40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 219     Entry time: Sat Jan 17 11:40:04 2015
Author: Koji 
Type: General 
Category: General 
Subject: 3rd OMC completed 

Jan 15, 2015 3rd OMC completed

The face caps of the DCPD/QPD cables were installed (Helicoils inserted)
PD7&10 swapped with PD11(for DCPD T) and PD12(DCPD R).
Firct Contact coating removed

Note on the 3rd OMC

Before the 3rdOMC is actually used,

- First Contact should be applied again for preventing contamination during the installation

- DCPD glass windows should be removed

ELOG V3.1.3-