Entry  Sat Feb 2 20:35:02 2019, Koji, Optics, Characterization, Summary: OMC(002) HOM structure recalculation (after mirror replacement)  OMC_HOM_190110.pdfHOM_PZTV.pdfHOM_plot_PZT0_0.pdfCav_scan_response_PZT.pdf
OMC (002) after repair
History:Mirror replacement after the damage at H1. Measurement date 2019/1/10
Entry  Tue Sep 24 12:19:20 2019, Stephen, General, General, Dirty ABO test run prior to PZT Subassembly Bonding  image_showing_20190923_abo_qualifying_bake.png
The 40m Bake Lab's Dirty ABO's OMEGA PID controller was borrowed for another oven in the Bake Lab (sound familiar? OMC
elog 377), so I have had to play with the tuning and parameters to recover. This bake seemed to inadequately match the intended temperature profile
for some reason (intended profile is shown by plotting prior qualifying bake for comparison). 
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
Connector unmounting

- (Attachment 1) The connector nut rings were removed using an angled needle nose plier. The connector shell has a tight dimension
relative to the hole on the bracket. But of course, they could be extracted.
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
Checking the spare parts 

- Conclusion for OMC#2: need PEEK cable ties
- for more OMCs: need more BHCS / PEEK cable ties / Helicoils
Entry  Thu Nov 17 18:56:22 2022, Koji, Optics, General, Transmission measurements of OMC #1 after deep cleaning PXL_20221117_232145418.jpgScreen_Shot_2022-11-17_at_19.02.31.png
[Camille, Koji]

- Removed the first contact we left on Monday.

- Measured transmission (Set1) Very high loss! Total optical loss of 18.5%! Observation
Entry  Thu Feb 18 21:08:32 2016, Koji, General, Loan / Lending, (all returned) Antonio loan 
Antonio borrowed: Rich's PD cutter (returned), Ohir power meter(returned), Thorlabs power meter head, Chopper
Entry  Fri Nov 18 18:41:05 2022, Camille Makarem, General, General, 2nd deep cleaning of OMC #1 PXL_20221118_213955948.jpg
The four cavity mirrors in OMC #1 were each scrubbed using acetone and a cotton swab.
Then, the four mirrors were painted with First Contact (picture attached). The First Contact was allowed to dry for 20 minutes, then removed while
using the top gun.
Entry  Sat May 5 22:51:04 2018, Koji, Optics, General, 3IFO EOM Optical test 
The 3IFO EOM test performed at the 40m. Result: 40m ELOG 13819
Entry  Mon Jul 2 11:30:22 2018, Koji, Electronics, Characterization, 3IFO EOM impedance measurement impedance_eom.pdfEOM_Z_DATA.zip
[Rich Koji]

3IFO EOM (before any modification) was tested to measure the impedance of each port.

The impedance plot and the impedance data (triplets of freq, reZ, imZ) were attached to this entry.
Entry  Wed May 30 17:44:23 2018, Koji, Optics, Characterization, 3IFO EOM surface check IMG_5756.JPGIMG_5757.JPGIMG_5758.JPGIMG_5759.JPGLooking_at_Hole2.png
3IFO EOM dark microscope images courtesy by GariLynn and Rich

Attachment1/2: Hole #1
Attachment3/4: Hole #2
Entry  Sat Jan 17 11:40:04 2015, Koji, General, General, 3rd OMC completed 
Jan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
Regarding: D1200971

- 4 CLASS A wire clamp obtained from the OMC spare
- 4 more DIRTY wire clamp obtained from WB experiments (they no longer use these)
Entry  Mon Nov 9 22:06:18 2020, Koji, Mechanics, General, 5th OMC Transport Fixture IMG_0211.jpgIMG_0221.jpg
I helped to complete the 5th OMC Transport Fixture. It was built at the 40m clean room and brought to the OMC lab. The fixture hardware (~screws) were
also brought there.
Entry  Thu Jul 26 20:57:07 2018, Koji, Electronics, Characterization, 9MHz port tuned impedance impedance_eom.pdfeom9.pdfeom_models_9MHz.pdf
[Rich Koji]

The 9MHz port was tuned and the impedance was measured.
Entry  Mon Jul 1 12:38:49 2019, Koji, Optics, Characterization, A and M prisms perpendicularity measurement 6x
[Stephen, Koji]

The perpendicularity of some of the A and M prisms were tested.

Results
Entry  Mon Nov 27 20:24:24 2017, Koji, General, General, A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm 6x
Attachment 1: The PD was removed from the transmission side of the OMC #002 (former LHO OMC - the one blasted by the optical pulse in
Aug 2016).
It was confirmed that the PD has the scribing mark saying "A".
Entry  Mon Aug 4 18:59:50 2014, Koji, General, General, A memorandom 
On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808
Entry  Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced 

New filter PN
Grainger
TK70457312T Mini-Pleat Air Filter, Style - Air Filters Box, Performance Rating MERV 14, Nominal Filter Size 12x24x2

 

Previous
    Reply  Fri Apr 5 18:18:36 2013, Zach, Optics, Configuration, AOM probably broken Isomet_1250C_zin_4_5_13.png


    
        
            Quote:
        
        
            

           Then, I started to check the AOM path. I noticed that the 1st (or -1st) order beam is very weak. 
Entry  Mon Apr 1 10:28:03 2013, Koji, Mechanics, General, Additional UV blast for the top surface P3283483.JPGP3283459.jpgP3283473.JPG
[Koji, Lisa, Jeff, Zach]

Jeffs concern after talking with the glue company (EMI) was that the UV blast for the top side was not enough.
Entry  Fri Apr 19 09:35:28 2019, Joe, General, , Adjusting cavity axis, re-alignment of OMC and locking FSR_Scan_Fitfsrdata.pdfIMG_7679_cropped.jpg
[koji,philip, joe, liyuan, steven]

*still need to add photos to post*

PZT 11 was removed and inspected for so dust/dirt on the bottom of the prism. We saw a spot. We tried to remove this with acetone,
Entry  Fri Apr 12 09:25:31 2013, Koji, Optics, Characterization, Alignment of the OMC (without glue) 
[Zach Koji]
The first attempt not to touch the curved mirrors did not work. (Not surprising)
The eigenmode is not found on the mirror surface.
Entry  Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy T1500060_OMC_Optical_Testing_Procedure.pdf
Notes on the OMC cavity alignment strategy

- x3=1.17 γ + 1.40 δ, x4=1.40 γ + 1.17 δ
- This means that the effect of the two curved mirrors (i.e. gouy phases) are very similar. To move x3 and x4 in common is easy, but to do differentially
    Reply  Mon Jun 23 21:54:16 2014, Koji, Optics, General, All of the gluing completed 
The bottom-side templates were removed.
The last beam dump was removed
TODO
    Reply  Fri Jun 20 18:59:12 2014, Koji, Optics, General, All of the invar blocks have been glued 
All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed.
Entry  Thu Jun 19 23:16:50 2014, Koji, Optics, General, All of the prisms have been glued P6196525.JPG
- All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been glued

TODO
Entry  Fri Jan 18 13:25:17 2013, Koji, Optics, Configuration, Autocollimator calibration autocollimator_calibration.pdf
An autocollimator (AC) should show (0,0) if a retroreflector is placed in front of the AC.
However, the AC may have an offset. Also the retroreflector may not reflect the beam back with an exact parallelism.
To calibrate these two errors, the autocollimator is calibrated. The retroreflector was rotated by 0, 90, 180, 270 deg
Entry  Wed Jan 16 14:10:50 2013, Koji, Optics, Characterization, Autocollimator tests of optics perpendicularity/parallelism 
The items:
- Autocollimator (AC) borrowed from Mike Smith (Nippon Kogaku model 305, phi=2.76", 67.8mm)
- Retroreflector (corner cube)
    Reply  Sat Mar 26 18:22:24 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs 
For the production of the aLIGO PDs, the following transfer of the PDs were carried out
A1-23 Cage A1 -> G1
A1-25 Cage A2 -> G2
    Reply  Tue Apr 5 18:22:40 2016, Koji, Electronics, Characterization, Baking / Contamination tests of the PDs QE_after_air_bake.pdf
Possible reduction of the QE was observed after air-bake at 75degC.


Yesterday I received Cage G from Bob for intermediate test of the PD performance after air bake but before vacuum bake.
This cage was prepared to be the production pair.
Entry  Wed Jul 2 18:58:42 2014, Koji, General, General, Beam dump delamination beamdump_delamination.png
While the OMC breadboard was being inspected, it was found that two out of five black-glass beam dumps showed sign of delamination.
(attached photos).
The base of the each beam dump is a fused silica disk (25mm dia.). The black glass pieces are bonded to the disk. The bond is EP30-2 
    Reply  Thu Jul 3 17:45:18 2014, Koji, General, General, Beam dump delamination beamdump_delamination_solution.png
Here is the resolution.
I'll apply fillets of EP30-2 along the edges of the black glass (See figure). 
In order to allow the air escape from the gap, the inside of the V will not be painted. 
    Reply  Fri Mar 29 08:55:00 2013, Zach, Optics, Configuration, Beam launched into fiber 


    
        
            Quote:
        
        
            

           Lisa and I concurred that it felt like we had converged to the optimum alignment and polarization, which would mean that the lack of
    Reply  Thu Apr 4 23:44:52 2013, Koji, Optics, Configuration, Beam launched into fiber 
We had to move our flipper mirror to share the beam between Peter's setup and ours as our flipper is at the place where the ISS PD array base is supposed
to be!
There was no place to insert the flipper in the setup. We (Peter and Koji) decided to move the laser back for ~2".
Entry  Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing 6x
[Stephen, Koji]

20 glass beamdumps were bonded at the 40m cleanroom.


Attachment 1: We had 20 fused silica disks with a V-groove and 40 black glass pieces
Entry  Sat Mar 23 02:41:00 2013, Koji, Optics, General, Black glass beam dumps for the first OMC P3223314.JPGP3223319.jpgP3223320.jpg
Received black glass beam dumps from MIT
- gluing by EP30-2 looks pretty fine. Enough sturdy.
- some gap visible between the glass => incident angle should be considered so that the first beam does not exit from the gap
Entry  Sat Jul 1 15:29:57 2017, Koji, Optics, General, Black glass cleaning / Final bonding for the emergency repair for OMC #002 DSC_0347.jpgDSC_0348.jpgDSC_0350.jpgDSC_0352.jpgDSC_0354.jpg
[Alena, Koji] 

Report of the work on June 30.

1. Cleaning of the black glass beam dumps
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
Bond reinforcement blocks for the invar brackets:


Attachment 1: CLASS A glass prisms (the surplus of the 2016 repair)
Attachment 2: Dirty
reiforcement bars made of Aluminum
There are also many dirty prisms in the kit obtained from Stephen
Entry  Tue Oct 22 15:54:59 2019, Koji, Electronics, Loan / Lending, Borrowed LB1005 from Cryo Cav 
From Cryo Cav setup

Borrowed LB1005 Servo box -> OMC

 
Entry  Tue Apr 16 23:11:43 2019, Koji, General, General, Borrowed items from the other labs 
Apr 16, 2019
Borrowed two laser goggles from the 40m. (Returned Apr 29, 2019)
Borrowed small isopropanol glass bottole from CTN.
Entry  Thu May 3 21:45:58 2018, awade, General, Loan / Lending, Borrowed toaster oven 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg
I’ve borrowed the black and decker toaster oven to dry some sonicated parts. It is temporarly located in the QIL lab. 
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
OMC Reinforcement blocks

1. P/N D1600316; Version v4; Type 01; Qty 30; Source Chemistry Machine Shop
2. P/N D1600316; Version v4; Type 02; Qty 15; Source Chemistry Machine Shop
Entry  Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test C30665_high_power_test.pdfpd_surface.jpg
An Excelitas C30665 PD with the cap removed (SN07 in Case H slot #2) was exposed to the beam with the optical power of 1.4mW to 334mW. 
After each illumination, the dark current and the dark noise level were tested. Also the photo image of the PD surface was taken each time.

- No significant change of the dark current after each illumination.
Entry  Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone 8x
[LiyuanZ, StephenA]

Downs B119

Summary: Beginning on 20 May 2019, two CM PZT assemblies were soaked in Acetone in an effort to debond the EP30-2 bonds
Entry  Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress COMSOL1.png
 
Entry  Thu May 30 14:38:42 2013, Koji, Electronics, General, Cable fitting  
Yesterday Jeff and Chub worked on the cabling of the OMC. It turned out that the gender of the cable connectors 
going from the cavity side to  the connector bracket on top of the OMC were opposite from what is  needed.  
This way, the connectors can't fixed on the cable harness, thus they are free during the shipping.
    Reply  Fri Apr 5 14:39:26 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs after the heat cure shadow_sensor_calib_after_bake.pdfPZTresponse.pdf
We attached fused silica windows on the test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought to Bob's bake lab for the heat cure. There they are exposed to 94degC heat for two hours (excluding ramp up/down
time).
Entry  Wed Apr 3 17:39:38 2013, Koji, Mechanics, Characterization, Calibration of the test PZTs before the glue test P4033491.JPGshadow_sensor_calib.pdf
We want to make sure the responses of the PZT actuator does not change after the EP30-2 gluing.
A shadow sensor set up was quickly set-up at the fiber output. It turned out the ring PZTs are something really not-so-straightforward. 
If the PZT was free or just was loosely attached on a plane by double-sided tape, the actuation response was quite low (30% of the spec). 
    Reply  Wed May 22 07:31:37 2019, Koji, Optics, Configuration, Camera test (DCPD high power test) 20190521201838_IMG_7939_2.jpg
C30665 (3mm) camera test. The camera was Canon PowerShot G7X MkII. Exposure 1/15s, F 5.6, ISO 125, MF (~the closest), no zoom.
This image was taken before the beam illumination. Will tune the green lighting to have some gradient on the surface so that we can see any deformation
of the surface.
Entry  Tue Jun 18 10:01:11 2013, Koji, Optics, Characterization, Cavity Finesse analysis finesse_measurements.pdf
This is the analysis of the cavity finesse data taken on  Apr/13/2013 (before baking), May/30/2013 (after baking), and Jun/02/2013 (after cleaning).
If we believe this result, baking contaminated the cavity, and the first contact removed it. That agrees with the power measurement of the transmitted
light.