Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18
|
Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon
|
Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon
|
Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed
|
Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu
|
|
Message ID: 80
Entry time: Mon Mar 25 18:34:25 2013
In reply to: 79
Reply to this: 83
|
Author: |
Koji |
Type: |
General |
Category: |
General |
Subject: |
OMC building plan / procedure ~ Mar 25 Mon |
|
|
25 March (Mon):
Inspect the test PZT assembly
- => Give it to Bob. (done)
Glue topside components (done)
- Clean up the table for the gluing work.
- Prepare the transport fixture on the table.
- Glass breadboard
- Pick breadboard #1 (cf. [ELOG 27])
- Wipe the entire glass breadboard with IPA
- Place the breadboard in the fixture (check which is the upper side)
- Gluing
- Set the gluing template on the breadboard.
- Place all of the glass components on the plate (just for confirmation)
- Wipe (locally) both surfaces to be glued.
- Apply glue on the component to be glued
- Align the components in the template. Use the cantilever pusher if necessary.
- Illuminate UV
- Repeat the above process for all of the components.
- Close the transport fixture and wrap with Al foil
|