40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 1 of 11  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  248   Fri Dec 18 15:33:24 2015 KojiGeneralLoan / LendingLoan from RichLoan Record: I borrowed a PD can opener
from Rich => Antonio Returned Sep
9, 2016
  
  250   Thu Feb 18 21:08:32 2016 KojiGeneralLoan / Lending(all returned) Antonio loanAntonio borrowed: Rich's PD cutter
(returned), Ohir power meter(returned),
Thorlabs power meter head, Chopper
  
  258   Tue Apr 5 18:14:55 2016 KojiGeneralLoan / LendingQPD Lending CrackleXiaoyue

QPD head
X-Z stage
  
  293   Thu May 3 21:45:58 2018 awadeGeneralLoan / LendingBorrowed toaster ovenI’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. 
 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg 
  385   Tue Oct 22 15:54:59 2019 KojiElectronicsLoan / LendingBorrowed LB1005 from Cryo CavFrom Cryo Cav setup

Borrowed LB1005 Servo box ->
OMC
  
  391   Mon Aug 10 15:34:04 2020 KojiFacilityLoan / LendingGlue bake ovenBlack and Decker Glue Baking Oven came
back to the OMC lab on Aug 10, 2020, Georgia
had lent the unit for the SAMS assembly/testing.
  
  518   Tue Apr 4 16:14:06 2023 KojiOpticsLoan / LendingC7 mirror to DownsI handed Camille the C7 mirror for the
cross-calibration of the ROC characterization
techniques.
  
  529   Wed Apr 26 14:43:44 2023 StephenGeneralLoan / LendingBorrowed Items for PZT DC Response Shadow Sensor SetupBorrowed for PZT DC Response Shadow Sensor
Setup (see Attachment 1):


Thorlabs PDA100A Photodiode
 PXL_20230426_185227710.jpg 
  538   Fri May 12 10:00:06 2023 Camille MakaremGeneralLoan / LendingBorrowed Items for PZT DC Response Shadow Sensor SetupThe ThorLabs MDT694B piezo driver was returned
to the OMC lab.

 PXL_20230511_201545235.jpg 
  1   Fri Jun 15 15:45:49 2012 KojiGeneralGeneralOMC PlanLIGO Document G1200683-v1:

aLIGO OMC fabrication and testing
  
  2   Sat Jun 16 08:53:09 2012 KojiGeneralGeneralTo Do ListFacility

    Work
    
  
  3   Wed Jun 20 00:10:53 2012 KojiFacilityGeneralHole on the wall was patched   P6191706.jpg 
  7   Sat Jul 14 02:16:07 2012 KojiGeneralGeneralPlan Update: JulyFacility/Supplies

    Work in progress
 P7071878.jpg 
  10   Mon Jul 23 17:15:14 2012 KojiCleanGeneralTalking with MargotI consulted with Margot about the cleaning
of the optics

    Optics are considered
  
  11   Tue Jul 24 11:41:29 2012 KojiGeneralGeneralUseful referencesNicolas Smith,
LIGO Document T0900383-v1
  
  12   Tue Jul 31 21:29:43 2012 KojiGeneralGeneralWork completed in July [!]
    Completed Work: Facility/Supplies

   
        
  
  13   Tue Jul 31 21:33:17 2012 KojiGeneralGeneralPlan Update: August [!]Completed work of the previous months:
[Jul]
[Aug] [Sep] [Oct] [Nov] [Dec]
  
  14   Wed Aug 1 19:35:00 2012 KojiFacilityGeneralFloor cleaned / Workbench being built / Table top defect-
The floor of the room was cleaned and waxed!
-
 P8011949.JPGP8011947.JPGP8011948.JPG 
  15   Sat Aug 11 00:59:14 2012 KojiFacilityGeneralLaser Safety BarrierIt seemed that a laser safety barrier was
installed today!?
 P8131960.JPG 
  16   Mon Aug 13 16:59:11 2012 KojiCleanGeneralRoom Cleaning LogFloor wiped with a wet wiper (Aug 13, 2012)
Floor wiped with a wet wiper (Aug
15, 2012)
  
  17   Mon Aug 13 17:01:35 2012 KojiCleanGeneralParticle CountsAug 13, 2012 / 0.5um 1000~2000/(0.1 cu
ft) / 0.7um   400-600/(0.1 cu ft)
by ATF particle counter (MET ONE 227A)
  
  18   Tue Aug 14 03:29:06 2012 KojiSupplyGeneralClean supply rackClean supplies & some cleaning tools
are located at the right side of the entrance.
The file cabinet there was moved to
 P8131959.JPGP8131961.JPG 
  19   Wed Aug 22 20:16:43 2012 KojiFacilityGeneralWorkbenches have been installed / Clean room stoolsLast Friday, new workbenches were installed.
Vladimir got a new table and a cleanroom
stool.
 P8171968.jpgP8171969.jpg 
  20   Tue Sep 25 14:18:14 2012 KojiCleanGeneralParticle CountsParticle counts
Before the prefilter is installed:
0.5um 1191cnts, 0.7um 346cnts
  
  21   Mon Oct 1 16:06:55 2012 KojiCleanGeneralParticle Counts1. It turned out that the particle
counter MET ONE 227A at ATF shows 
(particle count)/(0.1 ft^3) 
  
  22   Fri Oct 5 03:39:58 2012 KojiOpticsGeneralRoC Test setupBased on Zach's experiment design, I wrote
up a bit more detailed optical layout for
the mirror test.
 RoC_test_setup.pdfRoC_test_setup.png 
  23   Mon Oct 8 11:30:47 2012 KojiOpticsGeneralEG&G 2mm photodiode angle responseEGE&G 2mm photodiode angle response
measured by Sam T1100564-v1
  
  24   Tue Oct 9 04:59:24 2012 KojiOpticsGeneralOMC Test Optical Setup   OMC_test_setup.pngOMC_test_setup.pdf 
  25   Tue Oct 9 05:03:15 2012 KojiElectronicsGeneralOMC Test Electronics Setup   electronics_setup.pngelectronics_setup.pdf 
  26   Fri Oct 12 17:15:19 2012 KojiOpticsGeneralLoan from the 40m / ATF
    HWP set
         
    
  
  27   Tue Oct 16 14:50:54 2012 jamie, jeffGeneralGeneralOMC breadboard/plate measurement dimensionsWe have measured the dimensions and mass
of the OMC glass plates/breadboards:

  
  28   Tue Oct 16 15:50:09 2012 KojiGeneralGeneralWork completed in August/September [!]
    Work done
   

        
  
  29   Tue Oct 16 15:51:01 2012 KojiGeneralGeneralPlan Update: October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  30   Wed Oct 17 20:36:04 2012 KojiOpticsGeneralRoC test cavity lockedThe RoC test setup has been built on
the optical table at ATF.
 detailed_RoC_setup.pdfomc_cav_lock_SCRN_SHOT.pngCav_scan_response_20121016.pdf 
  33   Wed Nov 7 20:21:42 2012 KojiGeneralGeneralWork completed in October [!]Completed work of the previous months:
[Jul]
[Aug]
  
  34   Wed Nov 7 20:44:11 2012 KojiGeneralGeneralPlan Update: November [!]Completed work of the previous months:
[Jul]
[Aug]
 OMC_Project_Schedule.pdf 
  37   Thu Nov 8 19:52:57 2012 KojiOpticsGeneralHow to apply UV epoxyKA's question:
Do
 UVepoxy.jpg 
  43   Thu Nov 29 21:18:23 2012 KojiOpticsGeneralOMC Mounting Prisms have come   PB293030.JPGPB293032.JPG 
  45   Wed Dec 19 18:47:03 2012 KojiCleanGeneralFirst Contact Training with MargotSteve and I visited Margot to have a training
session for application of First Contact
on optics.
  
  46   Wed Dec 26 14:33:33 2012 KojiFacilityGeneralLase Interlock wiredTwo switches are connected in series.  PC263073.jpgPC263074.jpgPC263075.jpg 
  47   Mon Dec 31 01:45:04 2012 KojiGeneralGeneralWork completed in Nov and Dec [!]Completed work of the previous months:
[Jul]
[Aug]
  
  48   Mon Dec 31 03:10:09 2012 KojiOpticsGeneralSolidWorks model of the OMC breadboard   D1201439_aLIGO_Breadboard_layout_assy_121224.pngD1201439_aLIGO_Breadboard_layout_assy_130105.easm 
  52   Sun Jan 6 23:22:21 2013 KojiMechanicsGeneralSolidWorks model of the OMC suspension    D0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.pngD0900295_AdvLIGO_SUS_Output_Mode_Cleaner_Overall_Assembly.easm 
  57   Tue Jan 22 11:10:25 2013 KojiFacilityGeneralEyeware storage and hooks for the face shields are installedA carpenter has come to install the eyeware
storage and hooks for the face shields.
 P1223116.JPG 
  58   Tue Jan 22 17:56:32 2013 KojiMechanicsGeneralRotary stage selectionNewport UTR80

    Sensitivity: 4 arcsec
  
  61   Thu Feb 7 21:35:46 2013 KojiGeneralGeneralDmass's loan of LB1005 / A2&C2 sent to Fullerton / First Contact @40mDmass
borrowed the LB1005 servo amp from the OMC
lab.
 P2053119.jpgP2053120.JPG 
  69   Thu Mar 7 15:53:47 2013 KojiMechanicsGeneralOMC Transportation fixture, OMC PD/QPD mounts   P3073218.JPGP3073219.JPGP3073223.JPGP3073225.JPGP3073227.JPG 
  70   Thu Mar 14 17:06:21 2013 KojiMechanicsGeneralOMC SUS work @LLOEDIT (ZK): All photos on
Picasa. Also, I discovered that
 2013-03-14_16.03.40.jpg2013-03-14_16.04.07.jpg 
  71   Thu Mar 14 22:18:23 2013 KojiGeneralGeneralNew loans for the diode testALL
returned

Loan
from ATF:
  
  75   Sat Mar 23 02:32:23 2013 KojiFacilityGeneralN2 cylinder deliveredPreparation for ionized N2 blow
- 99.9998% N2 cylinder delivered
(ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ
 P3233349.jpg 
ELOG V3.1.3-