40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 2 of 9  Not logged in ELOG logo
    Reply  Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement PD_cap_meas.pdf20210529013015_IMG_0577.jpeg20210529013114_IMG_0580_2.jpeg20210529013200_IMG_0584.jpeg20210529013229_IMG_0586.jpeg
Attachment 1: System diagram. The reverse bias voltage is controlled by DS335. This can produce a voltage offset up to 10V. A G=+2 opamp
circuit was inserted so that a bias of up to +15V can be produced. The capacitances of the photodiodes were measured with SR720 LCR meter with a probe.
DS335 and SR720 were controlled from PC/Mac via serial connections.
    Reply  Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement highQEPD_capacitance.pdfC30665_capacitance.pdf
Measurement result:

The capacitance at no bias was 460~500pF. This goes down to below 300pF at 1.0~1.5V reverse bias. At maximum +15V, the capacitance goes down
to 200~220pF.
Entry  Mon May 20 19:53:17 2019, Koji, Optics, Configuration, DCPD high power test BIAS.pdfP_20190520_204822.jpg
We want to perform a damage test of OMC DCPDs with high power beam. The OMC DCPD is the 3mm InGaAs photodiodes with high quantum efficiency, delivered
by Laser Components.
The sites want to know the allowed input power during the OMC scan for beam mode analysis. The nominal bias voltage of the PDs is +12V. Therefore,
Entry  Thu Apr 18 11:59:02 2013, Koji, General, General, DCPD path gluing 
[Jeff, Koji]
DCPD path gluing
Usual preparation
Entry  Thu May 23 23:41:48 2013, Koji, Mechanics, General, DCPD/QPD Mount 
DCPD mounts and QPD mounts were attached on the breadboard. They are not aligned yet and loosely fastened.
DCPD (mounting 4-40x5/16 BHCS Qty4)
Entry  Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs Q3000_dark_current.pdf
Dark current measurement for InGaAs QPDs (OSI FCI-InGaAs-Q3000) has been done using Keithley 2450 and Frank's diode test kit. Frank's setup uses
various custom instruments which are no longer exist, therefore the kit was used only for switching between the segments.

The diodes were serialized as 81, 82, 83, 84, continuing the numbering for the OMC QPDs. The numbers are engraved at the side and the back of
Entry  Sat Feb 20 19:11:22 2016, Koji, Electronics, Characterization, Dark current measurement of the HQE PD and other PDs P2197992.jpgPD_dark_current.pdfPD_dark_current_others.pdf
Dark current of the HQE PD and other PDs were measured.

- The HQE PDs were loaded on the new PD transportation cages (Attachment 1)
The PDs are always shorted by a clean PD plugs. The PD element is still capped with Kapton seals.
    Reply  Sun Mar 13 21:22:27 2016, Koji, Electronics, Characterization, Dark current measurement of the HQE PD and other PDs 
Transfered for RGA scan

B4 (C1-05) -> F1
C1 (C1-07) -> F2
Entry  Tue Dec 15 13:42:37 2015, Koji, Optics, Characterization, Dimensions / packaging of HQE PDs PC147842.jpgPC147846.jpgPC147848.jpgHQEPD_dimension.pdf
The dimensions of a high QE PDs was measured as well as the ones for C30665. (Attachment 4, Unit in mm)
They seemed to be very much compatible.


The PDs came with the designated case (Attachment 1). The bottom of the case has a spongy (presumably
Entry  Sat Mar 23 16:36:15 2013, Koji, Electronics, Characterization, Diode QE measurement P3213308.JPGP3213310.JPG
Quantum efficiencies of the C30665GH diodes were measured. 
- The diode was biased by the FEMTO preamplifier.
- Diode Pin 1 Signal, Pin 2 +5V, Pin 3 open
Entry  Fri Mar 15 02:15:45 2013, Koji, Electronics, Characterization, Diode testing QPD_GR_TEST_130316.pdf
Diode testing
o Purpose of the measurement
- Test Si QPDs (C30845EH) for ISC QPDs Qty 30 (i.e. 120 elements)
    Reply  Sun Mar 17 21:59:47 2013, Koji, Electronics, Characterization, Diode testing ~ DCPD OMCPD_TEST_130317.pdf
- For the dark noise measurement, the lid of the die-cast case should also contact to the box for better shielding. This made the 60Hz lines almost completely
removed, although unknown 1kHz harmonics remains.
- The precise impedance of the setup can not be obtained from the measurement box; the cable in between is too long. The diode impedance should
Entry  Wed Sep 18 23:38:52 2019, Stephen, General, General, Dirty ABO ready for PZT Subassembly Bonding index.png
The 40m Bake Lab's Dirty ABO's OMEGA PID controller was borrowed for another oven in the Bake Lab, so I have had to play
with the tuning and parameters to recover a suitable bake profile. This bake is pictured below (please excuse the default excel formatting).
Entry  Thu Sep 26 17:33:52 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding - ABO is Ready! image_showing_20190924_abo_qualifying_bake.png
Follow up on OMC elog 379

I was able to obtain the following (dark blue) bake profile, which I believe is adequate for our needs.

The primary change was a remounting of the thermocouple to sandwich it between two stainless steel masses. The thermocouple bead previously was
Entry  Thu Feb 7 21:35:46 2013, Koji, General, General, Dmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40m P2053119.jpgP2053120.JPG
Dmass borrowed the LB1005 servo amp from the OMC lab.
It happened this week although it seems still January in his head. Got it back on Mar 24th
The A2 and C2 mirrors have been sent to Josh Smith at Fullerton for the scatterometer measurement.
Entry  Fri Jun 28 12:20:49 2013, Koji, General, General, Dmass's loan of Thorlabs HV amp 
http://nodus.ligo.caltech.edu:8080/Cryo_Lab/799
(KA: Returned upon H1OMC building)
Entry  Fri Jun 23 10:55:07 2017, Koji, Optics, General, Dust layer on black glass beam dumps? black_glass_dust.JPG
I wondered why the black glass beam dumps looked not as shiny as before. It was in fact a layer of dusts (or contaminants) accumulated on the surface.
The top part of the internal surface of the black glass was touched by a piece of lens tissue with IPA. The outer surface was already cleaned. IPA
did not work well i.e. Required multiple times of wiping. I tried FirstContact on one of the outer surface and it efficiently worked. So I think the internal
Entry  Wed Jul 15 22:23:17 2015, Koji, Electronics, AM Stabilized EOM Driver, E1400445 first look IMG_20150714_195534852.jpgIMG_20150714_195227746_HDR.jpg
This is not an OMC related and even not happening in the OMC lab (happening at the 40m), but I needed somewhere to elog...


E1400445 first look

LIGO
DCC E1400445
Entry  Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response 
EGE&G 2mm photodiode angle response measured by Sam T1100564-v1
Entry  Tue Dec 15 13:38:34 2015, Koji, Electronics, Characterization, EOM Driver linearity check Output_linearity.pdfCtrl_Bias.pdf
Linearity of the EOM driver was tested. This test has been done on Nov 10, 2015.

- Attachment 1: Output power vs requested power. The output start to deviate from the request above 22dBm request.

- Attachment 2: Ctrl and Bias voltages vs requested power. This bias was measured with the out-of-loop channel.
Entry  Tue May 15 19:53:45 2018, Koji, Optics, General, EOM Q comparison 
Qs' were estimated with a lorentzian function (eye fit)



Current LHO EOM (final version, modulation depth measurement 2018/4/5)
    Reply  Wed Jul 4 18:30:51 2018, Koji, Electronics, Characterization, EOM circuit models eom_models.pdfeom9.pdfeom24.pdfeom45.pdf180704_3IFO_EOM_model.zip
The circuit models for the 3IFO EOM (before mods) were made using LISO.
Then the modification plan was made to make it a new LLO EOM.

Impedance data, LISO model, Mathematica files are zipped and attached at the end.
Entry  Wed May 30 16:40:38 2018, Koji, Mechanics, Characterization, EOM mount stability test 
https://awiki.ligo-wa.caltech.edu/wiki/EOM_Mount_Stability
Entry  Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status IMG_5217.JPG
Here is a summary of the events of the last week, as they relate to EP30-2.

1) I lost the EP30-2 syringes that had been ordered for the OMC, along with the rest of the kit.


Corrective action: Found in the 40m Bake Lab garbing area.
Preventative action: log material moves and locations in the OMC
Entry  Wed Apr 3 18:42:45 2013, Koji, Optics, General, EP30-2 gluing test 
EP30-2 gluing test
Entry  Tue Oct 22 11:52:53 2019, Stephen, General, General, Epoxy Curing Timeline of OMC PZT Assy #9 and #10 omc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy_20191022.pngomc_elog_383_Epoxy_Curing_Timeline_of_OMC_PZT_Assy.pptx
This post captures the curing timeline followed by OMC PZT Assys #9 and #10.

Source file posted in case any updates or edits need to be made.
Entry  Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019 image_ep30-2_epoxy_kit_pcs_item_1582_location_downs_3303.JPG
The following is the current status of the epoxies used in assembly of the OMC (excerpt from C1900052)

Re-purchasing efforts are underway and/or complete


DONE

Masterbond EP30-2 currently located in Downs 303, Modal Lab (see image)

( WILL EXPIRE JANUARY 2020
    Reply  Tue Jul 8 04:08:06 2014, Koji, General, General, Expoxy reapplication for beam dumps 
Firstly, the excess epoxy was removed using a cleaned razor balde
Entry  Tue Jan 22 11:10:25 2013, Koji, Facility, General, Eyeware storage and hooks for the face shields are installed P1223116.JPG
A carpenter has come to install the eyeware storage and hooks for the face shields.
Entry  Thu Jan 10 20:42:54 2019, Koji, Optics, Characterization, FSR / HOM Test of OMC SN002 
OMC SN002 = Former LHO OMC which CM1 was destroyed by the lock loss pulse in 2016. This OMC needs to be optically tested before storage.

The test items:


[done] FSR measurement with offset PDH locking (FM->AM conversion)
[done] FSR/finesse
Entry  Sun Jul 6 02:45:56 2014, Koji, Optics, General, FSR Measurement finesse_measurements_log.pdf
3rd OMC FSR / Finesse measurement
RF AM was injected by detuning a HWP.
Entry  Wed May 14 02:15:15 2014, Koji, Optics, Characterization, FSR/TSM adjustment of the OMC cavity  Cav_scan_response_140503_Pitch.pdfCav_scan_response_140503_Yaw.pdf
1. FSR was adjusted and measured with "the golden arches" technique again.
FSR = 264.8412 MHz +/- 1400Hz => Lcav = 1.13197 m. (nominal 1.132m)
2. Transverse mode spacings for the vertical and horizontal modes were measured.
Entry  Mon Apr 1 03:13:41 2013, Koji, Optics, General, Failure of PZT-glass joints 
[Koji, Jeff, Zach, Lisa]
We glued a test PZT-mirror assembly last week in order to make sure the heat cure of the epoxy does not make any problem 
on the glass-PZT joints. The assembly was sent to Bob for the heat treatment. We received the assembly back from Bob on Wednesday.
Entry  Mon Apr 8 23:42:33 2013, Koji, Optics, Configuration, Fake OMC roughly aligned beam_profile.pdfmode_matching.pdf
Mode matching:
 
Entry  Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom CircleFit.pdfSineFit.pdf
I attempted to fit the data taken by Koji of the beam spot precession at the CCD in order to find the location of the curvature bottom in terms
of its distance (d) and angle () from the centre of the mirror. This was done using
the method described in a previous similar measurement  and Section 2.1.3 of 
    Reply  Wed Dec 19 18:47:03 2012, Koji, Clean, General, First Contact Training with Margot 
Steve and I visited Margot to have a training session for application of First Contact on optics.
- Make "thick" layer of first contact. It becomes thin when it gets dried.
- Apply more FC once a peek sheet is placed on the FC
Entry  Wed Jan 2 07:45:39 2013, Koji, Optics, Characterization, First Contact test Cav_scan_response_zoom_20121125_C2_before.pdfCav_scan_response_zoom_20121125_C2_after.pdf
Conclusion: Good. First contact did not damage the coating surface, and reduced the loss

- Construct a cavity with A1 and C2
- Measure the transmission and FWHM (of TEM10 mode)
Entry  Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect P8011949.JPGP8011947.JPGP8011948.JPG
- The floor of the room was cleaned and waxed!
- Sticky mats are placed! Now we require shoe covers!
    Reply  Tue Apr 16 08:12:14 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
T&Rs of the B mirrors and some of the E mirrors are measured.
I found that these BSs have high loss (1%~3%) . As this loss will impact the performance of
the squeezer
    Reply  Tue Apr 16 23:26:51 2013, Koji, Optics, Characterization, Further More Mirror T measurement 
Since the previous measurement showed too high loss, the optical setup was checked.
It seemed that a PBS right before the T&R measurement setup was creating a lot of scattering (halo) visible with a sensor card.
This PBS was placed to confirm the output polarization from the fiber, so it was ok to remove it.
Entry  Mon Dec 31 03:11:45 2012, Koji, Optics, Characterization, Further more RoC measurement Cav_scan_response_zoom_20121125_C6_9.pdf
Total (excluding C2, C7, C8): 2.575 +/- 0.005 [m]
New results
C6: RoC: 2.57321 +/− 4.2e-05m    
Entry  Fri Nov 9 00:43:32 2012, Koji, Optics, Characterization, Further more wedge measurement wedge_measurement_overall.pdf121108a_A1.pdf
Now it's enough for the first OMC (or even second one too).
Today's measurements all distributed in theta>0.5deg. Is this some systematic effect???
I should check some of the compeled mirrors again to see the reproducibility...
Entry  Tue Dec 29 12:15:46 2015, Koji, General, General, Glasgow polarizer passed to Kate 
The Glasgow polarizer was passed to Kate on Dec 17, 2015.
Entry  Mon Aug 10 15:34:04 2020, Koji, Facility, Loan / Lending, Glue bake oven 
Black and Decker Glue Baking Oven came back to the OMC lab on Aug 10, 2020, Georgia had lent the unit for the SAMS assembly/testing.
Entry  Fri Aug 30 12:14:50 2013, Koji, Optics, General, H1 OMC Cavity length adjustment Gouy_FSR_130827.nb.zipP8284343.jpg
Short conclusion: 
The roundtrip cavity length for the H1 OMC was adjusted to be 1.145m 
instead of 1.132m such that the 19th HOMs of the lower sideband do not get resonant together with the carrier.
Entry  Fri Aug 30 12:22:56 2013, Koji, Optics, General, H1 OMC Cavity side UV gluing 
H1 OMC Cavity side optics was glued on the breadboard
Curved mirror gluing
- Applied the UV glues to CM1/CM2 prisms.
Entry  Fri Aug 12 14:58:17 2016, Koji, General, Configuration, H1 OMC DCPD replacement  
Preparation of 3rd OMC for the use in H1

New DCPD(T) = B1-01
DCPD(T) = DCPDA: extracted and accomodated in CAGE-A SLOT1
Entry  Fri Aug 30 12:25:29 2013, Koji, General, General, H1 OMC Invar mount gluing P8304368.JPGP8304370.JPG
The Invar Mounting Blocks were glued on the breadboard.
Serial number #1/2/5/6/7/8 -> I1 OMC cable side
Serial number #9/10/11/12 -> H1 OMC cavity side
Entry  Mon Oct 14 13:40:16 2013, Koji, Optics, Characterization, H1 OMC Optical testing 
Since the middle of September, the optical tests of H1 OMC were took place.
Here is summary of the progress.
TEST1: FSR/FINESSE measurement before applying First Contact 
Entry  Mon Oct 14 15:50:55 2013, Koji, Optics, Characterization, H1 OMC Power budget OMC_power_budget.pdf
LHO OMC power budget

    
        
            Date

           2013/9/17
            2013/9/17
            2013/10/16
ELOG V3.1.3-