Mon Jul 18 14:20:09 2022, Koji, General, General, OMC #002 Plan Portal
|
Tue Jul 19 03:17:56 2022, Koji, General, General, OMC #002 Power Budget before mirror cleaning
|
Thu Jul 21 02:55:06 2022, Koji, General, General, OMC #002 Power Budget after mirror cleaning
|
Thu Jul 21 14:35:35 2022, Koji, General, General, Bond reinforcement blocks for the invar brackets 
|
Thu Jul 21 14:55:48 2022, Koji, General, General, Optics bonding for the backscatter measurement
|
Thu Jul 21 17:47:00 2022, Koji, General, General, The profile of the beam incident on the fiber input coupler
|
Fri Jul 22 00:31:17 2022, Koji, General, General, OMC #002 backscatter measurement
|
Fri Jul 22 17:47:38 2022, Koji, General, General, C&B request for the reinforcement blocks
|
Tue Jul 26 00:12:58 2022, Koji, General, General, High QE PD: QE measurements
|
Wed Jul 27 10:34:09 2022, Koji, General, General, High QE PD: QE measurements 2 
|
Wed Jul 27 10:09:51 2022, Koji, General, General, 4+4 wire clamp in hand
|
Wed Jul 27 10:34:30 2022, Koji, General, General, OMC #002 Protective FirstContact Paint
|
Wed Jul 27 23:52:18 2022, Koji, General, General, OMC #002 Cable bracket replacement (1)    
|
Thu Jul 28 00:28:15 2022, Koji, General, General, OMC #002 Cable bracket replacement (2)  
|
Thu Jul 28 00:46:47 2022, Koji, General, General, Subject: OMC #002 Cable bracket replacement (3)  
|
Wed Aug 10 18:42:27 2022, Koji, General, General, OMC #002 Cable bracket replacement (4)  
|
Thu Aug 11 15:24:57 2022, Koji, General, General, OMC #002 Cable bracket replacement (5)
|
Mon Aug 15 21:31:56 2022, Koji, General, General, OMC #002 Cable bracket replacement (6)  
|
Mon Aug 15 22:06:18 2022, Koji, General, General, OMC #002 new cable tie installed 
|
Mon Aug 15 22:43:35 2022, Koji, General, General, OMC #002 Delamination repair Part1 (1) 
|
Mon Aug 15 22:49:03 2022, Koji, General, General, OMC #002 Delamination repair Part1 (2) 7x
|
Wed Aug 24 02:51:23 2022, Koji, General, General, OMC #002 Delamination repair Part1 (3) 8x
|
Wed Aug 24 02:53:46 2022, Koji, General, General, OMC #002 Delamination repair Part2 (1)    
|
Wed Aug 24 03:20:59 2022, Koji, General, General, OMC #002 Delamination repair Part2 (2) 11x
|
Wed Aug 24 03:26:43 2022, Koji, General, General, OMC #002 Delamination repair Part2 (3) 8x
|
Wed Aug 24 02:57:43 2022, Koji, General, General, EP30-2 bonding setup  
|
Wed Aug 24 11:29:47 2022, Koji, General, General, OMC #002 ready for shipment    
|
Thu Aug 25 14:22:08 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation    
|
Thu Aug 25 20:05:00 2022, Koji, General, General, LLO OMC #001 Ballast Mass investigation
|
Fri Aug 26 22:29:02 2022, Koji, General, General, Tool Shipping Prep  
|
|
Message ID: 421
Entry time: Thu Jul 21 17:47:00 2022
In reply to: 415
|
Author: |
Koji |
Type: |
General |
Category: |
General |
Subject: |
The profile of the beam incident on the fiber input coupler |
|
|
The profile of the beam incident on the fiber input
The fiber input was deflected by a 45deg mirror. The beam profile was measured with WincamD. The beam was too strong (~60mW) even at the smallest pump power (ADJ -50) of the NPRO. So the two ND20 filters were added to the lens right before the 45 deg mirror and the camera.
The measured profile had some deviation from the nice TEM00 particularly around the waist. This could be a problem of the too small beam on the ND filter and the CCD.
This is not an issue as we just want to know the approximate shape of the beam.
For the fiber coupling, if we have the beam waist radius of ~200um it is sufficient for decent coupling. |
|
|