40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
OMC elog |
Not logged in |
 |
|
Fri Dec 13 14:59:18 2019, Stephen, General, General, OMC Beam Dump Production Cure Bake 
|
Wed Dec 18 21:54:53 2019, Koji, General, General, OMC Beam Dump Production Cure Bake  
|
Mon Sep 28 16:03:13 2020, rana, General, General, OMC Beam Dump Production Cure Bake
|
Mon Sep 28 16:13:08 2020, Koji, General, General, OMC Beam Dump Production Cure Bake
|
|
Message ID: 388
Entry time: Wed Dec 18 21:54:53 2019
In reply to: 387
Reply to this: 393
|
Author: |
Koji |
Type: |
General |
Category: |
General |
Subject: |
OMC Beam Dump Production Cure Bake |
|
|
The beamdumps were taken out from the oven and packed in bags.
The bottom of the V are completely "wet" for 17 BDs among 20 (Attachment 1/2).
3 BDs showed insufficient glue or delamination although there is no sign of lack of rigidity. They were separated from the others in the pack. |
|
|
|
|