309
|
Thu Sep 27 20:19:15 2018 |
Aaron | Optics | General | Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror | I started some analytic calculations of
how OMC mirror motion would add to the noise
in the BHD. I want to make some prettier |
|
310
|
Thu Nov 1 19:57:32 2018 |
Aaron | Optics | General | Montecarlo simulation of the phase difference between P and S pols for a modeled HR mirror | I'm still not satisfied/done with the
solution to this, but this has gone too long
without an update and anyway probably someone |
|
451
|
Mon Nov 7 21:16:16 2022 |
Camille | Optics | Configuration | Setting up the fiber couplers | [Camille, Koji]
Began setting up fiber assembly
for OMC testing: |
  |
454
|
Mon Nov 14 08:34:45 2022 |
Camille | Optics | Characterization | transmission measurements through OMC #1 (before cleaning) | [Camille, Koji]
Friday, Nov 11th, 2022
Setting up OMC #1 for transmission |
 |
456
|
Tue Nov 15 07:46:58 2022 |
Camille Makarem | Optics | General | cleaning OMC #1 | Monday, November 14, 2022
Camille and Koji did a "deep
cleaning" of OMC#1: |
|
461
|
Fri Nov 18 18:41:05 2022 |
Camille Makarem | General | General | 2nd deep cleaning of OMC #1 | The four cavity mirrors in OMC #1 were
each scrubbed using acetone and a cotton
swab. |
|
514
|
Fri Mar 24 07:38:54 2023 |
Camille Makarem | Optics | | ROC measurements of the curved mirrors | [Thejas, Camille]
21 March 2023
We made slight adjustments to the |
|
515
|
Fri Mar 24 07:47:37 2023 |
Camille Makarem | Optics | | ROC measurements of the curved mirrors | [Camille]
22 March 2023
Beam profile measurements were continued |
 |
516
|
Tue Mar 28 11:21:27 2023 |
Camille Makarem | Optics | | Sagitta measurements of curved mirrors | [Camille, Stephen, Thejas]
Curved mirror sn02 was used to test |
|
362
|
Thu May 16 12:41:28 2019 |
Chub | General | General | fire pillow found on optics table | That is an expanding fire pillow, also
known as firebrick. It is used to create
a fire block where holes in fire-rated walls |
|
144
|
Fri Jun 14 06:35:21 2013 |
Jeff | General | General | [LLO] L1 OMC status | https://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7410
Weights:
Suspension cage and transportation |
|
346
|
Thu Apr 18 20:47:54 2019 |
Joe | Optics | | OMC initial alignment and locking | [Joe, Phillip, Koji, Stephen]
*draft post, please add anymore
info if I missed something* |
    |
348
|
Fri Apr 19 09:35:28 2019 |
Joe | General | | Adjusting cavity axis, re-alignment of OMC and locking | [koji,philip,
joe, liyuan,
steven] |
 |
351
|
Mon Apr 22 09:54:21 2019 |
Joe | General | | Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR | [Koji,Joe,Philip,stephen]
in units 20um per div on the micrometer
[n.b. we reailised that its 10um per div |
 |
353
|
Tue Apr 23 10:21:12 2019 |
Joe | Optics | Configuration | Moving the spots to the centre of the curved mirrors | [Koji,Philip, Liyuan, Joe]
CM1:
We moved the curved mirrors to |
  |
354
|
Wed Apr 24 13:58:51 2019 |
Joe | Optics | Characterization | OMC power budget and UV Epoxy Bonding of BS1 | [koji,philip,joe,liyuan,stephen]
need to add spot positions.
Mirrors: PZT11,PZT22, A14, A5 |
|
355
|
Thu Apr 25 15:05:19 2019 |
Joe | Optics | Characterization | Looking at PZT HOM spacing dependance and thinking about workflow | [koji, joe]
The template or glass breadboard
was wobbling, and we noticed that the caivty |
|
1
|
Fri Jun 15 15:45:49 2012 |
Koji | General | General | OMC Plan | LIGO Document G1200683-v1:
aLIGO OMC fabrication and testing |
|
2
|
Sat Jun 16 08:53:09 2012 |
Koji | General | General | To Do List | Facility
Work
|
|
3
|
Wed Jun 20 00:10:53 2012 |
Koji | Facility | General | Hole on the wall was patched | |
|
7
|
Sat Jul 14 02:16:07 2012 |
Koji | General | General | Plan Update: July | Facility/Supplies
Work in progress |
|
8
|
Wed Jul 18 23:20:13 2012 |
Koji | Optics | Characterization | Mode scan results of ELIGO | Nic Smith sent me a bunch of elog lists
where the results of the mode scan can be
found. |
|
10
|
Mon Jul 23 17:15:14 2012 |
Koji | Clean | General | Talking with Margot | I consulted with Margot about the cleaning
of the optics
Optics are considered |
|
11
|
Tue Jul 24 11:41:29 2012 |
Koji | General | General | Useful references | Nicolas Smith,
LIGO Document T0900383-v1
|
|
12
|
Tue Jul 31 21:29:43 2012 |
Koji | General | General | Work completed in July [!] |
Completed Work: Facility/Supplies
|
|
13
|
Tue Jul 31 21:33:17 2012 |
Koji | General | General | Plan Update: August [!] | Completed work of the previous months:
[Jul]
[Aug] [Sep] [Oct] [Nov] [Dec] |
|
14
|
Wed Aug 1 19:35:00 2012 |
Koji | Facility | General | Floor cleaned / Workbench being built / Table top defect | -
The floor of the room was cleaned and waxed!
- |
  |
15
|
Sat Aug 11 00:59:14 2012 |
Koji | Facility | General | Laser Safety Barrier | It seemed that a laser safety barrier was
installed today!?
|
|
16
|
Mon Aug 13 16:59:11 2012 |
Koji | Clean | General | Room Cleaning Log | Floor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012) |
|
17
|
Mon Aug 13 17:01:35 2012 |
Koji | Clean | General | Particle Counts | Aug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um 400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A) |
|
18
|
Tue Aug 14 03:29:06 2012 |
Koji | Supply | General | Clean supply rack | Clean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to |
 |
19
|
Wed Aug 22 20:16:43 2012 |
Koji | Facility | General | Workbenches have been installed / Clean room stools | Last Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool. |
 |
20
|
Tue Sep 25 14:18:14 2012 |
Koji | Clean | General | Particle Counts | Particle counts
Before the prefilter is installed:
0.5um 1191cnts, 0.7um 346cnts |
|
21
|
Mon Oct 1 16:06:55 2012 |
Koji | Clean | General | Particle Counts | 1. It turned out that the particle
counter MET ONE 227A at ATF shows
(particle count)/(0.1 ft^3) |
|
22
|
Fri Oct 5 03:39:58 2012 |
Koji | Optics | General | RoC Test setup | Based on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test. |
 |
23
|
Mon Oct 8 11:30:47 2012 |
Koji | Optics | General | EG&G 2mm photodiode angle response | EGE&G 2mm photodiode angle response
measured by Sam T1100564-v1 |
|
24
|
Tue Oct 9 04:59:24 2012 |
Koji | Optics | General | OMC Test Optical Setup | |
 |
25
|
Tue Oct 9 05:03:15 2012 |
Koji | Electronics | General | OMC Test Electronics Setup | |
 |
26
|
Fri Oct 12 17:15:19 2012 |
Koji | Optics | General | Loan from the 40m / ATF |
HWP set
|
|
28
|
Tue Oct 16 15:50:09 2012 |
Koji | General | General | Work completed in August/September [!] |
Work done
|
|
29
|
Tue Oct 16 15:51:01 2012 |
Koji | General | General | Plan Update: October [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
30
|
Wed Oct 17 20:36:04 2012 |
Koji | Optics | General | RoC test cavity locked | The RoC test setup has been built on
the optical table at ATF.
|
  |
31
|
Thu Oct 18 20:23:33 2012 |
Koji | Optics | Characterization | Improved measurement | Significant
improvement has been achieved in the RoC |
 |
32
|
Wed Nov 7 01:28:20 2012 |
Koji | Optics | Characterization | Wedge angle test (A1) | Wedge
angle test
Result: Wedge angle of Prism A1: |
 |
33
|
Wed Nov 7 20:21:42 2012 |
Koji | General | General | Work completed in October [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
34
|
Wed Nov 7 20:44:11 2012 |
Koji | General | General | Plan Update: November [!] | Completed work of the previous months:
[Jul]
[Aug] |
|
35
|
Thu Nov 8 13:24:53 2012 |
Koji | Optics | Characterization | More wedge measurement | A1
Horiz Wedge 0.497
+/- 0.004 deg |
|
36
|
Thu Nov 8 19:47:55 2012 |
Koji | Electronics | Configuration | Solder for PZTs | Rich saids:
I |
|
37
|
Thu Nov 8 19:52:57 2012 |
Koji | Optics | General | How to apply UV epoxy | KA's question:
Do |
|
38
|
Thu Nov 8 20:12:10 2012 |
Koji | Optics | Configuration | How many glass components we need for a plate | Optical prisms 50pcs (A14+B12+C6+E18)
Curved Mirrors 25pcs (C13+D12)
|
|