40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 82     Entry time: Tue Mar 26 22:33:07 2013
Author: Koji 
Type: General 
Category: General 
Subject: Loan for the OMC building 

Loan from PSL Lab

- 300mm mirror with Ultima mount and pedestal
- Isopropanol small glass bottleReturned on Apr 12 2013.
- Newport 422-1S single-axis stage
Returned on Apr 12 2013.

Loan from ATF Lab

- 50/50 Cube BS 05BC16NP.9 without mount
- 1.5" pedestal (1/4-20 thread), 1/4" shim (1/4-20 through-hole), 1/8" shim (1/4-20 through-hole): 2 eachReturned on Aug 22, 2013.
- PBS & PBS mount
- Newport 422-1S single-axis stageReturned on Apr 12 2013.
- 10 ft BNC cable x 2
- some more BNC (labeled as ATF)Returned on May 20 2013.
- Y1-1037-45P with ultima mount 3inch post
- 1x Newfocus 5104 mirrorReturned on Aug 22, 2013.
- 4x ForkReturned on Aug 22, 2013.

Loan from 40m

- 4 BNC Ts and 1 BNC Ys
- 4 BNC Ts and 1 BNC YsReturned on May 20 2013.
- 6 BNC cablesReturned on May 20 2013.

- SONY CCD / CCD Monitor / CCD power supply
- Optical fiber tester (for fiber alignment) Returned on Apr 9 2013.

ELOG V3.1.3-