40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 3 of 11  Not logged in ELOG logo
Entry  Wed Jul 15 22:23:17 2015, Koji, Electronics, AM Stabilized EOM Driver, E1400445 first look IMG_20150714_195534852.jpgIMG_20150714_195227746_HDR.jpg
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
Entry  Tue Dec 15 13:38:34 2015, Koji, Electronics, Characterization, EOM Driver linearity check Output_linearity.pdfCtrl_Bias.pdf
Entry  Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison 
   +  Reply  Wed Jul 4 18:30:51 2018, Koji, Electronics, Characterization, EOM circuit models eom_models.pdfeom9.pdfeom24.pdfeom45.pdf180704_3IFO_EOM_model.zip
Entry  Wed May 30 16:40:38 2018, Koji, Mechanics, Characterization, EOM mount stability test 
Entry  Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status IMG_5217.JPG
   +  Reply  Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG
Entry  Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test 
Entry  Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx
Entry  Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG
   +  Reply  Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps 
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
Entry  Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002 
Entry  Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement finesse_measurements_log.pdf
Entry  Fri Dec 9 13:13:13 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission HOM_plot_PZT.pdfOMC4_spot.pngPXL_20221208_233706115.jpg
   +  Reply  Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial PXL_20221212_235351320.jpgOMC4_spot.pngHOM_plot_PZT.pdfPXL_20221213_000406843.jpgScreen_Shot_2022-12-12_at_19.36.10.png
Entry  Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity  Cav_scan_response_140503_Pitch.pdfCav_scan_response_140503_Yaw.pdf
Entry  Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints 
Entry  Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned beam_profile.pdfmode_matching.pdf
Entry  Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom CircleFit.pdfSineFit.pdf
   +  Reply  Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot 
Entry  Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
   +  Reply  Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
   +  Reply  Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
Entry  Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement Cav_scan_response_zoom_20121125_C6_9.pdf
Entry  Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement wedge_measurement_overall.pdf121108a_A1.pdf
Entry  Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate 
Entry  Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven 
Entry  Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment Gouy_FSR_130827.nb.zipP8284343.jpg
Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
Entry  Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement  
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
Entry  Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing 
Entry  Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget OMC_power_budget.pdf
Entry  Wed Aug 21 08:31:21 2013, Koji, Optics, Characterization, H1 OMC cavity alignment 
Entry  Tue Sep 3 17:03:25 2013, Koji, General, General, H1 OMC gluing completed 
Entry  Wed Sep 4 22:22:54 2013, Koji, General, General, H1 OMC wrapped and moved to the bake lab. 
Entry  Thu Aug 29 02:52:50 2013, Koji, Optics, Characterization, H1OMC Curved Mirror Alignment Cav_scan_response_130828_Pitch.pdfCav_scan_response_130828_Yaw.pdf
Entry  Mon Nov 4 19:43:56 2013, Koji, General, General, H1OMC Packed 
Entry  Fri Aug 30 12:24:28 2013, Koji, Optics, Characterization, H1OMC Spot positions DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Entry  Tue Oct 22 17:17:59 2013, Koji, General, General, H1OMC cabling 
Entry  Thu Nov 21 00:05:35 2013, Koji, General, General, H1OMC electronics arrangement H1OMC_cable_arrangement.pdf
Entry  Mon Jun 24 12:54:58 2019, Koji, Clean, General, HEPA BOOTH 
Entry  Mon Mar 6 12:25:08 2023, Koji, Facility, General, HEPA Enclosure improvement 20230306_081449.jpg20230306_081518.jpg
Entry  Sun Jul 6 03:56:40 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept Cav_scan_response_PZT1.pdfCav_scan_response_PZT2.pdfOMC_HOM_140705.pdf
   +  Reply  Sun Jul 6 08:31:14 2014, Koji, Optics, Characterization, HOM measurement with PZT vol swept HOM_plot.pdf
Entry  Sat Mar 26 01:49:48 2016, Koji, Optics, Characterization, HQEPD QE QE1.pngQE2.png
Entry  Sun Mar 13 22:02:09 2016, Koji, Optics, Characterization, HQEPD QE measurement (direct comaprison) 
ELOG V3.1.3-