40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 2 of 9  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator autocollimator_wedge_measurement.pdf
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
Entry  Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection 
Entry  Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m P2053119.jpgP2053120.JPG
Entry  Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test 
Entry  Thu Feb 21 18:44:18 2013, Koji, Optics, Configuration, Perpendicularity test perpendicularity_test.pdfP2203206.JPG
    Reply  Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test 
       Reply  Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final 
Entry  Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage autocollimator_wedge_measurement.pdf
    Reply  Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
       Reply  Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage 
Entry  Tue Mar 5 19:37:00 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details eOMC_visibility_3_4_13.png
    Reply  Wed Mar 6 23:24:58 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details TEK00005.PNGTEK00007.PNGeOMC_visibility_3_4_13.pngeOMC_AMTF_vs_power_3_6_13.png
Entry  Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG
Entry  Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg
Entry  Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test 
Entry  Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing QPD_GR_TEST_130316.pdf
    Reply  Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD OMCPD_TEST_130317.pdf
Entry  Wed Mar 20 09:38:02 2013, Zach, Optics, Characterization, [LLO] OMC test bench modified new_setup_traced.jpg
Entry  Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered P3233349.jpg
Entry  Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC P3223314.JPGP3223319.jpgP3223320.jpg
Entry  Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued P3223322.jpgP3223323.jpgP3233336.jpgP3233348.jpg
Entry  Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement P3213308.JPGP3213310.JPG
Entry  Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing P3253353.jpgP3253372.jpgP3253394.jpgP3253400.jpg
Entry  Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building 
Entry  Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18 
    Reply  Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon 
       Reply  Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon 
          Reply  Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed 
             Reply  Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu 
Entry  Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints 
Entry  Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration 
Entry  Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface P3283483.JPGP3283459.jpgP3283473.JPG
Entry  Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
Entry  Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test 
Entry  Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built 2013-04-03_23.43.00.jpg
Entry  Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity 
Entry  Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test P4033491.JPGshadow_sensor_calib.pdf
    Reply  Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure shadow_sensor_calib_after_bake.pdfPZTresponse.pdf
Entry  Thu Mar 28 03:37:07 2013, Zach, Optics, Configuration, Test setup input optics progress OMC_test_setup_IO.jpg2013-03-27_05.48.20.jpg2013-03-28_02.29.36.jpg
    Reply  Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber 
       Reply  Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber 
          Reply  Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken Isomet_1250C_zin_4_5_13.png
Entry  Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links 
Entry  Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO 
Entry  Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement PZT_assembly.pdf
Entry  Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned beam_profile.pdfmode_matching.pdf
Entry  Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing 
    Reply  Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures 
Entry  Wed Apr 10 00:40:30 2013, Zach, Optics, Configuration, fauxMC locked fauxMC_labeled.jpg
Entry  Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress 
Entry  Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue) 
Entry  Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued Cav_scan_response_130412_Pitch.pdfCav_scan_response_130412_Yaw.pdf
Entry  Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation 
Entry  Thu Apr 4 01:43:06 2013, Koji, Optics, Characterization, Mirror T measurement 
    Reply  Mon Apr 8 11:11:37 2013, Koji, Optics, Characterization, More Mirror T measurement 
       Reply  Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
          Reply  Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
Entry  Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued 
Entry  Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure 
Entry  Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing 
Entry  Fri May 3 21:09:08 2013, Koji, General, General, OMC is back 
Entry  Mon May 6 19:31:51 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
    Reply  Wed May 8 15:08:57 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts DCPD1.pngDCPD2.pngQPD1.pngQPD2.png
Entry  Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress COMSOL1.png
Entry  Mon May 13 14:49:35 2013, Koji, Mechanics, Characterization, Mounting Glass Bracket still broke with tightenin stress 
Entry  Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing 
Entry  Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking 
Entry  Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven 
ELOG V3.1.3-