40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Mon Apr 22 09:54:21 2019, Joe, General, , Shortening cavity (A5,A14,PZT11,PZT22) to get closer to design FSR CM1_IMG_7699.jpgCM2_IMG_7697.jpg
    Reply  Mon Apr 22 19:54:28 2019, Koji, General, , OMC(004): Spot positions at the end of Apr 22nd misalignment4.pdf
Message ID: 352     Entry time: Mon Apr 22 19:54:28 2019     In reply to: 351
Author: Koji 
Type: General 
Category:  
Subject: OMC(004): Spot positions at the end of Apr 22nd 
Attachment 1: misalignment4.pdf  5.840 MB  Uploaded Mon Apr 22 20:54:50 2019  | Hide | Hide all
misalignment4.pdf
ELOG V3.1.3-