40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal 
    Reply  Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning 
       Reply  Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning 
    Reply  Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets IMG_1095.JPGIMG_1091.JPG
    Reply  Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement IMG_1098.JPG
    Reply  Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler fiber_beam_profile.pdf
    Reply  Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement OMC_backscatter.pdf
    Reply  Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks PXL_20220722_222013127.jpg
    Reply  Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements IMG_1118.JPG
       Reply  Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 IMG_1119.JPGIMG_1120.JPG
    Reply  Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand PXL_20220727_072154009.jpg
    Reply  Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint IMG_1125.JPG
    Reply  Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1) IMG_1126.JPGIMG_1135.JPGIMG_1127.JPGIMG_1129.JPGIMG_1130.JPG
    Reply  Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  IMG_1132.JPGIMG_1133.JPGIMG_1136.JPG
    Reply  Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3) IMG_1137.JPGIMG_1148.JPGIMG_1138.JPG
    Reply  Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4) PXL_20220809_235457354.jpgPXL_20220811_011910569.jpgPXL_20220811_013746139.jpg
       Reply  Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5) 
    Reply  Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  IMG_1155.JPGIMG_1149.JPGIMG_1150.JPG
    Reply  Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed IMG_1929.JPGIMG_1930.JPG
    Reply  Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) IMG_1926.JPGPXL_20220816_011346581.jpg
       Reply  Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
          Reply  Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
    Reply  Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1) IMG_1168.JPGIMG_1169.JPGIMG_1170.JPGIMG_1171.JPGIMG_1175.JPG
       Reply  Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
          Reply  Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
    Reply  Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup IMG_1178.JPGIMG_1179.JPGIMG_1180.JPG
    Reply  Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment IMG_1207.JPGPXL_20220825_004259850.jpgPXL_20220825_004307204.jpgPXL_20220825_005423342.jpgPXL_20220825_005549985.jpg
    Reply  Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation DSCN0917.JPGDSCN0922.JPGP6108705.JPGP6108707.JPGP6108706.JPG
       Reply  Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation balance_mass_config_LLO.pdf
    Reply  Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep PXL_20220831_025623318.jpgPXL_20220831_024518032.jpgPXL_20220831_030234581.jpg
Message ID: 429     Entry time: Wed Jul 27 10:34:09 2022     In reply to: 427
Author: Koji 
Type: General 
Category: General 
Subject: High QE PD: QE measurements 2 

- DLPCA-200 trans-impedance amplifier was calibrated.
  Keithley source meter 2450 was connected to the amp. Provide current and read the output voltage with the precision digital voltage meter (Agilent/Keysight).
  Gain: 999.7V/A@7mA, 999.6V/A@8mA

- From the power meter spec, Thorlabs S401C seemed the best (+/-3%). So the QEs of the 9 PDs were checked with this power meter again.

- All PDs exhibited the QE of 0.95~0.96. It's all relative as the power meter has a systematic error.
- Tried to clean B1-22 and B1-23 PDs. They didn't show significant improvement after the cleaning. To avoid the unnecessary risk of damaging the PDs, further cleaning was not performed. (Some photos were attached)

- What we can do is use this result as the relative measurements.
- For OMC#2, B1-22 is the DCPD(T) and B1-23 is the DCPD(R). C1-03 and C1-12 are the spares, according to this latest result.
- At LLO, we track down the source of the throughput reduction (-10%). The QEs of the PDs are going to be tested in the same setup at once to compare their PDs and our PDs.

PD Type SN Case DCV1 Pin [mW] dPin [mW] Power Meter DCV2 Avg(DCV) Std(DCV) DCVOFS (mV) Responsivity [A/W] dR QE dQE Date Note
IGHQEX3000 B1-22 B1 7.734 9.43 0.02 TL 401C 7.745 7.7395 0.006 -0.0260 0.821 0.002 0.957 0.002 July 26, 2022 clean1 / installed (T)
IGHQEX3000 B1-23 B2 7.679 9.26 0.02 TL 401C 7.709 7.6940 0.015 -0.0220 0.831 0.002 0.969 0.003 July 26, 2022 clean1 / installed (R)
IGHQEX3000 C1-03 B3 7.775 9.40 0.02 TL 401C 7.770 7.7725 0.003 -0.0450 0.827 0.002 0.964 0.002 July 26, 2022 clean3
                                 
IGHQEX3000 C1-08 C2 7.717 9.45 0.02 TL 401C 7.750 7.7335 0.017 -0.0430 0.819 0.002 0.954 0.003 July 26, 2022 initial
IGHQEX3000 C1-09 C3 7.737 9.50 0.05 TL 401C 7.776 7.7565 0.019 -0.0580 0.817 0.005 0.952 0.006 July 26, 2022 initial
IGHQEX3000 C1-10 C4 7.757 9.50 0.03 TL 401C 7.774 7.7655 0.009 -0.0650 0.818 0.003 0.953 0.003 July 26, 2022 initial
                                 
IGHQEX3000 C1-11 D1 7.826 9.66 0.01 TL 401C 7.828 7.8270 0.001 -0.0570 0.810 0.001 0.945 0.001 July 26, 2022 initial
IGHQEX3000 C1-12 D2 7.841 9.51 0.02 TL 401C 7.841 7.8410 0.000 -0.0410 0.825 0.002 0.961 0.002 July 26, 2022 initial
IGHQEX3000 C1-14 D3 7.769 9.55 0.01 TL 401C 7.789 7.7790 0.010 -0.0520 0.815 0.001 0.950 0.002 July 26, 2022 initial
Attachment 1: IMG_1119.JPG  5.717 MB  Uploaded Wed Jul 27 12:25:01 2022  | Hide | Hide all
IMG_1119.JPG
Attachment 2: IMG_1120.JPG  5.673 MB  Uploaded Wed Jul 27 12:25:01 2022  | Hide | Hide all
IMG_1120.JPG
ELOG V3.1.3-