ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
318
|
Sat Feb 2 20:35:02 2019 |
Koji | Optics | Characterization | Summary: OMC(002) HOM structure recalculation (after mirror replacement) | OMC (002) after repair
History:Mirror replacement
after the damage at H1. Measurement date |
   |
379
|
Tue Sep 24 12:19:20 2019 |
Stephen | General | General | Dirty ABO test run prior to PZT Subassembly Bonding | The 40m Bake Lab's
Dirty ABO's OMEGA PID controller was
borrowed for another oven in the Bake Lab |
|
250
|
Thu Feb 18 21:08:32 2016 |
Koji | General | Loan / Lending | (all returned) Antonio loan | Antonio borrowed: Rich's PD cutter
(returned), Ohir power meter(returned),
Thorlabs power meter head, Chopper |
|
294
|
Sat May 5 22:51:04 2018 |
Koji | Optics | General | 3IFO EOM Optical test | The 3IFO EOM test performed at
the 40m. Result: 40m
ELOG 13819 |
|
298
|
Mon Jul 2 11:30:22 2018 |
Koji | Electronics | Characterization | 3IFO EOM impedance measurement | [Rich Koji]
3IFO EOM (before any modification)
was tested to measure the impedance of each |
 |
297
|
Wed May 30 17:44:23 2018 |
Koji | Optics | Characterization | 3IFO EOM surface check | 3IFO EOM dark microscope images courtesy
by GariLynn and Rich
Attachment1/2: Hole #1 |
    |
219
|
Sat Jan 17 11:40:04 2015 |
Koji | General | General | 3rd OMC completed | Jan 15, 2015 3rd OMC completed
The face caps of the DCPD/QPD cables
were installed (Helicoils inserted) |
|
400
|
Mon Nov 9 22:06:18 2020 |
Koji | Mechanics | General | 5th OMC Transport Fixture | I helped to complete the 5th OMC Transport
Fixture. It was built at the 40m clean room
and brought to the OMC lab. The fixture hardware |
 |
303
|
Thu Jul 26 20:57:07 2018 |
Koji | Electronics | Characterization | 9MHz port tuned impedance | [Rich Koji]
The 9MHz port was tuned and the
impedance was measured. |
  |
369
|
Mon Jul 1 12:38:49 2019 |
Koji | Optics | Characterization | A and M prisms perpendicularity measurement | [Stephen, Koji]
The perpendicularity of
some of the A and M prisms were tested. |
6x |
289
|
Mon Nov 27 20:24:24 2017 |
Koji | General | General | A former LHO PD (Trans) removed from the OMC #002 for the shipment to Stockholm | Attachment 1: The PD was
removed from the transmission side of the
OMC #002 (former LHO OMC - the one blasted |
6x |
215
|
Mon Aug 4 18:59:50 2014 |
Koji | General | General | A memorandom | On breadboarfd cabling for 3IFO OMC
D1300371 - S1301806
D1300372 - S1301808 |
|
99
|
Fri Apr 5 18:18:36 2013 |
Zach | Optics | Configuration | AOM probably broken |
|
|
90
|
Mon Apr 1 10:28:03 2013 |
Koji | Mechanics | General | Additional UV blast for the top surface | [Koji, Lisa, Jeff, Zach]
Jeffs concern after talking with the |
  |
348
|
Fri Apr 19 09:35:28 2019 |
Joe | General | | Adjusting cavity axis, re-alignment of OMC and locking | [koji,philip,
joe, liyuan,
steven] |
 |
109
|
Fri Apr 12 09:25:31 2013 |
Koji | Optics | Characterization | Alignment of the OMC (without glue) | [Zach Koji]
The first attempt not to touch the
curved mirrors did not work. (Not surprising) |
|
359
|
Thu May 9 17:35:07 2019 |
Koji | Optics | General | Alignment strategy | Notes
on the OMC cavity alignment strategy
- x3=1.17 γ + 1.40 δ, x4=1.40 |
|
189
|
Mon Jun 23 21:54:16 2014 |
Koji | Optics | General | All of the gluing completed | The bottom-side templates were removed.
The last beam dump was removed
TODO |
|
188
|
Fri Jun 20 18:59:12 2014 |
Koji | Optics | General | All of the invar blocks have been glued | All of the INVAR blocks have been glued.
I found thinner shims in the stock.
On Monday, the template will be removed. |
|
187
|
Thu Jun 19 23:16:50 2014 |
Koji | Optics | General | All of the prisms have been glued | - All of the PRISM mirrors have been glued
- 4 out of 5 beam dumps have been
glued |
|
55
|
Fri Jan 18 13:25:17 2013 |
Koji | Optics | Configuration | Autocollimator calibration | An autocollimator (AC) should show (0,0)
if a retroreflector is placed in front of
the AC. |
|
54
|
Wed Jan 16 14:10:50 2013 |
Koji | Optics | Characterization | Autocollimator tests of optics perpendicularity/parallelism | The
items:
- Autocollimator (AC) borrowed from |
|
257
|
Sat Mar 26 18:22:24 2016 |
Koji | Electronics | Characterization | Baking / Contamination tests of the PDs | For the production of the aLIGO PDs, the
following transfer of the PDs were carried
out |
|
259
|
Tue Apr 5 18:22:40 2016 |
Koji | Electronics | Characterization | Baking / Contamination tests of the PDs | Possible
reduction of the QE was observed after air-bake
at 75degC. |
|
194
|
Wed Jul 2 18:58:42 2014 |
Koji | General | General | Beam dump delamination | While the OMC breadboard was being inspected,
it was found that two out of five black-glass
beam dumps showed sign of delamination. |
|
195
|
Thu Jul 3 17:45:18 2014 |
Koji | General | General | Beam dump delamination | Here is the resolution.
I'll apply fillets of EP30-2 along
the edges of the black glass (See figure). |
|
87
|
Fri Mar 29 08:55:00 2013 |
Zach | Optics | Configuration | Beam launched into fiber |
|
|
97
|
Thu Apr 4 23:44:52 2013 |
Koji | Optics | Configuration | Beam launched into fiber | We had to move our flipper mirror to share
the beam between Peter's setup and ours as
our flipper is at the place where the ISS |
|
386
|
Fri Dec 6 00:55:25 2019 |
Koji | Optics | General | Beamdump gluing | [Stephen, Koji]
20 glass beamdumps were
bonded at the 40m cleanroom. |
6x |
76
|
Sat Mar 23 02:41:00 2013 |
Koji | Optics | General | Black glass beam dumps for the first OMC | Received black glass beam dumps from
MIT
- gluing by EP30-2 looks pretty fine. |
  |
283
|
Sat Jul 1 15:29:57 2017 |
Koji | Optics | General | Black glass cleaning / Final bonding for the emergency repair for OMC #002 | [Alena, Koji]
Report of the work on June
30. |
    |
385
|
Tue Oct 22 15:54:59 2019 |
Koji | Electronics | Loan / Lending | Borrowed LB1005 from Cryo Cav | From Cryo Cav setup
Borrowed LB1005 Servo box ->
OMC |
|
343
|
Tue Apr 16 23:11:43 2019 |
Koji | General | General | Borrowed items from the other labs | Apr 16, 2019
Borrowed
two laser goggles from the 40m. (Returned |
|
293
|
Thu May 3 21:45:58 2018 |
awade | General | Loan / Lending | Borrowed toaster oven | I’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. |
|
365
|
Thu May 23 01:42:46 2019 |
Koji | Optics | Characterization | C30665 high power test | An Excelitas C30665 PD with the
cap removed (SN07 in Case H slot #2) was
exposed to the beam with the optical power |
 |
367
|
Tue May 28 12:14:20 2019 |
Stephen | Optics | General | CM PZT Assembly Debonding of EP30-2 in Acetone | [LiyuanZ, StephenA]
Downs B119
Summary: |
8x |
123
|
Fri May 10 09:33:22 2013 |
Koji | Supply | General | COMSOL simulation on the glass bracket stress | |
|
131
|
Thu May 30 14:38:42 2013 |
Koji | Electronics | General | Cable fitting | Yesterday Jeff and Chub worked on the cabling
of the OMC. It turned out that the gender
of the cable connectors |
|
98
|
Fri Apr 5 14:39:26 2013 |
Koji | Mechanics | Characterization | Calibration of the test PZTs after the heat cure | We attached fused silica windows on the
test PZTs. http://nodus.ligo.caltech.edu:8080/OMC_Lab/93
The glued assemblies were brought |
 |
92
|
Wed Apr 3 17:39:38 2013 |
Koji | Mechanics | Characterization | Calibration of the test PZTs before the glue test | We want to make sure the responses of the
PZT actuator does not change after the EP30-2
gluing. |
 |
364
|
Wed May 22 07:31:37 2019 |
Koji | Optics | Configuration | Camera test (DCPD high power test) | C30665 (3mm) camera test. The camera was
Canon PowerShot G7X MkII. Exposure 1/15s,
F 5.6, ISO 125, MF (~the closest), no zoom. |
|
145
|
Tue Jun 18 10:01:11 2013 |
Koji | Optics | Characterization | Cavity Finesse analysis | This is the analysis of the cavity finesse
data taken on Apr/13/2013 (before baking),
May/30/2013 (after baking), and Jun/02/2013 |
|
185
|
Fri May 16 00:13:36 2014 |
Koji | Optics | Characterization | Cavity mirror gluing part 1 | BS1/FM1/FM2 for I1OMC were glued.
FM1 had to be intentionally rotated.
FM1 had to be intentionally shifted |
|
18
|
Tue Aug 14 03:29:06 2012 |
Koji | Supply | General | Clean supply rack | Clean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to |
 |
347
|
Fri Apr 19 09:21:07 2019 |
Philip | Optics | | Cleaning of OMC optics | ach[Joe, Phillip, Koji,
Stephen]
Work from 17.04.2019 |
  |
217
|
Wed Aug 27 23:13:13 2014 |
Koji | Optics | Characterization | Collection of the power budgetting info | L1
OMC Cavity power budget
H1 |
|
126
|
Mon May 13 15:00:23 2013 |
Koji | General | General | Current most reliable OMC schedule | May
Tue 14th The OMC
given to Bob (Air bake & Vac bake)
Mon
20th The OMC received from Bob
|
|
129
|
Tue May 21 18:28:08 2013 |
Koji | General | General | Current most reliable OMC schedule | - The wrong Mighty Mouse connectors for
the PZT wires were prepared. The correct
ones are in the vacuum oven till Tuesday |
|
225
|
Sat Jul 18 11:37:21 2015 |
Koji | Electronics | AM Stabilized EOM Driver | D0900848 power board ~ oscillation issue solved | Power Supply Board D0900848 was
oscillating. Here is the procedure how the
issue was fixed. |
6x |
269
|
Fri Sep 9 19:43:32 2016 |
Koji | Optics | General | D1102211 OMC Diode Mount Glass Block went to Downs | D1102211 OMC Diode Mount Glass Block (11pcs)
have been given to Calum@Downs |
|