40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 9 of 9
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
438 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
Tue Apr 16 17:24:56 2019, Koji, Optics, Configuration, OMC(004): E Mirror selection
Tue Apr 16 21:16:11 2019, Koji, Optics, Characterization, OMC(004): PZT testing for spare OMC
Wed Apr 17 10:30:37 2019, Philip, Optics, General, OMC optical set-up day 1
Thu Apr 18 20:47:54 2019, Joe, Optics, , OMC initial alignment and locking
Fri Apr 19 09:21:07 2019, Philip, Optics, , Cleaning of OMC optics
Fri Apr 19 11:34:19 2019, Koji, Optics, , OMC initial alignment and locking
Sat Apr 20 00:50:12 2019, Koji, Optics, Characterization, OMC(004): Spot positions
Tue Apr 23 10:21:12 2019, Joe, Optics, Configuration, Moving the spots to the centre of the curved mirrors
Wed Apr 24 13:58:51 2019, Joe, Optics, Characterization, OMC power budget and UV Epoxy Bonding of BS1
Thu Apr 25 15:05:19 2019, Joe, Optics, Characterization, Looking at PZT HOM spacing dependance and thinking about workflow
Wed May 1 15:40:46 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
Fri May 3 11:06:28 2019, Koji, Optics, Characterization, OMC(004): Spot positions and the scattering
Thu May 9 17:35:07 2019, Koji, Optics, General, Alignment strategy
Thu May 9 18:10:24 2019, Koji, Optics, Characterization, OMC(004): Spot position scan / power budget
Mon May 20 19:53:17 2019, Koji, Optics, Configuration, DCPD high power test
Wed May 22 07:31:37 2019, Koji, Optics, Configuration, Camera test (DCPD high power test)
Thu May 23 01:42:46 2019, Koji, Optics, Characterization, C30665 high power test
Thu May 23 23:27:38 2019, Koji, Optics, Characterization, IGHQEX3000 high power test
Tue May 28 12:14:20 2019, Stephen, Optics, General, CM PZT Assembly Debonding of EP30-2 in Acetone
8x
Mon Jul 1 12:38:49 2019, Koji, Optics, Characterization, A and M prisms perpendicularity measurement
6x
Mon Jul 1 12:49:42 2019, Koji, Optics, Characterization, Scattering measurement of A and C mirrors
Thu Aug 22 12:35:53 2019, Stephen, Optics, Characterization, Wedging of the debonded PZTs 2019 August
Fri Aug 23 11:11:44 2019, shruti, Optics, Characterization, Finding the curvature bottom
Thu Aug 29 11:51:49 2019, shruti, Optics, Characterization, Wedging of the debonded PZTs - Calculation
Thu Sep 5 15:40:42 2019, shruti, Optics, Configuration, PZT Sub-Assembly
Mon Sep 23 21:29:51 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10)
Mon Sep 30 23:16:53 2019, Koji, Optics, General, OMC(004): PZT sub-assembly gluing (#9/#10)
Fri Dec 6 00:55:25 2019, Koji, Optics, General, Beamdump gluing
6x
Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack
Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress
Thu Jan 19 20:57:53 2017, Koji, Supply, General, Purchase
Thu Feb 16 17:23:12 2017, Koji, Supply, General, Purchase
Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase
Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status
Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding
Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019
Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
ELOG V3.1.3-