40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 3 of 9  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  154   Wed Aug 21 08:31:21 2013 KojiOpticsCharacterizationH1 OMC cavity alignmentAlignment of the H1 OMC cavity mirrors
- The cavity mirrors as well as the
first steering mirror were aligned on the
  
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  159   Thu Aug 29 02:52:50 2013 KojiOpticsCharacterizationH1OMC Curved Mirror AlignmentCavity
parameter was measured with 50V bias on PZT1
(CM1)
 Cav_scan_response_130828_Pitch.pdfCav_scan_response_130828_Yaw.pdf 
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  163   Fri Aug 30 12:24:28 2013 KojiOpticsCharacterizationH1OMC Spot positionsBeam heights on the diodes

DCPD1: 14.459mm -> With 1.5mm
 DCPD1.pngDCPD2.pngQPD1.pngQPD2.png 
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  368   Mon Jun 24 12:54:58 2019 KojiCleanGeneralHEPA BOOTHhttps://www.airscience.com/purair-flow-laminar-flow-cabinets   
  198   Sun Jul 6 03:56:40 2014 KojiOpticsCharacterizationHOM measurement with PZT vol sweptCavity FSR/TMS measurement (2014/7/5) with
PZT voltages swept from 0V to 200V (50V step)
 Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf 
  199   Sun Jul 6 08:31:14 2014 KojiOpticsCharacterizationHOM measurement with PZT vol swept3rd OMC, HOM diagram at PZT1=0V and PZT2=50V.
First coincidence with the carrier
is the 32nd-order carrier mode. Very good.
 HOM_plot.pdf 
  255   Sat Mar 26 01:49:48 2016 KojiOpticsCharacterizationHQEPD QECalibration
of the transimpedance

Use KEITHLEY 2450 as a calibrated
 QE1.pngQE2.png 
  254   Sun Mar 13 22:02:09 2016 KojiOpticsCharacterizationHQEPD QE measurement (direct comaprison)Direct comparison of the PD responsibities

We
can expect 5% increase of the QE with the
  
  256   Sat Mar 26 17:39:50 2016 KojiElectronicsCharacterizationHQEPD dark noiseDark noise measurement for 6 HQEPDs and
1 C30665. All of these showed sufficiently
low dark current noise levels compared with
 PD_dark_current.pdf 
  262   Fri Jul 22 22:24:05 2016 KojiGeneralGeneralHQEPD inventoryAs of Jul 22, 2016
As of Aug 11, 2016
As of Aug 16, 2016
  
  3   Wed Jun 20 00:10:53 2012 KojiFacilityGeneralHole on the wall was patched   P6191706.jpg 
  38   Thu Nov 8 20:12:10 2012 KojiOpticsConfigurationHow many glass components we need for a plateOptical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
  
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  160   Thu Aug 29 18:55:36 2013 KojiMechanicsGeneralI1 OMC top side gluing (UV)The glass components for the I1 OMC top
side were glued by the UV glue.
Breadboard SN#4
  
  206   Fri Jul 11 00:06:33 2014 KojiOpticsCharacterizationI1OMC PDDCPD#            
DCPD1      DCPD2
Housing#         
  
  205   Thu Jul 10 23:22:28 2014 KojiOpticsCharacterizationI1OMC QPDQPD#             
QPD1      
QPD2
  
  186   Sat May 17 07:40:14 2014 KojiOpticsCharacterizationI1OMC cavity mirrors gluedI1OMC cavity mirrors were glued.
FSR = 264.82MHz => Lcav = 1.132m
(nominal 1.132m)
 Cav_scan_response_140516_Pitch.pdfCav_scan_response_140516_Yaw.pdf 
  210   Thu Jul 17 02:19:20 2014 KojiMechanicsCharacterizationI1OMC vibration testSummary
- The breadboard has a resonance
at 1.2kHz. The resonant freq may be chagned
 6x 
  211   Sun Jul 20 17:19:50 2014 KojiMechanicsCharacterizationI1OMC vibration test ~ 2nd roundImproved
vibration measurement of the OMC
Improvement
 9x 
  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assemblyFor baking:

    Assembly Name aLIGO Output
Mode Cleaner
  
  366   Thu May 23 23:27:38 2019 KojiOpticsCharacterizationIGHQEX3000 high power testLaserComponents IGHQEX3000 (Cage
B2: Serial# B1-23) was exposed to the beam
with the optical power from 1.6mW to 332mW.
 HQEPD_high_power_test.pdfpd_images.png 
  403   Sun Nov 22 13:49:12 2020 KojiElectronicsCharacterizationImpedance Measurement for InGaAs QPDsTo know any anomaly to the junction
capacitance of the QPD segments, the RF impedances
were tested with a hand-made impedance measurement.
 impedance_measurement.pdfP_20201121_183830.jpgimpedance_test.pdfQ3000_impedance_test.pdf 
  299   Mon Jul 2 12:29:01 2018 KojiElectronicsCharacterizationImpedances of individual components (3IFO EOM)[Rich Koji]

The impedances of the individual
components from the 3IFO EOM (before modification)
 impedance_coils.pdfimpedance_xtals.pdfq_coils.pdfcomponent_models.pdfliso_models.zip 
  31   Thu Oct 18 20:23:33 2012 KojiOpticsCharacterizationImproved measurementSignificant
improvement has been achieved in the RoC
 Cav_scan_response_zoom_20121017.pdfdetailed_RoC_setup.pdf 
  358   Thu May 9 16:07:18 2019 StephenMechanicsGeneralImprovements to OMC Bonding Fixture[Stephen, Koji]

As mentioned in eLOG
331, either increased thermal cycling
 image_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.pngimage_02_of_issue_with_OMC_PZT_bonding_fixture_from_D16003336-v3.PNG 
  266   Tue Aug 23 23:36:54 2016 KojiOpticsCharacterizationInspection of the damaged CM1 (prev H1OMC)1. Calum and GariLynn checking the CM1
defect from the front side.
2. Same as above
 7x 
  267   Thu Aug 25 02:17:09 2016 KojiOpticsCharacterizationInspection of the damaged CM1 (prev H1OMC)Initial inspection results by Calum, et
al.
https://dcc.ligo.org/LIGO-E1600268
  
  401   Fri Nov 20 18:51:23 2020 KojiGeneralGeneralInstrument loanFEMTO DLPCA200 low noise preamp (brand
new)

Keithley Source Meter 2450 (brand
  
  125   Mon May 13 14:59:16 2013 KojiMechanicsGeneralInvar shim gluingThe invar reinforcement shims were glued
on the glass brackets on the breadboard.
  
  214   Thu Jul 31 15:07:53 2014 KojiGeneralGeneralItem lendingTara: Laser Safety goggle ->
Returned

Evan:
  
  220   Fri Jan 30 19:31:08 2015 KojiGeneralGeneralItem lendingGabriele:

PZT HV Amp

Evan:
  
  221   Tue Feb 3 18:23:49 2015 KojiGeneralGeneralItem lending- The laser was removed and shipped to
LHO today.

- UV illuminator / fused silica
  
  222   Wed Feb 4 20:07:24 2015 KojiGeneralGeneralItem lendingShipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super
Spot MK III)
 C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG 
  226   Tue Jul 21 20:20:12 2015 KojiGeneralGeneralItem lendingKate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
  
  268   Fri Sep 9 14:34:31 2016 KojiGeneralGeneralItem lendingTo 40m

First Contact Kit by Calum

Class A Kapton sheets
  
  389   Thu Feb 27 14:31:13 2020 KojiGeneralGeneralItem lendingItem lending as per Ian's request:
Particle Counter from OMC Lab to QIL

 
 P_20200227_134755_vHDR_On.jpg 
  390   Mon Aug 10 15:29:54 2020 KojiGeneralGeneralItem lendingThe particle counter came back to the OMC
lab on Aug 10, 2020

 
  
  376   Wed Sep 18 23:16:06 2019 StephenSupplyGeneralItems staged at 40m Bake Lab for PZT Subassembly BondingThe following items are presently staged
at the 40m Bake Lab (see photo indicating
current location) (noting items broght by
 IMG_5216.JPGIMG_5215.JPG 
  261   Fri Jun 10 17:12:57 2016 KojiGeneralConfigurationL1 OMC DCPD replacementNew DCPD(T) = A1-23
DCPD(T) = DCPDB: extracted and accomodated
in CAGE-G SLOT1
  
  137   Wed Jun 5 01:06:35 2013 ZachGeneralCharacterizationL1 OMC as-built diagram D1300507
 
 L1OMC_asbuilt.pdf 
  139   Wed Jun 5 18:51:31 2013 KojiGeneralGeneralL1 OMC shipped out[Koji, Jeff]
The L1 OMC
 CAM00011.jpgP6054027.JPG 
  178   Tue Feb 18 18:58:38 2014 KojiGeneralGeneralLHO H1 OMC installation photosLHO OMC installation photos
  
  270   Mon Nov 21 21:19:20 2016 KojiOpticsGeneralLWE NPRO Laser / Input Optics / Fiber Coupling- About 1.5 month ago, an 700mW LWE NPRO
has been brought to OMC Lab.

- The SOP can be found here.
  
  271   Wed Dec 7 19:18:10 2016 KojiOpticsGeneralLWE NPRO Laser / Input Optics / Fiber CouplingFIber Input Mount 132deg
Fiber output mount 275deg
-> 525mW P: 517mW S: 8mW extinction
  
  392   Mon Aug 10 15:53:46 2020 KojiGeneralGeneralLab status checkCheck-in to the OMC lab to see the status.
Nothing seemed changed. No bug. The HEPA
is running normal. The particle level was
  
ELOG V3.1.3-