Thu Jul 20 14:14:49 2023, Thejas , Optics, General, A+ OMC bonding template alignment  
| +
Thu Aug 3 10:31:55 2023, Thejas, Optics, General, A+ OMC build: beam spot positions    
|
Mon Feb 27 17:40:27 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
|
Wed Mar 1 10:23:10 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
| +
Tue Mar 14 10:41:06 2023, Thejas , Optics, Characterization, A+ OMC curved mirror characterization
| +
Tue Mar 14 12:12:41 2023, Koji , Optics, Characterization, A+ OMC curved mirror characterization
|
Fri Mar 10 10:23:08 2023, Thejas, Optics, Characterization, A+ OMC curved mirror radius of curvature   
| +
Thu Jul 20 14:28:53 2023, Thejas , Optics, General, A+ OMC optic bench beam layout 
| +
Fri Jul 21 03:29:30 2023, Koji , Optics, General, A+ OMC optic bench beam layout
|
Wed Feb 15 17:40:21 2023, Thejas , Optics, Characterization, A+ OMC perpendicularity of hole prisms 20x
|
Sat Jul 29 12:05:52 2023, Thejas , Optics, General, A+ OMC unit 1 build: Resonance achieved
|
Tue Jul 25 23:39:07 2023, Thejas, Optics, General, A+ OMC unit 1: CM positions swapped
|
Thu Jul 13 01:02:58 2023, Stephen, Optics, General, A+ OMC, Bonding of Curved Mirror Batch 1 16x
|
Thu Jul 13 00:38:47 2023, Stephen, Optics, Characterization, A+ OMC, PZT DC Response and Length to Angle before Curved Mirror Assy Batch 1 
|
Wed Feb 8 16:10:52 2023, Stephen, Optics, Characterization, A+ OMC, Parallelism of HR Prisms 7x
|
Thu Feb 9 15:54:41 2023, Thejas , Optics, Characterization, A+ OMC, Parallelism of HR Prisms 19x
| +
Tue Jul 18 17:34:45 2023, Thejas, Optics, General, A+ PZT sub-assemblies    
| +
Wed Jul 19 14:26:17 2023, Koji, Optics, General, A+ PZT sub-assemblies
|
Fri Jul 21 00:23:35 2023, Thejas , Optics, General, A+ PZT subassembly glue sheets   
| +
Thu Aug 3 15:15:29 2023, Thejas, Optics, General, A+OMC mode-matching efficiency
| +
Thu Aug 3 15:24:28 2023, Koji, Optics, General, A+OMC mode-matching efficiency
|
Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced
| +
Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken
|
Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface  
|
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking 
|
Mon Nov 13 23:57:55 2023, Koji, Electronics, Loan / Lending, Agilent 4395A Network Analyzer -> WB251
|
Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue)
|
Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy
| +
Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed
| +
Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued
| +
Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued
|
Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration
|
Wed Jan 16 14:10:50 2013, Koji, Optics, Characterization, Autocollimator tests of optics perpendicularity/parallelism
| +
Sat Mar 26 18:22:24 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs
| +
Tue Apr 5 18:22:40 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs
| +
Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination
| +
Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination
| +
Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber
| +
Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber
|
Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
|
Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC  
|
Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002    
| +
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets 
| +
Wed Apr 26 14:43:44 2023, Stephen, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
| +
Fri May 12 10:00:06 2023, Camille Makarem, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
|
Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav
|
Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs
|
Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven
| +
Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks
|
Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test 
|
|