  OMC elog  Not logged in ELOG logo
Message ID: 2     Entry time: Sat Jun 16 08:53:09 2012
Author: Koji 
Type: General 
Category: General 
Subject: To Do List 

Facility

Mechanics

  • Work 
    •  
  • Design
    • How do we hold the PDs, QPDs, and black glass - we put 2 PDs and 2 QPDs on the PD mounting blacket.
    •  
  •  
  • Test
     
  • Things to be tested
    • New suspension scheme (cup & cone design)
    • Balancing the plates
    • Dummy metal payload?
  • => Suspending test with a suspension cage for a Faraday isolator@CIT
    • Supporting block for the suspension cage (to mimic the OMC suspension)
  • Things to be designed
    • Wire end (cone)
    • Diode holding structures
      PD/QPD/PZT holding structure
  • PZT alignment
  • Prototyping with metal parts?
  • UV glue? (heat) / gluing test
  • Balance / ballast
     
  • Solid works

Optics

  • Mirrors to be delivered ~Aug
  • Design down select
    • Between "Single output & BS" vs "Two outputs & no BS"
  • Mode design
  • Finalization of scattering paths / PD angles etc
     
  • Things to be decided / confirmed:
    • How to handle optics / assemblies (Talk to the prev people)
    • First contact? (Margot: applicable to a short Rc of ~2.5m)
    • Gluing templates to be designed (how to handle it?)
  • Things to be tested:
    • R&T of each mirror
    • Cavity ref/trans/finesse
    • PD QE / incident angle
       
  • What PD do we use?
     
  • CCD beam analyzer (Zach: It is fixed.)
     
  • PD angle measurement
  • Obtain EG&G 3mm PDs

Electronics

  • Electronics / CDS electronics / software
     
  • Things to be tested
    • QPD/PD pre-selections (QE/noise)
    • Functionality test of QPD/PD/PZT

Shipping, storage etc


Jun/July
    - Lab renovtion
    - Mechanics design
    - Glue training
Aug
    - Mirror delivery
    - Basic optics test
Sept
    - Cavity test
    - Suspending test
NOV~DEC
    - Shipping to LLO

Open questions
    Two optical designs
    Procedure
    Modeling
    Clamp design / stencil design
    gluing-installation procedure