40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Entry  Tue Jun 24 18:43:15 2014, Koji, General, General, ICS entries for the OMC baking/assembly 
    Reply  Fri Jun 27 12:29:50 2014, Koji, General, General, OMC baking P6266536.jpg
       Reply  Wed Jul 2 16:41:43 2014, Koji, General, General, OMC baking 
Message ID: 193     Entry time: Wed Jul 2 16:41:43 2014     In reply to: 191
Author: Koji 
Type: General 
Category: General 
Subject: OMC baking 

OMC is back from the oven today.

To Do:

Optical tests

  • Cleaning
  • Power Budget
  • FSR measurement
  • TMS measurement
  • TMS measurement (with DC voltage on PZTs)
  • PZT DC response
  • PZT AC response
  • QPD alignment
  • DCPD alignment
  • First Contact

Backscattering test

Cabling / Wiring

  • Attaching cable/mass platforms
  • PZT cabling
  • DCPD cabling
  • QPD cabling

Vibration test

Packing / Shipping

ELOG V3.1.3-