  126   Mon May 13 15:00:23 2013 KojiGeneralGeneralCurrent most reliable OMC schedule
May
Tue 14th The OMC given to Bob (Air bake & Vac bake)

Mon 20th The OMC received from Bob
         Apply First contact
         Diode mount adjustment / Electronic tests
Tue 21st Diode mount adjustment / Electronic tests / Optical tests
Wed 22nd Final cabling (***Chub***)
Thu 23rd Final cabling / Packing
Fri 24th Packing / Shipping

Mon 27th? Arrival to LLO / Koji fly to LLO
Tue 28th Test on the optical bench
Wed 29th Test on the optical bench
Thu 30th Suspension test? (***Jeff B***)

June
Tue  4th Suspension test done?
  128   Mon May 20 14:59:21 2013 KojiGeneralGeneralOMC is out from the oven

The OMC came back to the table again.

No obvious change is visible: no crack, no delamination

The OMC was fixed on the table and the beam was aligned to the cavity

  129   Tue May 21 18:28:08 2013 KojiGeneralGeneralCurrent most reliable OMC schedule

- The wrong Mighty Mouse connectors for the PZT wires were prepared. The correct ones are in the vacuum oven till Tuesday morning.

- The thread holes for the cable pegs are 1/4-20 rather than 10-24.  This requires re-machining of the cable pegs & the C&B.

- We are waiting for the fast shipment of the from LHO

 

May
Thu 23rd Diode mount adjustment / Optical tests
Fri 24th Optical tests
Tue 28th Mighty mouse connector available / Diode mounting finalization
Wed 29th final check
Thu 30th shipment
Fri 31th

June
Mon  3rd ? Arrival to LLO / Koji fly to LLO
Tue  4th Suspension test done?
  136   Mon Jun 3 21:19:03 2013 KojiGeneralGeneralPlanning

Monday - Evening
(Koji)
[done] - DCPD alignment
[done] - DCPD test & through-put measurement
[done] - Power dependence test
[done] - Apply Protective First Contact Layer on the optic surfaces
[done] - Wiping the OMC

Tuesday - Morning
(Chub)
[done] - Bring the cable from the oven

Tuesday - Afternoon
(Chub/Jeff)
[done] - Cabling of the OMC

Wednesday - Morning
(Jeff/Koji)
[done] - Cable tying down
[done] - Screw tightening for the PDs
[done] - Wrapping / Packing
[done] - Weighting? (65lb for everything)

(Jeff/George)
[done] - Shipping? (or Wednesday)

Items to be shipped together
v - OMC cables between the cable harness to the suspension
v - 1 PZT cable pin
v - DCPD preamp kit
v - toruqe driver & bits
v - kapton sheet/tube
v - Test PD cables
v - Spare diodes
v - QPD amp circuits (just in case)
v - 1GHz PD / Power supply banana-PD cable / 1GHz PD cables

[done] - Installation scheduling with Peter/Brian/(Mike?)
- Travel plan
[done] Koji goes LLO immediately (possible?) 6/6-6/22
  Jeff goes LLO next week?

(Koji)
[done] - Room cleaning

--------------------------
Optical testing plan

Day 0
- Freight and Koji moving

Day 1 Arrival (Thursday or Friday)
- Inspect the shock detector
- Unpacking
- Check the condition of the breadboard
- Place the transportation fixture on the table
- Removing the First Contact layers
- Locking
- Mode matching

Day 2
- Transmission measurement
- Power dependence test
- PD installation / (diode can opening, optional)
- (PD realign, optional)
- diode test

Day 3
- Power dependence test

---------------------------
OMC installation plan

TBD

---------------------------
OMCS installation plan

TBD

---------------------------
Documents

- OMC Hazard analysis (done)
- OMCS Hazard analysis (done)
- OMC instllation procedure
- OMCS instllation procedure
- Work permits

cf. previous documents: E080024, E1300201

---------------------------

---------------------------
Misc
- LIGO access card
controls@lloisc0-work:~$ 2.23-5mW T
2.23-5mW: command not found
controls@lloisc0-work:~$ 2.17 \pm 0.01 R
2.17: command not found
controls@lloisc0-work:~$ 67-68mV inlock
67-68mV: command not found
controls@lloisc0-work:~$ 973mV unlock
973mV: command not found
controls@lloisc0-work:~$ Pin 5.47+-0.014.4
No command 'Pin' found, did you mean:

 

  137   Wed Jun 5 01:06:35 2013 ZachGeneralCharacterizationL1 OMC as-built diagram

 D1300507

 L1OMC_asbuilt.pdf

  138   Wed Jun 5 18:19:51 2013 KojiGeneralGeneralSome recent photos from the OMC final test at CIT

Applying First Contact for the optics cleaning


PD alignment / scattering photos

Cabling

Cabling (final) 

  139   Wed Jun 5 18:51:31 2013 KojiGeneralGeneralL1 OMC shipped out

[Koji, Jeff]

The L1 OMC finally sent out from Caltech!

CAM00011.jpg   P6054027.JPG

  140   Fri Jun 7 16:04:44 2013 KojiGeneralGeneral[LLO] OMC arrived

[Koji Zach Suresh]

The OMC arrived at LLO without any destruction!

  • We found that one shock sensor on the box turned red, the other stayed white.
  • We brought the Perican case to the changing room and the wrapping was opened in the optics lab.
  • The OMC was discovered without any obvious damage. Successful shipment!
  • The inspection with a halogen light indicated some amount of particules on the breadboard.
    The both sides of the breadboard were wiped with the cleanroom cloth.
  • The First Contact layers on the optics were removed while the ionized nitrogen gas was brew.

 

  141   Mon Jun 10 10:04:37 2013 KojiGeneralGeneral[LLO] OMC Test

[Koji Zach]

We worked on the OMC test over the weekend.

- At the beginning, the measured OMC transmission was ~85% even after subtracting the junk light and sidebands from the calculation.

- A pretty visible (by eye) dust were on CM1. Also a small residue of First Contact was found on the same mirror.

- We applied FC only on CM1 to remove these.

- The measued transmission went up to the level of 96%.

- We swept the incident power from 0.3mW to 30mW in order to see the dependence of the transmission against the incident power.

- The variation of the transmission ~10% was observed (attached figure 1, Red). This was compared with the similar dependence measured at Caltech (Magenta)

- So, the reduction of the transmission was observed as in eLIGO, although the measurements at Caltech and LLO are not consistent.

- Can this be attributed to the dependence of the PD efficiency? We measured the incident power on the PDs together with the preamp DC output. (Figure.2)
  This gives us how the responsivity changes with the incident power.

- Nevertheless, the dependence remains. We'll make more accurate measurement today.

  142   Thu Jun 13 12:04:57 2013 KojiGeneralGeneral[LLO] OMC Optical Test - completed

https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373

  143   Thu Jun 13 12:12:20 2013 ZachGeneralGeneral[LLO] OMC and OMCS in LVEA

https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395

  144   Fri Jun 14 06:35:21 2013 JeffGeneralGeneral[LLO] L1 OMC status

https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410

Weights:

Suspension cage and transportation box: 250.8lb
Suspension cage and transportation box: 150.2lb ==> 100.6lb ==> 45,630 g

Metal Breadboard: 7261 g

Glass Breadboard and transportation fixture: 16382 g
Transportation fixture only: 9432 g ==> 6950 g
Added mass (up to now): 300 g ==> 7250 g

Preamp arrangement

preamp_arrangement.png 

  146   Tue Jun 18 15:45:38 2013 KojiGeneralGeneral[LLO] OMC installation in HAM6

OMC installed in HAM6!
https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7486

 

  147   Fri Jun 28 12:20:49 2013 KojiGeneralGeneralDmass's loan of Thorlabs HV amp

http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799

(KA: Returned upon H1OMC building)

  149   Fri Aug 9 10:09:56 2013 KojiGeneralGeneralPZT Assembly #3/#4

Yesterday, Jeff and I bonded the PZT assemblies (#3/#4).
The attached is the arrangement of the components

  150   Mon Aug 12 20:22:19 2013 KojiGeneralGeneralPZT Assembly #5/#6

PZT Assembly #5/#6 were glued on Fri Aug 9th

They are removed from the fixture on Mon Aug 12th.

All of the four PZT assemblies were moved to the OMC lab.

  153   Fri Aug 16 17:21:38 2013 KojiGeneralGeneral[OMC002] Build started

[Jeff Koji]

The breadboard (SN2) was loaded on the transportation fixture.

The laser side template was installed and the cavity mirrors were placed.

The laser beam will be resonated in the cavity next week.

  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluing

The Invar Mounting Blocks were glued on the breadboard.

Serial number #1/2/5/6/7/8 -> I1 OMC cable side

Serial number #9/10/11/12 -> H1 OMC cavity side

  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed

[Koji Jeff]

H1 OMC All Gluing completed

5 Glue H1 beam dumps (UV)

4 glass wire brackets glued on the H1 topside (UV) SN: #9/10/11/12

6 Invar blocks glued on the H1 topside (EP30) SN: #13/14/15/16/18/19

  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.

[Koji, Jeff]

We moved the H1OMC to the bake lab.

Chub set up the vacuum bake oven (Oven F) and running without the actual OMC.

We use low temperature (55degC) for the baking.

The actual OMC will be baked from tomorrow afternooon.

  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping

[Koji Jeff]

In order to prepare for the splinkler installation on the HEPA enclosure, the table with the optics was wrapped with Ameristat sheets.

  168   Fri Sep 13 15:09:20 2013 KojiGeneralGeneralSprinkler installation: done

A sprinkler head was installed on the HEPA enclosure. The head is covered with a plastic cap.

  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling

[Chub, Jeff, Koji]

We worked on the wiring and routing of the cables.

- The cables for the PZT was installed first.

- Pins for the mighty mouse connector were crimped on the PZT wires

- Checked the wiring diagram (D1300589) to find the pinouts.
  Pin1 of the mighty mouse is connected to PZT2+, Pin2 to PZT2-, PIn3 to PZT1+, and Pin4 to PZT1-

- Then QPD and PD cables are fixed on the cable harness.

- The QPD/PD cables are attached on the diode housings.

During this process one of the DCPD mounts moved. The fixing screws were not torqued enough.
This means that all of the FC layers need to be removed and the DCPD housing should be aligned again.

- We continued on the cabling. The cables were routed on the top (cable) side.

- Some of the cable pegs were tightened by PEEK cable ties.

- We found that Pin1 and Pin2 of the PZT cables were not intact anymore.

- We ask Chub to work on the PZT pins tomorrow. The PD alignment will be taken tonight or tomorrow.

  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignment

DCPD2 got misaligned during the cable installation. The PD alignment procedure have been gone through again.

Cavity locking

- Removed the FC layers for the cavity related mirrors.

- Aligned and locked the cavity.

PD alignment

- Loosen DCPD2. Checked the reflection with a IR card. Checked the spot on the PD with an IR viewer.

- Finger-tight the screws. Check the reflection with the card again. Check the pot on the PD with a CCD.

- If the spot positions are not satisfactory repeat the process.

- If the spot positions are satisfactory, take pictures of the CCD image.

- Fixing screws for all of the PDs/QPDs were tighten by the torque driver with a torque od 1.75 inch lb.

PD QE measurements

- Measure the power incident on the PDs.

- Set up the transimpedance amp to check the photo current.

- PD1 (T side) 9.10+/-0.03 V 13.02 +/- 0.01W -> QE ~80%

- PD2 (R side) 8.70+/-0.01 V 12.53 +/- 0.01W -> QE ~80%

- These are not strange values considering the presence of the glass caps.

PZT polarity check

- The connections between the PZT electrodes and the pins were checked.

- The positive side is marked by a knot on the wire.

FC painting

- The new FC bottle was brought from Downs, thanks to Margot.

 

  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC Packed

H1OMC PZT connector was replaced with the correct one. This was the final step for H1OMC.

Jeff and I packed the OMC and put it in the perikan case. It will be shipped tomorrow.

The other tools are also packed in the other box. Here is the list of the items

- Spare PD/QPDs (2 cages)
- Test PD/QPD cables
- Torque driver / bits
- Low noise transimpedance amp
- Kapton sheets
- First Contact kit
- 1/4-20 Screws for the balance weights
- OMC-Structure cables
- Preamp adapter plate
- Screws for the cable mounts
- Clean tools
  (scissors, tweezers, forceps, Diagonal pliers, long nose prier)
- Spare Peek cable ties
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangement

Checked the PZT arrangement: Mighty Mouse Pin1&2 -> PZT2 (DCPD side), Mighty Mouse Pin3&4 -> PZT1 (QPD side)

DCPD response:
Illuminate DCPD1 (T) -> DCPD B responded in MEDM
Illuminate DCPD2 (R) -> DCPD A responded in MEDM

QPD response:
Illuminate QPD1 -> QPD A responded in MEDM
Illuminate QPD2 -> QPD B responded in MEDM

--------

DCPD1 (T) is marked as "A". This PD is SN"0288"

DCPD2 (R) is marked as "B". This PD is SN"0721"

Corresponding iLOG for the performance

  177   Tue Dec 10 16:41:51 2013 KojiGeneralGeneralTo Buy

Masks / Wipes => done

  178   Tue Feb 18 18:58:38 2014 KojiGeneralGeneralLHO H1 OMC installation photos

LHO OMC installation photos

  179   Fri Feb 28 19:50:11 2014 KojiGeneralGeneralMisalignment ABCD matrix for the aLIGO OMC

Relationship between mirror misalignment and cavity mode shift was calculated.
The technique described in T0900647 by Sam Waldman was used.

The angles and displacement of the mirrors and beams are defined in the attached figure.

x1 = 0.893134 α + 1.10676 β + 1.32252 γ + 1.24619 δ
𝛳1 = 0.75864 α - 0.75864 β - 0.271075 γ + 0.271075 δ

x2 = 1.10676 α + 0.893134 β + 1.24619 γ + 1.32252 δ
𝛳2 = 0.75864 α + 1.24136 β - 0.271075 γ + 0.271075 δ

x3 = 1.32252 α + 1.24619 β + 1.1691 γ + 1.39962 δ
𝛳3 = -0.271075 α + 0.271075 β + 0.818668 γ - 0.818668 δ

x4 = 1.24619 α + 1.32252 β + 1.39962 γ + 1.1691 δ
𝛳4 = -1.24136 α - 0.75864 β - 0.271075 γ + 0.271075 δ

Assuming the flat mirrors are fixed:
If I want to move the x3 mirror up by 1mm without moving x4, the solution is
γ = -0.00197 mrad
δ = +0.00236 mrad

This yields:
x1 = +0.33mm, x2=+0.66mm, x3 = +1mm, x4 = 0mm

  180   Mon Mar 3 02:46:21 2014 KojiGeneralCharacterizationSpot positions scanned

Spot positions on CM1 and CM2 scanned according to the recipes provided by the previous entry.

The best result obtained was:

Transmission from FM2: 32.7mW
Incident on BS1: 34.4mW

Reflection (Unlocked): 5.99V
Reflection (Locked): 104mV
Reflection (Dark): -7.5mV

to accomodate the spot on BS1 it had to be about a mm moved from the template.

This gives us:
- Portion of the TEM00 carrier: R = 1-(104+7.5)/(5990+7.5) = 0.981
- Raw transmission: 32.7/34.4 = 0.950
- TEM00 transmission 0.950/R = 0.969
- Excluding the transmission of BS1: 0.969/0.9926 = 0.976
  => loss per mirror ~40ppm

 

  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assembly

For baking:

  • Assembly Name aLIGO Output Mode Cleaner
    Assembly Number D1201439
     
  • Part Name: Breadboard transport fixture
    Part # / Drawing #: D1201515
     

TO BE ADDED TO THE ASSEMBLY after the bake: [DONE]
803-003-07M6-4PN-598A-0-Bulk-H42Q001
D1201274-V1-00-S009: OMC DCPD Housing        (remove part)
D1201274-V1-00-S010: OMC DCPD Housing        (remove part)
D1201275-V1-00-0006: OMC DCPD FACE PLATE        (remove part)
D1201275-V1-00-0007: OMC DCPD FACE PLATE        (remove part)
D1201280-V1-00-0006: OMC QPD HOUSING        (remove part)
D1201280-V1-00-0007: OMC QPD HOUSING        (remove part)
D1201281-V1-00-0006: OMC QPD FACE PLATE        (remove part)
D1201281-V1-00-0007: OMC QPD FACE PLATE        (remove part)
D1300052-V1-00-0003: aLIGO OMC BRACKET, CABLE CONNECTOR        (remove part)
D1300057-v2-00-0021: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0022: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0023: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0024: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0025: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0026: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0027: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0028: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0029: aLIGO CABLE PEG        (remove part)
D1300057-v2-00-0030: aLIGO CABLE PEG        (remove part)
D1300060-V1-00-0005: aLIGO OMC BRACKET, MASS MOUNTING        (remove part)
D1300060-V1-00-0006: aLIGO OMC BRACKET, MASS MOUNTING        (remove part)


====================================
More entries to be added (Found in the LHO OMC entry) [DONE]
D1300371-V2-00-S1301806: ISC DCPD Cable for OMC-Breadboard Bracket to DCPD #1
D1300372-V2-00-S1301807: ISC DCPD Cable for OMC-Breadboard Bracket to DCPD #2
D1300373-V3-00-S1301810: ISC QPD Cable for OMC-Structure to Breadboard Bracket
D1300374-V2-00-S1301813: ISC QPD Cable for OMC-Breadboard Bracket to QPD #1

  191   Fri Jun 27 12:29:50 2014 KojiGeneralGeneralOMC baking

The OMC went into the oven at around 2PM on Thursday. It will be baked at 80degC for 48 hours.
The RGA result will be obtained on Monday.

Link to the ICS entry

P6266536.jpg

  192   Fri Jun 27 18:51:33 2014 KojiGeneralGeneralSupply

PTOUCH TAPE (12mm white) x 2

9V batteries

  193   Wed Jul 2 16:41:43 2014 KojiGeneralGeneralOMC baking

OMC is back from the oven today.

To Do:

Optical tests

  • Cleaning
  • Power Budget
  • FSR measurement
  • TMS measurement
  • TMS measurement (with DC voltage on PZTs)
  • PZT DC response
  • PZT AC response
  • QPD alignment
  • DCPD alignment
  • First Contact

Backscattering test

Cabling / Wiring

  • Attaching cable/mass platforms
  • PZT cabling
  • DCPD cabling
  • QPD cabling

Vibration test

Packing / Shipping

  194   Wed Jul 2 18:58:42 2014 KojiGeneralGeneralBeam dump delamination

While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).

The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2
epoxy without glass beads for bond lining. The disk is bonded on the fused silica bread board with Optocast UV low-viscous epoxy.
The delamination is about 70% of the bonded area. They don't seem to fall off immediately. But the glass pieces are not completely secure.
(i.e. finger touch can change the newton ring fringes) So there might be some risk of falling off during transportation.

The engineering team and I are exploring the way to secure them in-situ, including the method to apply UV epoxy with capillary action.

  195   Thu Jul 3 17:45:18 2014 KojiGeneralGeneralBeam dump delamination

Here is the resolution.

I'll apply fillets of EP30-2 along the edges of the black glass (See figure).
In order to allow the air escape from the gap, the inside of the V will not be painted.
In any case, I don't have a good access to the interior of the V.

Dennis assured that the outgassing level will be ok even if the EP30-2 is cured at the room temp if the mixture is good.
But just in case, we should run an RGA scan (after 50degC for 24hour vac bake).
I prefer to do this RGA scan right after all of the test and cabling and right before the shipment.
Dennis is checking if we can even waive the RGA scan owing to the small volume of the glue.

beamdump_delamination_solution.png

  200   Mon Jul 7 01:36:03 2014 KojiGeneralGeneralTo Do

Optical tests

  • Cleaning
  • Power Budget
  • FSR measurement
  • TMS measurement
  • TMS measurement (with DC voltage on PZTs)
  • PZT DC response
  • PZT AC response
  • QPD alignment
  • DCPD alignment

Backscattering test

Cabling / Wiring

  • Attaching cable/mass platforms
  • PZT cabling
  • DCPD cabling
  • QPD cabling

Vibration test

Baking

First Contact

Packing / Shipping

  201   Tue Jul 8 04:08:06 2014 KojiGeneralGeneralExpoxy reapplication for beam dumps

Firstly, the excess epoxy was removed using a cleaned razor balde

Secondly, EP30-2 epoxy was applied at the exterior edges of the beam dump.
Interior of the V were glued at two points. This is to keep the gap away from being trapped

Here is the result of the gluing. Some epoxy was sucked into the gap by capillary action.
I believe, most of the rigidity is proivded by the bonds at the edges.

  204   Thu Jul 10 08:34:57 2014 KojiGeneralGeneralTo Do

Optical tests

  • Cleaning
  • Power Budget
  • FSR measurement
  • TMS measurement
  • TMS measurement (with DC voltage on PZTs)
  • PZT DC response
  • PZT AC response
  • QPD alignment
  • DCPD alignment

Backscattering test

Cabling / Wiring

  • Attaching cable/mass platforms
  • PZT cabling
  • DCPD cabling (to be done at LHO)
  • QPD cabling (to be done at LHO)

Vibration test

Baking

First Contact

Packing / Shipping

  212   Sun Jul 20 17:20:39 2014 KojiGeneralGeneralThe 3rd (LIO) OMC was shipped out to LHO

The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.

At LHO

- All of the on-breadboard cables should be attached and tied down.

- Peel First Contact paint and pack the OMC for storage.

 

  214   Thu Jul 31 15:07:53 2014 KojiGeneralGeneralItem lending

Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump

Dmass:

LB1005 Oct 24.

  215   Mon Aug 4 18:59:50 2014 KojiGeneralGeneralA memorandom

On breadboarfd cabling for 3IFO OMC

D1300371 - S1301806
D1300372 - S1301808
D1300374 - S1301813
D1300375 - S1301815

  216   Tue Aug 5 13:03:25 2014 KojiGeneralGeneralMissing cable components

DCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282

PD faster: 92210A07 Qty 4: MCMASTER #2-56 x .25 FHCS

Spare DCPD

  219   Sat Jan 17 11:40:04 2015 KojiGeneralGeneral3rd OMC completed

Jan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
Firct Contact coating removed

Note on the 3rd OMC

Before the 3rdOMC is actually used,

- First Contact should be applied again for preventing contamination during the installation

- DCPD glass windows should be removed

  220   Fri Jan 30 19:31:08 2015 KojiGeneralGeneralItem lending

Gabriele:

PZT HV Amp

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)Returned March 23, 2016
Black glass beam dump

Dmass:

LB1005 Oct 24. This unit is permanently gone to Cryo lab. Acquired a new unit. Aug, 2016.

Quote:

Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump

Dmass:

LB1005 Oct 24.

 

  221   Tue Feb 3 18:23:49 2015 KojiGeneralGeneralItem lending

- The laser was removed and shipped to LHO today.

- UV illuminator / fused silica fiber light guide / UV power meter / UV face shield (Qty 2) will be shipped to MIT.
They are CIT properties except for the illuminator.

Quote:

Gabriele:

PZT HV Amp

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump

Dmass:

LB1005 Oct 24.

Quote:

Tara: Laser Safety goggle -> Returned

Evan:
HP signal generator (990MHz) (prev. setting 32.7MHz / +3dBm)
Black glass beam dump

Dmass:

LB1005 Oct 24.

 

 

  222   Wed Feb 4 20:07:24 2015 KojiGeneralGeneralItem lending

Shipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super Spot MK III)

2. UV Power meter (American Ultraviolet AIB1001) Caltech property C30140

3. UV protection face shield (VWR UVC-803) Qty.2 Caltech property C30141/C30142

4. UV Fiber Optic Light Guide (American Ultraviolet OLB1081) C30143

All returned: Aug 30, 2016

  223   Wed Feb 18 21:51:23 2015 KojiGeneralGeneralNotes on OMC Transportation Fixtures & Pelican

LLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation fixture.

LHO has one OMC transportation fixture with 3IFO OMC in it.

LHO has the Pelican trunk for the OMC transportation. Last time it was in the lab next to the optics lab.

  226   Tue Jul 21 20:20:12 2015 KojiGeneralGeneralItem lending

Kate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller

- Chopper with a rotating disk

  248   Fri Dec 18 15:33:24 2015 KojiGeneralLoan / LendingLoan from Rich

Loan Record: I borrowed a PD can opener from Rich => Antonio Returned Sep 9, 2016

Tungsten Carbide Engraver (permanently given to the OMC lab)

KEITHLEY SOURCE METER + Laptop

ELOG V3.1.3-