126
|
Mon May 13 15:00:23 2013 |
Koji | General | General | Current most reliable OMC schedule |
May
Tue 14th The OMC given to Bob (Air bake & Vac bake)
Mon 20th The OMC received from Bob
Apply First contact
Diode mount adjustment / Electronic tests
Tue 21st Diode mount adjustment / Electronic tests / Optical tests
Wed 22nd Final cabling (***Chub***)
Thu 23rd Final cabling / Packing
Fri 24th Packing / Shipping
Mon 27th? Arrival to LLO / Koji fly to LLO
Tue 28th Test on the optical bench
Wed 29th Test on the optical bench
Thu 30th Suspension test? (***Jeff B***)
June
Tue 4th Suspension test done? |
128
|
Mon May 20 14:59:21 2013 |
Koji | General | General | OMC is out from the oven |
The OMC came back to the table again.
No obvious change is visible: no crack, no delamination
The OMC was fixed on the table and the beam was aligned to the cavity |
129
|
Tue May 21 18:28:08 2013 |
Koji | General | General | Current most reliable OMC schedule |
- The wrong Mighty Mouse connectors for the PZT wires were prepared. The correct ones are in the vacuum oven till Tuesday morning.
- The thread holes for the cable pegs are 1/4-20 rather than 10-24. This requires re-machining of the cable pegs & the C&B.
- We are waiting for the fast shipment of the from LHO
May
Thu 23rd Diode mount adjustment / Optical tests
Fri 24th Optical tests
Tue 28th Mighty mouse connector available / Diode mounting finalization
Wed 29th final check
Thu 30th shipment
Fri 31th
June
Mon 3rd ? Arrival to LLO / Koji fly to LLO
Tue 4th Suspension test done? |
136
|
Mon Jun 3 21:19:03 2013 |
Koji | General | General | Planning |
Monday - Evening
(Koji)
[done] - DCPD alignment
[done] - DCPD test & through-put measurement
[done] - Power dependence test
[done] - Apply Protective First Contact Layer on the optic surfaces
[done] - Wiping the OMC
Tuesday - Morning
(Chub)
[done] - Bring the cable from the oven
Tuesday - Afternoon
(Chub/Jeff)
[done] - Cabling of the OMC
Wednesday - Morning
(Jeff/Koji)
[done] - Cable tying down
[done] - Screw tightening for the PDs
[done] - Wrapping / Packing
[done] - Weighting? (65lb for everything)
(Jeff/George)
[done] - Shipping? (or Wednesday)
Items to be shipped together
v - OMC cables between the cable harness to the suspension
v - 1 PZT cable pin
v - DCPD preamp kit
v - toruqe driver & bits
v - kapton sheet/tube
v - Test PD cables
v - Spare diodes
v - QPD amp circuits (just in case)
v - 1GHz PD / Power supply banana-PD cable / 1GHz PD cables
[done] - Installation scheduling with Peter/Brian/(Mike?)
- Travel plan
[done] Koji goes LLO immediately (possible?) 6/6-6/22
Jeff goes LLO next week?
(Koji)
[done] - Room cleaning
--------------------------
Optical testing plan
Day 0
- Freight and Koji moving
Day 1 Arrival (Thursday or Friday)
- Inspect the shock detector
- Unpacking
- Check the condition of the breadboard
- Place the transportation fixture on the table
- Removing the First Contact layers
- Locking
- Mode matching
Day 2
- Transmission measurement
- Power dependence test
- PD installation / (diode can opening, optional)
- (PD realign, optional)
- diode test
Day 3
- Power dependence test
---------------------------
OMC installation plan
TBD
---------------------------
OMCS installation plan
TBD
---------------------------
Documents
- OMC Hazard analysis (done)
- OMCS Hazard analysis (done)
- OMC instllation procedure
- OMCS instllation procedure
- Work permits
cf. previous documents: E080024, E1300201
---------------------------
---------------------------
Misc
- LIGO access card
controls@lloisc0-work:~$ 2.23-5mW T
2.23-5mW: command not found
controls@lloisc0-work:~$ 2.17 \pm 0.01 R
2.17: command not found
controls@lloisc0-work:~$ 67-68mV inlock
67-68mV: command not found
controls@lloisc0-work:~$ 973mV unlock
973mV: command not found
controls@lloisc0-work:~$ Pin 5.47+-0.014.4
No command 'Pin' found, did you mean:
|
137
|
Wed Jun 5 01:06:35 2013 |
Zach | General | Characterization | L1 OMC as-built diagram |
D1300507
 |
138
|
Wed Jun 5 18:19:51 2013 |
Koji | General | General | Some recent photos from the OMC final test at CIT |
Applying First Contact for the optics cleaning
PD alignment / scattering photos
Cabling
Cabling (final)
|
139
|
Wed Jun 5 18:51:31 2013 |
Koji | General | General | L1 OMC shipped out |
[Koji, Jeff]
The L1 OMC finally sent out from Caltech!
 |
140
|
Fri Jun 7 16:04:44 2013 |
Koji | General | General | [LLO] OMC arrived |
[Koji Zach Suresh]
The OMC arrived at LLO without any destruction!
- We found that one shock sensor on the box turned red, the other stayed white.
- We brought the Perican case to the changing room and the wrapping was opened in the optics lab.
- The OMC was discovered without any obvious damage. Successful shipment!
- The inspection with a halogen light indicated some amount of particules on the breadboard.
The both sides of the breadboard were wiped with the cleanroom cloth.
- The First Contact layers on the optics were removed while the ionized nitrogen gas was brew.
|
141
|
Mon Jun 10 10:04:37 2013 |
Koji | General | General | [LLO] OMC Test |
[Koji Zach]
We worked on the OMC test over the weekend.
- At the beginning, the measured OMC transmission was ~85% even after subtracting the junk light and sidebands from the calculation.
- A pretty visible (by eye) dust were on CM1. Also a small residue of First Contact was found on the same mirror.
- We applied FC only on CM1 to remove these.
- The measued transmission went up to the level of 96%.
- We swept the incident power from 0.3mW to 30mW in order to see the dependence of the transmission against the incident power.
- The variation of the transmission ~10% was observed (attached figure 1, Red). This was compared with the similar dependence measured at Caltech (Magenta)
- So, the reduction of the transmission was observed as in eLIGO, although the measurements at Caltech and LLO are not consistent.
- Can this be attributed to the dependence of the PD efficiency? We measured the incident power on the PDs together with the preamp DC output. (Figure.2)
This gives us how the responsivity changes with the incident power.
- Nevertheless, the dependence remains. We'll make more accurate measurement today. |
142
|
Thu Jun 13 12:04:57 2013 |
Koji | General | General | [LLO] OMC Optical Test - completed |
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373 |
143
|
Thu Jun 13 12:12:20 2013 |
Zach | General | General | [LLO] OMC and OMCS in LVEA |
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
|
144
|
Fri Jun 14 06:35:21 2013 |
Jeff | General | General | [LLO] L1 OMC status |
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation box: 250.8lb
Suspension cage and transportation box: 150.2lb ==> 100.6lb ==> 45,630 g
Metal Breadboard: 7261 g
Glass Breadboard and transportation fixture: 16382 g
Transportation fixture only: 9432 g ==> 6950 g
Added mass (up to now): 300 g ==> 7250 g
Preamp arrangement
|
146
|
Tue Jun 18 15:45:38 2013 |
Koji | General | General | [LLO] OMC installation in HAM6 |
OMC installed in HAM6!
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7486
|
147
|
Fri Jun 28 12:20:49 2013 |
Koji | General | General | Dmass's loan of Thorlabs HV amp |
http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building) |
149
|
Fri Aug 9 10:09:56 2013 |
Koji | General | General | PZT Assembly #3/#4 |
Yesterday, Jeff and I bonded the PZT assemblies (#3/#4).
The attached is the arrangement of the components |
150
|
Mon Aug 12 20:22:19 2013 |
Koji | General | General | PZT Assembly #5/#6 |
PZT Assembly #5/#6 were glued on Fri Aug 9th
They are removed from the fixture on Mon Aug 12th.
All of the four PZT assemblies were moved to the OMC lab. |
153
|
Fri Aug 16 17:21:38 2013 |
Koji | General | General | [OMC002] Build started |
[Jeff Koji]
The breadboard (SN2) was loaded on the transportation fixture.
The laser side template was installed and the cavity mirrors were placed.
The laser beam will be resonated in the cavity next week. |
164
|
Fri Aug 30 12:25:29 2013 |
Koji | General | General | H1 OMC Invar mount gluing |
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side |
165
|
Tue Sep 3 17:03:25 2013 |
Koji | General | General | H1 OMC gluing completed |
[Koji Jeff]
H1 OMC All Gluing completed
5 Glue H1 beam dumps (UV)
4 glass wire brackets glued on the H1 topside (UV) SN: #9/10/11/12
6 Invar blocks glued on the H1 topside (EP30) SN: #13/14/15/16/18/19 |
166
|
Wed Sep 4 22:22:54 2013 |
Koji | General | General | H1 OMC wrapped and moved to the bake lab. |
[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.
We use low temperature (55degC) for the baking.
The actual OMC will be baked from tomorrow afternooon. |
167
|
Sat Sep 7 17:20:56 2013 |
Koji | General | General | OMC/PD lab optical table wrapping |
[Koji Jeff]
In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets. |
168
|
Fri Sep 13 15:09:20 2013 |
Koji | General | General | Sprinkler installation: done |
A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap. |
173
|
Tue Oct 22 17:17:59 2013 |
Koji | General | General | H1OMC cabling |
[Chub, Jeff, Koji]
We worked on the wiring and routing of the cables.
- The cables for the PZT was installed first.
- Pins for the mighty mouse connector were crimped on the PZT wires
- Checked the wiring diagram (D1300589) to find the pinouts.
Pin1 of the mighty mouse is connected to PZT2+, Pin2 to PZT2-, PIn3 to PZT1+, and Pin4 to PZT1-
- Then QPD and PD cables are fixed on the cable harness.
- The QPD/PD cables are attached on the diode housings.
During this process one of the DCPD mounts moved. The fixing screws were not torqued enough.
This means that all of the FC layers need to be removed and the DCPD housing should be aligned again.
- We continued on the cabling. The cables were routed on the top (cable) side.
- Some of the cable pegs were tightened by PEEK cable ties.
- We found that Pin1 and Pin2 of the PZT cables were not intact anymore.
- We ask Chub to work on the PZT pins tomorrow. The PD alignment will be taken tonight or tomorrow. |
174
|
Wed Oct 23 02:45:07 2013 |
Koji | General | General | PD realignment |
DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.
Cavity locking
- Removed the FC layers for the cavity related mirrors.
- Aligned and locked the cavity.
PD alignment
- Loosen DCPD2. Checked the reflection with a IR card. Checked the spot on the PD with an IR viewer.
- Finger-tight the screws. Check the reflection with the card again. Check the pot on the PD with a CCD.
- If the spot positions are not satisfactory repeat the process.
- If the spot positions are satisfactory, take pictures of the CCD image.
- Fixing screws for all of the PDs/QPDs were tighten by the torque driver with a torque od 1.75 inch lb.
PD QE measurements
- Measure the power incident on the PDs.
- Set up the transimpedance amp to check the photo current.
- PD1 (T side) 9.10+/-0.03 V 13.02 +/- 0.01W -> QE ~80%
- PD2 (R side) 8.70+/-0.01 V 12.53 +/- 0.01W -> QE ~80%
- These are not strange values considering the presence of the glass caps.
PZT polarity check
- The connections between the PZT electrodes and the pins were checked.
- The positive side is marked by a knot on the wire.
FC painting
- The new FC bottle was brought from Downs, thanks to Margot.
|
175
|
Mon Nov 4 19:43:56 2013 |
Koji | General | General | H1OMC Packed |
H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.
Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.
The other tools are also packed in the other box. Here is the list of the items
- Spare PD/QPDs (2 cages)
- Test PD/QPD cables
- Torque driver / bits
- Low noise transimpedance amp
- Kapton sheets
- First Contact kit
- 1/4-20 Screws for the balance weights
- OMC-Structure cables
- Preamp adapter plate
- Screws for the cable mounts
- Clean tools
(scissors, tweezers, forceps, Diagonal pliers, long nose prier)
- Spare Peek cable ties
|
176
|
Thu Nov 21 00:05:35 2013 |
Koji | General | General | H1OMC electronics arrangement |
Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)
DCPD response:
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Illuminate DCPD2 (R) -> DCPD A responded in MEDM
QPD response:
Illuminate QPD1 -> QPD A responded in MEDM
Illuminate QPD2 -> QPD B responded in MEDM
--------
DCPD1 (T) is marked as "A". This PD is SN"0288"
DCPD2 (R) is marked as "B". This PD is SN"0721"
Corresponding iLOG for the performance
|
177
|
Tue Dec 10 16:41:51 2013 |
Koji | General | General | To Buy |
Masks / Wipes => done |
178
|
Tue Feb 18 18:58:38 2014 |
Koji | General | General | LHO H1 OMC installation photos |
LHO OMC installation photos
|
179
|
Fri Feb 28 19:50:11 2014 |
Koji | General | General | Misalignment ABCD matrix for the aLIGO OMC |
Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.
The angles and displacement of the mirrors and beams are defined in the attached figure.
x1 = 0.893134 α + 1.10676 β + 1.32252 γ + 1.24619 δ
𝛳1 = 0.75864 α - 0.75864 β - 0.271075 γ + 0.271075 δ
x2 = 1.10676 α + 0.893134 β + 1.24619 γ + 1.32252 δ
𝛳2 = 0.75864 α + 1.24136 β - 0.271075 γ + 0.271075 δ
x3 = 1.32252 α + 1.24619 β + 1.1691 γ + 1.39962 δ
𝛳3 = -0.271075 α + 0.271075 β + 0.818668 γ - 0.818668 δ
x4 = 1.24619 α + 1.32252 β + 1.39962 γ + 1.1691 δ
𝛳4 = -1.24136 α - 0.75864 β - 0.271075 γ + 0.271075 δ
Assuming the flat mirrors are fixed:
If I want to move the x3 mirror up by 1mm without moving x4, the solution is
γ = -0.00197 mrad
δ = +0.00236 mrad
This yields:
x1 = +0.33mm, x2=+0.66mm, x3 = +1mm, x4 = 0mm |
180
|
Mon Mar 3 02:46:21 2014 |
Koji | General | Characterization | Spot positions scanned |
Spot positions on CM1 and CM2 scanned according to the recipes provided by the previous entry.
The best result obtained was:
Transmission from FM2: 32.7mW
Incident on BS1: 34.4mW
Reflection (Unlocked): 5.99V
Reflection (Locked): 104mV
Reflection (Dark): -7.5mV
to accomodate the spot on BS1 it had to be about a mm moved from the template.
This gives us:
- Portion of the TEM00 carrier: R = 1-(104+7.5)/(5990+7.5) = 0.981
- Raw transmission: 32.7/34.4 = 0.950
- TEM00 transmission 0.950/R = 0.969
- Excluding the transmission of BS1: 0.969/0.9926 = 0.976
=> loss per mirror ~40ppm
|
190
|
Tue Jun 24 18:43:15 2014 |
Koji | General | General | ICS entries for the OMC baking/assembly |
For baking:
- Assembly Name aLIGO Output Mode Cleaner
Assembly Number D1201439
- Part Name: Breadboard transport fixture
Part # / Drawing #: D1201515
TO BE ADDED TO THE ASSEMBLY after the bake: [DONE]
803-003-07M6-4PN-598A-0-Bulk-H42Q001
D1201274-V1-00-S009: OMC DCPD Housing (remove part)
D1201274-V1-00-S010: OMC DCPD Housing (remove part)
D1201275-V1-00-0006: OMC DCPD FACE PLATE (remove part)
D1201275-V1-00-0007: OMC DCPD FACE PLATE (remove part)
D1201280-V1-00-0006: OMC QPD HOUSING (remove part)
D1201280-V1-00-0007: OMC QPD HOUSING (remove part)
D1201281-V1-00-0006: OMC QPD FACE PLATE (remove part)
D1201281-V1-00-0007: OMC QPD FACE PLATE (remove part)
D1300052-V1-00-0003: aLIGO OMC BRACKET, CABLE CONNECTOR (remove part)
D1300057-v2-00-0021: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0022: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0023: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0024: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0025: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0026: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0027: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0028: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0029: aLIGO CABLE PEG (remove part)
D1300057-v2-00-0030: aLIGO CABLE PEG (remove part)
D1300060-V1-00-0005: aLIGO OMC BRACKET, MASS MOUNTING (remove part)
D1300060-V1-00-0006: aLIGO OMC BRACKET, MASS MOUNTING (remove part)
====================================
More entries to be added (Found in the LHO OMC entry) [DONE]
D1300371-V2-00-S1301806: ISC DCPD Cable for OMC-Breadboard Bracket to DCPD #1
D1300372-V2-00-S1301807: ISC DCPD Cable for OMC-Breadboard Bracket to DCPD #2
D1300373-V3-00-S1301810: ISC QPD Cable for OMC-Structure to Breadboard Bracket
D1300374-V2-00-S1301813: ISC QPD Cable for OMC-Breadboard Bracket to QPD #1 |
191
|
Fri Jun 27 12:29:50 2014 |
Koji | General | General | OMC baking |
The OMC went into the oven at around 2PM on Thursday. It will be baked at 80degC for 48 hours.
The RGA result will be obtained on Monday.
Link to the ICS entry

|
192
|
Fri Jun 27 18:51:33 2014 |
Koji | General | General | Supply |
PTOUCH TAPE (12mm white) x 2
9V batteries |
193
|
Wed Jul 2 16:41:43 2014 |
Koji | General | General | OMC baking |
OMC is back from the oven today.
To Do:
Optical tests
- Cleaning
- Power Budget
- FSR measurement
- TMS measurement
- TMS measurement (with DC voltage on PZTs)
- PZT DC response
- PZT AC response
- QPD alignment
- DCPD alignment
- First Contact
Backscattering test
Cabling / Wiring
- Attaching cable/mass platforms
- PZT cabling
- DCPD cabling
- QPD cabling
Vibration test
Packing / Shipping |
194
|
Wed Jul 2 18:58:42 2014 |
Koji | General | General | Beam dump delamination |
While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).
The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2
epoxy without glass beads for bond lining. The disk is bonded on the fused silica bread board with Optocast UV low-viscous epoxy.
The delamination is about 70% of the bonded area. They don't seem to fall off immediately. But the glass pieces are not completely secure.
(i.e. finger touch can change the newton ring fringes) So there might be some risk of falling off during transportation.
The engineering team and I are exploring the way to secure them in-situ, including the method to apply UV epoxy with capillary action.
|
195
|
Thu Jul 3 17:45:18 2014 |
Koji | General | General | Beam dump delamination |
Here is the resolution.
I'll apply fillets of EP30-2 along the edges of the black glass (See figure).
In order to allow the air escape from the gap, the inside of the V will not be painted.
In any case, I don't have a good access to the interior of the V.
Dennis assured that the outgassing level will be ok even if the EP30-2 is cured at the room temp if the mixture is good.
But just in case, we should run an RGA scan (after 50degC for 24hour vac bake).
I prefer to do this RGA scan right after all of the test and cabling and right before the shipment.
Dennis is checking if we can even waive the RGA scan owing to the small volume of the glue.

|
200
|
Mon Jul 7 01:36:03 2014 |
Koji | General | General | To Do |
Optical tests
Cleaning
Power Budget
FSR measurement
TMS measurement
TMS measurement (with DC voltage on PZTs)
- PZT DC response
- PZT AC response
- QPD alignment
- DCPD alignment
Backscattering test
Cabling / Wiring
- Attaching cable/mass platforms
- PZT cabling
- DCPD cabling
- QPD cabling
Vibration test
Baking
First Contact
Packing / Shipping |
201
|
Tue Jul 8 04:08:06 2014 |
Koji | General | General | Expoxy reapplication for beam dumps |
Firstly, the excess epoxy was removed using a cleaned razor balde
Secondly, EP30-2 epoxy was applied at the exterior edges of the beam dump.
Interior of the V were glued at two points. This is to keep the gap away from being trapped
Here is the result of the gluing. Some epoxy was sucked into the gap by capillary action.
I believe, most of the rigidity is proivded by the bonds at the edges.
|
204
|
Thu Jul 10 08:34:57 2014 |
Koji | General | General | To Do |
Optical tests
Cleaning
Power Budget
FSR measurement
TMS measurement
TMS measurement (with DC voltage on PZTs)
PZT DC response
PZT AC response
QPD alignment
DCPD alignment
Backscattering test
Cabling / Wiring
Attaching cable/mass platforms
PZT cabling
- DCPD cabling (to be done at LHO)
- QPD cabling (to be done at LHO)
Vibration test
Baking
First Contact
Packing / Shipping |
212
|
Sun Jul 20 17:20:39 2014 |
Koji | General | General | The 3rd (LIO) OMC was shipped out to LHO |
The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.
At LHO
- All of the on-breadboard cables should be attached and tied down.
- Peel First Contact paint and pack the OMC for storage.
|
214
|
Thu Jul 31 15:07:53 2014 |
Koji | General | General | Item lending |
Tara: Laser Safety goggle -> Returned
Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump
Dmass:
LB1005 Oct 24.
|
215
|
Mon Aug 4 18:59:50 2014 |
Koji | General | General | A memorandom |
On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
D1300374 - S1301813
D1300375 - S1301815 |
216
|
Tue Aug 5 13:03:25 2014 |
Koji | General | General | Missing cable components |
DCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER #2-56 x .25 FHCS
Spare DCPD |
219
|
Sat Jan 17 11:40:04 2015 |
Koji | General | General | 3rd OMC completed |
Jan 15, 2015 3rd OMC completed
The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
Firct Contact coating removed
Note on the 3rd OMC
Before the 3rdOMC is actually used,
- First Contact should be applied again for preventing contamination during the installation
- DCPD glass windows should be removed |
220
|
Fri Jan 30 19:31:08 2015 |
Koji | General | General | Item lending |
Gabriele:
PZT HV Amp
Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)Returned March 23, 2016
Black glass beam dump
Dmass:
LB1005 Oct 24. This unit is permanently gone to Cryo lab. Acquired a new unit. Aug, 2016.
Quote: |
Tara: Laser Safety goggle -> Returned
Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump
Dmass:
LB1005 Oct 24.
|
|
221
|
Tue Feb 3 18:23:49 2015 |
Koji | General | General | Item lending |
- The laser was removed and shipped to LHO today.
- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.
Quote: |
Gabriele:
PZT HV Amp
Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump
Dmass:
LB1005 Oct 24.
Quote: |
Tara: Laser Safety goggle -> Returned
Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump
Dmass:
LB1005 Oct 24.
|
|
|
222
|
Wed Feb 4 20:07:24 2015 |
Koji | General | General | Item lending |
Shipment to MIT (L. Barsotti, J. Miller)
1. UV Illuminator (LESCO Super Spot MK III)
2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140
3. UV protection face shield (VWR UVC-803) Qty.2 Caltech property C30141/C30142
4. UV Fiber Optic Light Guide (American Ultraviolet OLB1081) C30143
All returned: Aug 30, 2016 |
223
|
Wed Feb 18 21:51:23 2015 |
Koji | General | General | Notes on OMC Transportation Fixtures & Pelican |
LLO has one empty OMC transportation fixture.
LHO has one empty OMC transportation fixture.
LHO has one OMC transportation fixture with 3IFO OMC in it.
LHO has the Pelican trunk for the OMC transportation. Last time it was in the lab next to the optics lab. |
226
|
Tue Jul 21 20:20:12 2015 |
Koji | General | General | Item lending |
Kate (ATF)
- 4ch color oscilloscope (Tektronix)
- Chopper controller
- Chopper with a rotating disk
|
248
|
Fri Dec 18 15:33:24 2015 |
Koji | General | Loan / Lending | Loan from Rich |
Loan Record: I borrowed a PD can opener from Rich => Antonio Returned Sep 9, 2016
Tungsten Carbide Engraver (permanently given to the OMC lab)
KEITHLEY SOURCE METER + Laptop |