40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake IMG_6080.JPGIMG_6079.JPG
    Reply  Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake P_20191218_160650_vHDR_On.jpegP_20191218_160705_vHDR_On.jpegP_20191218_160733_003.jpeg
       Reply  Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake 
          Reply  Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake 
Message ID: 388     Entry time: Wed Dec 18 21:54:53 2019     In reply to: 387     Reply to this: 393
Author: Koji 
Type: General 
Category: General 
Subject: OMC Beam Dump Production Cure Bake 

The beamdumps were taken out from the oven and packed in bags.

The bottom of the V are completely "wet" for 17 BDs among 20 (Attachment 1/2).

3 BDs showed insufficient glue or delamination although there is no sign of lack of rigidity. They were separated from the others in the pack.

Attachment 1: P_20191218_160650_vHDR_On.jpeg  937 kB  | Hide | Hide all | Show all
P_20191218_160650_vHDR_On.jpeg
Attachment 2: P_20191218_160705_vHDR_On.jpeg  1.194 MB  | Show | Hide all | Show all
Attachment 3: P_20191218_160733_003.jpeg  1.192 MB  | Show | Hide all | Show all
ELOG V3.1.3-