40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 1 of 11
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
542 Entries
Goto page 1,
2
,
3
...
9
,
10
,
11
Next
Thu Sep 27 20:19:15 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
Thu Nov 1 19:57:32 2018, Aaron, Optics, General, Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror
Mon Nov 7 21:16:16 2022, Camille, Optics, Configuration, Setting up the fiber couplers
Mon Nov 14 08:34:45 2022, Camille, Optics, Characterization, transmission measurements through OMC #1 (before cleaning)
Tue Nov 15 07:46:58 2022, Camille Makarem, Optics, General, cleaning OMC #1
Fri Nov 18 18:41:05 2022, Camille Makarem, General, General, 2nd deep cleaning of OMC #1
Fri Mar 24 07:38:54 2023, Camille Makarem, Optics, Characterization, ROC measurements of the curved mirrors
Fri Mar 24 07:47:37 2023, Camille Makarem, Optics, Characterization, ROC measurements of the curved mirrors
Tue Mar 28 11:21:27 2023, Camille Makarem, Optics, Characterization, Sagitta measurements of curved mirrors
Thu Apr 13 07:47:28 2023, Camille Makarem, Optics, Characterization, Zygo setup for curved mirror measurements
Fri Apr 14 15:52:53 2023, Camille Makarem, Optics, Characterization, Determining the curvature bottom of the curved mirrors
Mon Apr 24 15:29:48 2023, Camille Makarem, Optics, , summary of zygo setups
6x
Fri May 12 10:00:06 2023, Camille Makarem, General, Loan / Lending, Borrowed Items for PZT DC Response Shadow Sensor Setup
Thu May 16 12:41:28 2019, Chub, General, General, fire pillow found on optics table
Fri Jun 14 06:35:21 2013, Jeff, General, General, [LLO] L1 OMC status
Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking
Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking
Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR
Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors
Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1
Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow
Fri Jun 15 15:45:49 2012, Koji, General, General, OMC Plan
Sat Jun 16 08:53:09 2012, Koji, General, General, To Do List
Wed Jun 20 00:10:53 2012, Koji, Facility, General, Hole on the wall was patched
Sat Jul 14 02:16:07 2012, Koji, General, General, Plan Update: July
Wed Jul 18 23:20:13 2012, Koji, Optics, Characterization, Mode scan results of ELIGO
Mon Jul 23 17:15:14 2012, Koji, Clean, General, Talking with Margot
Tue Jul 24 11:41:29 2012, Koji, General, General, Useful references
Tue Jul 31 21:29:43 2012, Koji, General, General, Work completed in July [!]
Tue Jul 31 21:33:17 2012, Koji, General, General, Plan Update: August [!]
Wed Aug 1 19:35:00 2012, Koji, Facility, General, Floor cleaned / Workbench being built / Table top defect
Sat Aug 11 00:59:14 2012, Koji, Facility, General, Laser Safety Barrier
Mon Aug 13 16:59:11 2012, Koji, Clean, General, Room Cleaning Log
Mon Aug 13 17:01:35 2012, Koji, Clean, General, Particle Counts
Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack
Wed Aug 22 20:16:43 2012, Koji, Facility, General, Workbenches have been installed / Clean room stools
Tue Sep 25 14:18:14 2012, Koji, Clean, General, Particle Counts
Mon Oct 1 16:06:55 2012, Koji, Clean, General, Particle Counts
Fri Oct 5 03:39:58 2012, Koji, Optics, General, RoC Test setup
Mon Oct 8 11:30:47 2012, Koji, Optics, General, EG&G 2mm photodiode angle response
Tue Oct 9 04:59:24 2012, Koji, Optics, General, OMC Test Optical Setup
Tue Oct 9 05:03:15 2012, Koji, Electronics, General, OMC Test Electronics Setup
Fri Oct 12 17:15:19 2012, Koji, Optics, General, Loan from the 40m / ATF
Tue Oct 16 15:50:09 2012, Koji, General, General, Work completed in August/September [!]
Tue Oct 16 15:51:01 2012, Koji, General, General, Plan Update: October [!]
Wed Oct 17 20:36:04 2012, Koji, Optics, General, RoC test cavity locked
Thu Oct 18 20:23:33 2012, Koji, Optics, Characterization, Improved measurement
Wed Nov 7 01:28:20 2012, Koji, Optics, Characterization, Wedge angle test (A1)
Wed Nov 7 20:21:42 2012, Koji, General, General, Work completed in October [!]
Wed Nov 7 20:44:11 2012, Koji, General, General, Plan Update: November [!]
Goto page 1,
2
,
3
...
9
,
10
,
11
Next
ELOG V3.1.3-