40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  OMC elog  Not logged in ELOG logo
Message ID: 14     Entry time: Wed Aug 1 19:35:00 2012
Author: Koji 
Type: Facility 
Category: General 
Subject: Floor cleaned / Workbench being built / Table top defect 

- The floor of the room was cleaned and waxed!

- Sticky mats are placed! Now we require shoe covers!

P8011949.JPG

- Work benches are being built. One unit is done.

P8011948.JPG

- The other is half done because the table top has chippings.

P8011947.JPG

ELOG V3.1.3-