40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
OMC elog, Page 7 of 7 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Sat Nov 21 13:58:30 2020, Koji, Electronics, Characterization, Dark Current Measurement for InGaAs QPDs
|
Sun Nov 22 13:49:12 2020, Koji, Electronics, Characterization, Impedance Measurement for InGaAs QPDs   
|
Mon Nov 23 23:17:19 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs   
|
Tue Nov 24 10:45:07 2020, gautam, Electronics, Characterization, The dark noise of the Q3000 QPDs
|
Tue Nov 24 12:27:18 2020, Koji, Electronics, Characterization, The dark noise of the Q3000 QPDs
|
Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
|
Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts 
|
Thu Jun 23 21:03:33 2022, Koji, Facility, General, Moving the small optical table to CAML (TCS Lab)
|
Tue Jun 28 16:13:34 2022, Koji, General, General, The small optical table not small enough to get out
|
Thu May 20 17:03:50 2021, Koji, General, General, SRS LCR meter SRS720 borrowed from Downs
|
Sun May 30 15:17:16 2021, Koji, General, General, DCPD AF capacitance measirement    
|
Sun May 30 15:32:56 2021, Koji, General, General, DCPD AF capacitance measirement 
|
Fri Jul 22 17:41:01 2022, Koji, General, General, SRS LCR meter SRS720 returned to Downs
|
Mon Jul 25 18:25:04 2022, Koji, General, General, A/C Filter was replaced
|
Fri Jul 15 22:14:14 2022, Koji, General, General, OMC Lab recovery for the OMC #002 test    
|
Tue Jul 26 00:01:59 2022, Koji, General, General, OMC #002 delamination check 2  
|
Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal
|
Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning
|
Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning
|
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets 
|
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
|
Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler
|
Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement
|
Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks
|
Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements
|
Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 
|
Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand
|
Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint
|
Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1)    
|
Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  
|
Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3)  
|
Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4)  
|
Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5)
|
Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  
|
Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed 
|
Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) 
|
Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
|
Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
|
Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1)    
|
Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
|
Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
|
Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup  
|
Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment    
|
Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation    
|
Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation
|
Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep  
|
Tue Sep 20 08:54:33 2022, Koji, General, General, PD cage arrangement
|
Mon Sep 26 14:27:49 2022, Koji, General, General, LLO OMC ICS work
|
Mon Nov 7 21:16:16 2022, Camille, Optics, Configuration, Setting up the fiber couplers  
|
Mon Nov 7 22:00:33 2022, Koji, Optics, Configuration, Setting up the fiber couplers
|
Fri Nov 11 19:07:48 2022, Koji, Supply, General, Supply Order
|
Mon Nov 14 08:34:45 2022, Camille, Optics, Characterization, transmission measurements through OMC #1 (before cleaning) 
|
Mon Nov 14 09:27:13 2022, Koji, Optics, Characterization, transmission measurements through OMC #1 (before cleaning)
|
Tue Nov 15 07:46:58 2022, Camille Makarem, Optics, General, cleaning OMC #1
|
Tue Nov 15 10:58:53 2022, Koji, Optics, General, OMC #1 damaged black glass removal   
|
Tue Nov 15 11:12:24 2022, Koji, Optics, General, OMC #1 fogging on the AR side of BS1 cleaned   
|
Thu Nov 17 18:56:22 2022, Koji, Optics, General, Transmission measurements of OMC #1 after deep cleaning 
|
Thu Nov 17 19:50:00 2022, Koji, Optics, Characterization, Conclusion on the cleaning of OMC #001
|
Fri Nov 18 18:41:05 2022, Camille Makarem, General, General, 2nd deep cleaning of OMC #1
|
Mon Nov 21 19:13:35 2022, Koji, General, General, Transmission measurement (2nd deep cleaning of OMC #1) 
|
Thu Jul 21 13:21:27 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
|
Tue Nov 29 15:54:47 2022, Koji, General, Configuration, Windows laptop for WincamD Beam'R2 recovery
|
Fri Dec 2 11:42:03 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants   
|
Fri Dec 2 12:38:15 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants 
|
Fri Dec 2 23:58:33 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants 
|
Mon Dec 5 20:09:39 2022, Koji, Optics, General, (re)starting the OMC #4 build
|
Fri Dec 9 13:13:13 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission  
|
Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial    
|
Mon Dec 19 18:51:50 2022, Koji, Optics, Characterization, TMS measurement with the PZT voltages altered    
|
Thu Jan 19 23:45:44 2023, Koji, Optics, General, OMC(004) cavity mirror bonding
|
Mon Jan 23 19:51:20 2023, Koji, Optics, General, OMC(004) cavity mirror bonding   
|
Wed Jan 25 23:51:04 2023, Koji, General, General, The items to be passed to Downs
|
|