40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 19     Entry time: Wed Aug 22 20:16:43 2012
Author: Koji 
Type: Facility 
Category: General 
Subject: Workbenches have been installed / Clean room stools 

Last Friday, new workbenches were installed. Vladimir got a new table and a cleanroom stool.

P8171968.jpg

The other two workbenches were also nicely set.

P8171969.jpg

ELOG V3.1.3-