, General, General, PD realignment
|
Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed
|
Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement
|
Tue Dec 10 16:41:51 2013, Koji, General, General, To Buy
|
Tue Feb 18 18:58:38 2014, Koji, General, General, LHO H1 OMC installation photos
|
Fri Feb 28 19:50:11 2014, Koji, General, General, Misalignment ABCD matrix for the aLIGO OMC
|
Mon Mar 3 02:46:21 2014, Koji, General, Characterization, Spot positions scanned
|
Tue Mar 25 17:10:10 2014, Koji, Optics, Characterization, OMC spot position estimation
|
Thu Apr 17 21:39:25 2014, Koji, Optics, General, More alignment
|
Mon May 12 22:43:02 2014, Koji, Optics, Characterization, Measured FSR/TSM of the OMC cavity 
|
|