40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
OMC elog, Page 10 of 10
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
General
Facility
Clean
Supply
Mechanics
Optics
Electronics
478 Entries
Goto page
Previous
1
,
2
,
3
...
8
,
9
, 10
Tue Nov 15 10:58:53 2022, Koji, Optics, General, OMC #1 damaged black glass removal
Tue Nov 15 11:12:24 2022, Koji, Optics, General, OMC #1 fogging on the AR side of BS1 cleaned
Thu Nov 17 18:56:22 2022, Koji, Optics, General, Transmission measurements of OMC #1 after deep cleaning
Thu Nov 17 19:50:00 2022, Koji, Optics, Characterization, Conclusion on the cleaning of OMC #001
Fri Dec 2 11:42:03 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants
Fri Dec 2 12:38:15 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants
Fri Dec 2 23:58:33 2022, Koji, Optics, Characterization, OMC #1 cleaning for water soluble contaminants
Mon Dec 5 20:09:39 2022, Koji, Optics, General, (re)starting the OMC #4 build
Fri Dec 9 13:13:13 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission
Mon Dec 12 19:04:40 2022, Koji, Optics, Characterization, FSR/TMS/Spot Positions/Transmission 2nd trial
Mon Dec 19 18:51:50 2022, Koji, Optics, Characterization, TMS measurement with the PZT voltages altered
Thu Jan 19 23:45:44 2023, Koji, Optics, General, OMC #4: cavity mirror bonding
Mon Jan 23 19:51:20 2023, Koji, Optics, General, OMC #4: cavity mirror bonding
Thu Jan 26 22:57:19 2023, Koji, Optics, General, OMC #4: One Invar block bonded with tilt
Thu Jan 26 23:07:14 2023, Koji, Optics, General, OMC #4: Input beam dump bonding
Thu Jan 26 23:16:35 2023, Koji, Optics, Configuration, OMC #4: Top side bonding.
Thu Jan 26 23:46:13 2023, Koji, Optics, General, OMC #1 input beam dump bonding
Tue Aug 14 03:29:06 2012, Koji, Supply, General, Clean supply rack
Fri May 10 09:33:22 2013, Koji, Supply, General, COMSOL simulation on the glass bracket stress
Thu Jan 19 20:57:53 2017, Koji, Supply, General, Purchase
Thu Feb 16 17:23:12 2017, Koji, Supply, General, Purchase
Thu Apr 4 20:07:39 2019, Koji, Supply, General, Purchase
Wed Sep 18 22:30:11 2019, Stephen, Supply, General, EP30-2 Location and Status
Wed Sep 18 23:16:06 2019, Stephen, Supply, General, Items staged at 40m Bake Lab for PZT Subassembly Bonding
Tue Oct 22 11:56:09 2019, Stephen, Supply, General, Epoxy Status update as of 22 October 2019
Fri Feb 5 07:40:37 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
Wed Jul 7 14:21:50 2021, Stephen, Supply, General, OMC Unit 4 Build Machined Parts
Fri Nov 11 19:07:48 2022, Koji, Supply, General, Supply Order
Goto page
Previous
1
,
2
,
3
...
8
,
9
, 10
ELOG V3.1.3-