Mon Mar 25 02:04:05 2013, Koji, General, General, OMC building plan / procedure ~ WB18
|
Mon Mar 25 18:34:25 2013, Koji, General, General, OMC building plan / procedure ~ Mar 25 Mon
|
Wed Mar 27 20:54:45 2013, Koji, General, General, OMC building plan / procedure ~ Mar 26 Mon
|
Wed Mar 27 20:54:54 2013, Koji, General, General, OMC building plan / procedure ~ Mar 27 Wed
|
Wed Mar 27 20:55:10 2013, Koji, General, General, OMC building plan / procedure ~ Mar 28 Thu
|
|
Message ID: 79
Entry time: Mon Mar 25 02:04:05 2013
Reply to this: 80
|
Author: |
Koji |
Type: |
General |
Category: |
General |
Subject: |
OMC building plan / procedure ~ WB18 |
|
|
WB 18 March
- Diode test
- Dark current / Dark noise / Impedance
- Quantum Efficiency test (but with glass)
- Diode given to Bob for cleaning
- Research possible issue of UV light on 1064 HR coating
- ~ppm order loss increase after depositing 3J/cm^2 in 8 hours (i.e. same order to our illumination but in 10s for us)
- Sent an e-mail to Ke-Xun Sun -> So far, no reply.
- Glue test of PZT+prism+curved mirror with UV bond epoxy
- Done. Found some handling issues on the fixture.
- Preparation of N2 line:
Action items:
- Bake test at 100°C for 1 hour at CIT
- Will be done on 25 Mon-26 Tue at Bob's lab
- Curved mirror characterization
- R&T measurement
|