40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 212     Entry time: Sun Jul 20 17:20:39 2014
Author: Koji 
Type: General 
Category: General 
Subject: The 3rd (LIO) OMC was shipped out to LHO  

The 3rd (LIO) OMC was shipped out to LHO on Friday (Jul 18) Morning.

At LHO

- All of the on-breadboard cables should be attached and tied down.

- Peel First Contact paint and pack the OMC for storage.

 

ELOG V3.1.3-