OMC elog, Page 2 of 9 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Sat Jan 19 20:47:41 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator
|
Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed
|
Tue Jan 22 17:56:32 2013, Koji, Mechanics, General, Rotary stage selection
|
Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m 
|
Thu Feb 7 23:01:45 2013, Koji, Optics, Characterization, UV epoxy gluing test
|
Thu Feb 21 18:44:18 2013, Koji, Optics, Configuration, Perpendicularity test 
|
Wed Feb 27 18:18:48 2013, Koji, Optics, Configuration, More perpendicularity test
|
Fri Mar 1 23:06:15 2013, Koji, Optics, Configuration, More perpendicularity test final
|
Mon Feb 4 00:39:08 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Wed Feb 6 02:34:10 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Fri Mar 1 23:52:18 2013, Koji, Optics, Characterization, Wedge measurement with the autocollimator and the rotation stage
|
Tue Mar 5 19:37:00 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details
|
Wed Mar 6 23:24:58 2013, Zach, Optics, Characterization, eLIGO OMC visibility vs. power measurement details   
|
Thu Mar 7 15:53:47 2013, Koji, Mechanics, General, OMC Transportation fixture, OMC PD/QPD mounts    
|
Thu Mar 14 17:06:21 2013, Koji, Mechanics, General, OMC SUS work @LLO 
|
Thu Mar 14 22:18:23 2013, Koji, General, General, New loans for the diode test
|
Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing
|
Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD
|
Wed Mar 20 09:38:02 2013, Zach, Optics, Characterization, [LLO] OMC test bench modified
|
Sat Mar 23 02:32:23 2013, Koji, Facility, General, N2 cylinder delivered
|
Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC  
|
Sat Mar 23 13:34:14 2013, Koji, Optics, General, PZT assembly prototype glued   
|
Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement 
|
Mon Mar 25 19:31:16 2013, Koji, Optics, General, OMC Top-side gluing   
|
Tue Mar 26 22:33:07 2013, Koji, General, General, Loan for the OMC building
|
Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18
|
Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon
|
Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon
|
Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed
|
Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu
|
Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints
|
Mon Apr 1 03:23:48 2013, Koji, Optics, General, UV power calibration
|
Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface  
|
Mon Apr 1 18:17:01 2013, Koji, Optics, General, Mirror curvature center test 6x
|
Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test
|
Thu Apr 4 00:35:42 2013, Zach, Optics, Configuration, MMT installed on breadboard, periscope built
|
Thu Apr 4 01:35:04 2013, Koji, Optics, Characterization, Mode matching to the OMC cavity
|
Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test 
|
Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure 
|
Thu Mar 28 03:37:07 2013, Zach, Optics, Configuration, Test setup input optics progress  
|
Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber
|
Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber
|
Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken
|
Mon Apr 8 11:29:08 2013, Koji, Optics, Characterization, Mirror/PZT Characterization links
|
Mon Apr 8 11:49:18 2013, Koji, Mechanics, Characterization, PZT actuator tested at LLO
|
Mon Apr 8 20:56:52 2013, Koji, Optics, Configuration, PZT & Curverd Mirror arrangement
|
Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned 
|
Mon Apr 8 21:11:14 2013, Koji, Optics, General, PZT assembly gluing
|
Tue Apr 9 13:56:09 2013, Koji, Optics, General, PZT assembly post gluing / pre baking pictures
|
Wed Apr 10 00:40:30 2013, Zach, Optics, Configuration, fauxMC locked
|
Thu Apr 11 15:10:22 2013, Koji, General, General, OMC Progress
|
Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue)
|
Sat Apr 13 21:06:02 2013, Koji, Optics, General, OMC Bottom-side: cavity glued 
|
Tue Apr 16 00:40:45 2013, Koji, Optics, General, PD/QPD path gluing ~ preparation
|
Thu Apr 4 01:43:06 2013, Koji, Optics, Characterization, Mirror T measurement
|
Mon Apr 8 11:11:37 2013, Koji, Optics, Characterization, More Mirror T measurement
|
Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement
|
Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement
|
Wed Apr 17 07:30:04 2013, Koji, Optics, General, QPD path glued
|
Thu Apr 18 11:43:59 2013, Koji, General, General, Mounting Glass Bracket Failure
|
Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing
|
Fri May 3 21:09:08 2013, Koji, General, General, OMC is back
|
Mon May 6 19:31:51 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts   
|
Wed May 8 15:08:57 2013, Koji, Optics, Characterization, Spot position measurement on the diode mounts   
|
Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress
|
Mon May 13 14:49:35 2013, Koji, Mechanics, Characterization, Mounting Glass Bracket still broke with tightenin stress
|
Mon May 13 14:59:16 2013, Koji, Mechanics, General, Invar shim gluing
|
Tue May 14 19:06:00 2013, Koji, Clean, General, OMC Baking
|
Mon May 20 14:59:21 2013, Koji, General, General, OMC is out from the oven
|
|