40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog, Page 11 of 11  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  94   Thu Apr 4 00:35:42 2013 ZachOpticsConfigurationMMT installed on breadboard, periscope built[Koji, Zach]
 2013-04-03_23.43.00.jpg 
  99   Fri Apr 5 18:18:36 2013 ZachOpticsConfigurationAOM probably broken

    

       
            
 Isomet_1250C_zin_4_5_13.png 
  107   Wed Apr 10 00:40:30 2013 ZachOpticsConfigurationfauxMC locked[Koji, Zach]
 fauxMC_labeled.jpg 
  137   Wed Jun 5 01:06:35 2013 ZachGeneralCharacterizationL1 OMC as-built diagram D1300507
 
 L1OMC_asbuilt.pdf 
  143   Thu Jun 13 12:12:20 2013 ZachGeneralGeneral[LLO] OMC and OMCS in LVEAhttps://alog.ligo-la.caltech.edu/aLOG/index.php?callRep=7395
  
  293   Thu May 3 21:45:58 2018 awadeGeneralLoan / LendingBorrowed toaster ovenI’ve borrowed the black and decker
toaster oven to dry some sonicated parts.
It is temporarly located in the QIL lab. 
 9CE80545-7A58-4236-B7E3-1EE6C4042DAA.jpeg 
  405   Tue Nov 24 10:45:07 2020 gautamElectronicsCharacterizationThe dark noise of the Q3000 QPDsI see that these measurements are done
out to 100 kHz - I guess there is no reason
to suspect anything at 55 MHz which is where
  
  27   Tue Oct 16 14:50:54 2012 jamie, jeffGeneralGeneralOMC breadboard/plate measurement dimensionsWe have measured the dimensions and mass
of the OMC glass plates/breadboards:

  
  286   Sat Jul 29 18:44:38 2017 ranaElectronicsCharacterizationPDH ampattachment 6: DCPD preamp looks like the
opamp is wired for positive feedback?
  
  393   Mon Sep 28 16:03:13 2020 ranaGeneralGeneralOMC Beam Dump Production Cure Bake
are there any measurements of the BRDF
of these things? I'm curious how much
light is backscattered into the incoming
  
  372   Fri Aug 23 11:11:44 2019 shrutiOpticsCharacterizationFinding the curvature bottomI attempted to fit the data taken
by Koji of the beam spot precession at the
CCD in order to find the location of the
 CircleFit.pdfSineFit.pdf 
  373   Thu Aug 29 11:51:49 2019 shrutiOpticsCharacterizationWedging of the debonded PZTs - CalculationUsing the measurements of PZTs 12,13 taken
by Stephen, I estimated the wedging angle
and orientation following Section 2.3.1 of
 PZT_Wedging_Results.pdfPZT_Wedging_Calc.pdf 
  374   Thu Sep 5 15:40:42 2019 shrutiOpticsConfigurationPZT Sub-AssemblyAim: To find the combinations
of mounting prism+PZT+curved mirror to build
two PZT sub-assemblies that best minimises
 Diagrams_SubAssembly.pdfC10_C13_Combinations.pdfPlots_Config_Tolerance.pdf 
ELOG V3.1.3-