Entry  Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18 
    Reply  Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon 
       Reply  Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon 
          Reply  Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed 
             Reply  Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu 
Message ID: 80     Entry time: Mon Mar 25 18:34:25 2013     In reply to: 79     Reply to this: 83
Author: Koji 
Type: General 
Category: General 
Subject: OMC building plan / procedure ~ Mar 25 Mon 

25 March (Mon):

Inspect the test PZT assembly

  • => Give it to Bob. (done)

Glue topside components (done)

  • Clean up the table for the gluing work.
  • Prepare the transport fixture on the table.
  • Glass breadboard
    • Pick breadboard #1 (cf. [ELOG 27])
    • Wipe the entire glass breadboard with IPA
    • Place the breadboard in the fixture (check which is the upper side)
  • Gluing
    • Set the gluing template on the breadboard.
    • Place all of the glass components on the plate (just for confirmation)
    • Wipe (locally) both surfaces to be glued.
    • Apply glue on the component to be glued
    • Align the components in the template. Use the cantilever pusher if necessary.
    • Illuminate UV
    • Repeat the above process for all of the components.
  • Close the transport fixture and wrap with Al foil