40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 75     Entry time: Sat Mar 23 02:32:23 2013
Author: Koji 
Type: Facility 
Category: General 
Subject: N2 cylinder delivered 

Preparation for ionized N2 blow

- 99.9998% N2 cylinder delivered (ALPHAGAZ 2 grade by AIR LIQUIDE) ALPHAGAZ 2 [PDF]

- Filter and Arcing module already in the lab

- A brass regulator to be installed (Done - March 24)

- 50 ft air line already in the lab / needs to be wiped/rinsed (Done - March 24)

- Air line and filter installed (Done - March 24)

Attachment 1: P3233349.jpg  2.511 MB  | Hide | Hide all
P3233349.jpg
ELOG V3.1.3-