  122   Wed May 8 15:36:50 2013 KojiGeneralGeneralLatest OMC schedule
May
(done) Mon  6th:
Invar plate arrival / Spot position measurement
(done)
Tue  7th: Invar plate cleaning / Spot position
  
  126   Mon May 13 15:00:23 2013 KojiGeneralGeneralCurrent most reliable OMC scheduleMay
Tue 14th The OMC
given to Bob (Air bake & Vac bake)

Mon
20th The OMC received from Bob
        
  
  128   Mon May 20 14:59:21 2013 KojiGeneralGeneralOMC is out from the ovenThe OMC came back to the table again.
No obvious change is visible: no
crack, no delamination
  
  129   Tue May 21 18:28:08 2013 KojiGeneralGeneralCurrent most reliable OMC schedule- The wrong Mighty Mouse connectors for
the PZT wires were prepared. The correct
ones are in the vacuum oven till Tuesday
  
  136   Mon Jun 3 21:19:03 2013 KojiGeneralGeneralPlanningMonday - Evening
(Koji)
[done] - DCPD alignment
  
  137   Wed Jun 5 01:06:35 2013 ZachGeneralCharacterizationL1 OMC as-built diagram D1300507
 
 L1OMC_asbuilt.pdf 
  138   Wed Jun 5 18:19:51 2013 KojiGeneralGeneralSome recent photos from the OMC final test at CITApplying First Contact for the optics cleaning
  
  139   Wed Jun 5 18:51:31 2013 KojiGeneralGeneralL1 OMC shipped out[Koji, Jeff]
The L1 OMC
 CAM00011.jpgP6054027.JPG 
  140   Fri Jun 7 16:04:44 2013 KojiGeneralGeneral[LLO] OMC arrived[Koji Zach Suresh]
The OMC arrived at LLO without any
destruction!
  
  141   Mon Jun 10 10:04:37 2013 KojiGeneralGeneral[LLO] OMC Test[Koji Zach]
We worked on the OMC test over
the weekend.
 OMC_pow_cal.pdfresponsivity.pdfOMC_pow_cal_compensated.pdf 
  142   Thu Jun 13 12:04:57 2013 KojiGeneralGeneral[LLO] OMC Optical Test - completedhttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7373   
  143   Thu Jun 13 12:12:20 2013 ZachGeneralGeneral[LLO] OMC and OMCS in LVEAhttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
  
  144   Fri Jun 14 06:35:21 2013 JeffGeneralGeneral[LLO] L1 OMC statushttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation
 preamp_arrangement.png 
  146   Tue Jun 18 15:45:38 2013 KojiGeneralGeneral[LLO] OMC installation in HAM6OMC installed
in HAM6!
  
  147   Fri Jun 28 12:20:49 2013 KojiGeneralGeneralDmass's loan of Thorlabs HV amphttp://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
  
  149   Fri Aug 9 10:09:56 2013 KojiGeneralGeneralPZT Assembly #3/#4Yesterday, Jeff and I bonded the PZT assemblies
(#3/#4).
The attached is the arrangement of
 PZT_assembly.pdf 
  150   Mon Aug 12 20:22:19 2013 KojiGeneralGeneralPZT Assembly #5/#6PZT Assembly #5/#6 were glued on Fri Aug
9th
They are removed from the fixture
  
  153   Fri Aug 16 17:21:38 2013 KojiGeneralGeneral[OMC002] Build started[Jeff Koji]

The breadboard (SN2) was loaded
on the transportation fixture.
  
  164   Fri Aug 30 12:25:29 2013 KojiGeneralGeneralH1 OMC Invar mount gluingThe Invar Mounting Blocks were glued on
the breadboard.
Serial number #1/2/5/6/7/8 ->
 P8304368.JPGP8304370.JPG 
  165   Tue Sep 3 17:03:25 2013 KojiGeneralGeneralH1 OMC gluing completed[Koji Jeff]
H1 OMC
  
  166   Wed Sep 4 22:22:54 2013 KojiGeneralGeneralH1 OMC wrapped and moved to the bake lab.[Koji, Jeff]
We moved the H1OMC to the bake lab.
Chub set up the vacuum bake oven
  
  167   Sat Sep 7 17:20:56 2013 KojiGeneralGeneralOMC/PD lab optical table wrapping[Koji Jeff]
In order to prepare for the splinkler
installation on the HEPA enclosure, the table
 P9064377.JPG 
  168   Fri Sep 13 15:09:20 2013 KojiGeneralGeneralSprinkler installation: doneA sprinkler head was installed on the HEPA
enclosure. The head is covered with a plastic
cap.
 P9134379.jpgP9134378.jpg 
  173   Tue Oct 22 17:17:59 2013 KojiGeneralGeneralH1OMC cabling[Chub, Jeff, Koji]
We worked on the wiring and routing
of the cables.
  
  174   Wed Oct 23 02:45:07 2013 KojiGeneralGeneralPD realignmentDCPD2 got misaligned during the cable installation.
The PD alignment procedure have been gone
through again.
  
  175   Mon Nov 4 19:43:56 2013 KojiGeneralGeneralH1OMC PackedH1OMC PZT connector was replaced with the
correct one. This was the final step for
H1OMC.
  
  176   Thu Nov 21 00:05:35 2013 KojiGeneralGeneralH1OMC electronics arrangementChecked the PZT arrangement: Mighty Mouse
Pin1&2 -> PZT2 (DCPD side), Mighty
Mouse Pin3&4 -> PZT1 (QPD side)
 H1OMC_cable_arrangement.pdf 
  177   Tue Dec 10 16:41:51 2013 KojiGeneralGeneralTo BuyMasks / Wipes => done   
  178   Tue Feb 18 18:58:38 2014 KojiGeneralGeneralLHO H1 OMC installation photosLHO OMC installation photos
  
  179   Fri Feb 28 19:50:11 2014 KojiGeneralGeneralMisalignment ABCD matrix for the aLIGO OMCRelationship between mirror misalignment
and cavity mode shift was calculated.
The technique described in T0900647
 misalignment.pdf 
  180   Mon Mar 3 02:46:21 2014 KojiGeneralCharacterizationSpot positions scannedSpot positions on CM1 and CM2 scanned according
to the recipes provided by the previous entry.
The best result obtained was:
  
  190   Tue Jun 24 18:43:15 2014 KojiGeneralGeneralICS entries for the OMC baking/assemblyFor baking:

    Assembly Name aLIGO Output
Mode Cleaner
  
  191   Fri Jun 27 12:29:50 2014 KojiGeneralGeneralOMC bakingThe OMC went into the oven at around 2PM
on Thursday. It will be baked at 80degC for
48 hours.
 P6266536.jpg 
  192   Fri Jun 27 18:51:33 2014 KojiGeneralGeneralSupplyPTOUCH TAPE (12mm white) x 2
9V batteries
  
  193   Wed Jul 2 16:41:43 2014 KojiGeneralGeneralOMC bakingOMC is back from the oven today.
To Do:
Optical tests
  
  194   Wed Jul 2 18:58:42 2014 KojiGeneralGeneralBeam dump delaminationWhile the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination.
 beamdump_delamination.png 
  195   Thu Jul 3 17:45:18 2014 KojiGeneralGeneralBeam dump delaminationHere is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure).
 beamdump_delamination_solution.png 
  200   Mon Jul 7 01:36:03 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  201   Tue Jul 8 04:08:06 2014 KojiGeneralGeneralExpoxy reapplication for beam dumpsFirstly, the excess epoxy was removed using
a cleaned razor balde
  
  204   Thu Jul 10 08:34:57 2014 KojiGeneralGeneralTo DoOptical tests

    Cleaning

   Power Budget
  
  212   Sun Jul 20 17:20:39 2014 KojiGeneralGeneralThe 3rd (LIO) OMC was shipped out to LHO The 3rd (LIO) OMC was shipped out to LHO
on Friday (Jul 18) Morning.
At LHO
  
  214   Thu Jul 31 15:07:53 2014 KojiGeneralGeneralItem lendingTara: Laser Safety goggle ->
Returned

Evan:
  
  215   Mon Aug 4 18:59:50 2014 KojiGeneralGeneralA memorandomOn breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
  
  216   Tue Aug 5 13:03:25 2014 KojiGeneralGeneralMissing cable componentsDCPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201276
QPD Connector Face: Qty2 https://dcc.ligo.org/LIGO-D1201282
PD faster: 92210A07 Qty 4: MCMASTER
  
  219   Sat Jan 17 11:40:04 2015 KojiGeneralGeneral3rd OMC completedJan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables
were installed (Helicoils inserted)
  
  220   Fri Jan 30 19:31:08 2015 KojiGeneralGeneralItem lendingGabriele:

PZT HV Amp

Evan:
  
  221   Tue Feb 3 18:23:49 2015 KojiGeneralGeneralItem lending- The laser was removed and shipped to
LHO today.

- UV illuminator / fused silica
  
  222   Wed Feb 4 20:07:24 2015 KojiGeneralGeneralItem lendingShipment to MIT (L. Barsotti, J. Miller)

1. UV Illuminator (LESCO Super
Spot MK III)
 C30140_1.JPGC30140_2.JPGC30141.JPGC30142.JPGC30143.JPG 
  223   Wed Feb 18 21:51:23 2015 KojiGeneralGeneralNotes on OMC Transportation Fixtures & PelicanLLO has one empty OMC transportation fixture.

LHO has one empty OMC transportation
fixture.
  
  226   Tue Jul 21 20:20:12 2015 KojiGeneralGeneralItem lendingKate (ATF)

- 4ch color oscilloscope (Tektronix)

- Chopper controller
  